Jp/B416-999-Cf-T-8202/1015 - Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl , Sp-0 Description Peb Warehouse And Workshop Works Of Cbr, Gurgaon-Haryana

Chennai Petroleum Corporation Limited-CPCL has published Jp/B416-999-Cf-T-8202/1015 - Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl , Sp-0 Description Peb Warehouse And Workshop Works Of Cbr. Submission Date for this Tender is 11-10-2022. Miscellaneous Fasteners Tenders in Gurgaon Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

32895257
Corrigendum : Jp/B416-999-Cf-T-8202/1015 - Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl , Sp-0 Description Peb Warehouse And Workshop Works Of Cbr
Open Tender
Indian
Haryana
Gurgaon
11-10-2022

Tender Details

Jp/B416-999-Cf-T-8202/1015 - Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl Peb Warehouse And Workshop Package For Cauvery Basin Refinery (Cbr) Project Of Cpcl , Sp-0 Description Peb Warehouse And Workshop Works Of Cbr Project On Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works: Detailed Engineering, Preparation Of Datasheets,Specifications For Procurement, Gad & Layouts, Engineering & Fabrication Drawings, Procurement & Construction Schemes, Control Logics, Cause And Effect Diagram, Electrical System Studies, Statutory Approval From Various Statutory State & Central Government Bodies, Review / Approval Of Drawings & Documents From Owner/ Eil, Supply Of Documents / Manuals , 3-D Modelling, As Built And Final Documentation And Completing All Works As Per The Bid Document Requirements. Supply Of All Equipment And Materials But Not Limited To - Procurement Services, Shop Fabrication , Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight, Air Freight And Inland Freight; Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc.; Supply Of Start-Up / Pre-Commissioning / Commissioning / Mandatory Spares; Supply Of Consumables, Chemicals / Lubricants/Refigerant And Replenishment Of Any Loss During Commissioning And Pg Testing Of Operation And Maintanence Of 6 (Six) Months Period After Commissioning As Per Technical Specifications For Completing The Work In All Respects As Per Provision Of Bidding Document. Construction / Erection Including But Not Limited Toloading/Unloading Of The Materials At Contractor’S Warehouse ; Transportation Of The Materials From Contractor’S Workshop / Store To Erection Site; Assembly / Sub-Assembly Of The Equipment, Erection, Installation, Testing, Inspection; Pre-Commissioning / Commissioning And Pgtr Of The Various Systems; Training To Owner Personals, Handing Over To Owner Including All Disciplines Of Work As Per Tender Requirements Such As Structural, Civil, Mechanical, Piping, Electrical, Instrumentation, Insulation, Painting; Supply Of All Accessories And Materials For Erection / Testing; Supply Of All Consumables; Providing All Construction Plants, Equipments, Special Tools; Providing Supervisory Personnel, Tradesman Skilled / Unskilled Labour; Insurance In Contractor’S Scope; Completing All Works In All Respects As Per Provisions Of Bidding Document. Completion Of All Works In All Respects As Per Provisions Of The Bidding Document And Directions Of The Engineer-In-Charge, Including Any Other Activity Of Work Required To Complete The Peb Ware House And Workshop In All Respects To Make Them Functional. , Sp 01 ( Supply Portion ) , Supply Of All Equipment And Materials But Not Limited To - Procurement Services, Shop Fabrication , Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight, Air Freight And Inland Freight; Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc.; Supply Of Start-Up / Pre-Commissioning / Commissioning / Mandatory Spares; Supply Of Consumables, Chemicals / Lubricants/Refigerant And Replenishment Of Any Loss During Commissioning And Pg Testing Of Operation And Maintanence Of 6 (Six) Months Period After Commissioning As Per Technical Specifications For Completing The Work In All Respects As Per Provision Of Bidding Document. , Lumpsum Price Of 1.1 Above , Sp-02 (Services Portion) , Detailed Engineering, Preparation Of Datasheets,Specifications For Procurement, Gad & Layouts, Engineering & Fabrication Drawings, Procurement & Construction Schemes, Control Logics, Cause And Effect Diagram, Electrical System Studies, Statutory Approval From Various Statutory State & Central Government Bodies, Review / Approval Of Drawings & Documents From Owner/ Eil, Supply Of Documents / Manuals , 3-D Modelling, As Built And Final Documentation As Per Bidding Document Requirements. , Construction, Installation Etc. And Completion Of Entire Work In All Respects For Pre Engineered Ware House Package Including Transportation And Site-Handling Of Material/Equipment, Supply Of Consumables, Tools And Tackles, Field Engineering Services, Receipt, Storage, Conservation Of Fim And Contractor-Supplied Items. Fabrication, Construction, Assembly, Erection At Site For All Piping, Civil, Structural, Architectural, Mechanical, Electrical And Instrumentation Works Within Battery Limit Including Insulation, Coating,Painting, Testing, Etc. ,Providing All Temporary Works/Structures And Equipment For Completion, Obtaining Statutory Approvals, Pre-Commissioning, Commissioning, Performance Guarantee Test Runs Of The Various Systems, Providing Training To Owner Personnel And Complete All The Work In All Respects To Make System Smooth, Operable Until Handing Over As Per The Bidding-Document Requirements And Instructions/Satisfaction Of The Engineer In Charge. , Lumpsum Price Of 2.1 & 2.2 Above , Sp-0 (Total Of Sp-1 + Sp-2)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 01-Jul-2022 Corrigendum -01 Other 26-07-2022
2 18-Jul-2022 COMMERCIAL AMENDMENT NO.B416-8202-1015-CA-01 Other 26-07-2022
3 18-Jul-2022 PBQR_LOT-1 Other 26-07-2022
4 26-Jul-2022 BDD EXTENSION Date 10-08-2022
5 11-Aug-2022 BID DUE DATE EXTENSION- 02 Date 25-08-2022
6 24-Aug-2022 PBQR LOT-2 Other 25-08-2022
7 24-Aug-2022 TA-01 Technical Bid 25-08-2022
8 24-Aug-2022 BID DUE DATE EXTENSION -03 Date 01-09-2022
9 31-Aug-2022 PBQR LOT-3 Other 01-09-2022
10 02-Sep-2022 BID DUE DATE EXTENSION -04 Date 19-09-2022
11 20-Sep-2022 BDD EXTENSION -05 Date 03-10-2022
12 03-Oct-2022 BDD EXTENSION -06 Date 11-10-2022

Key Value

Document Fees
Refer document
EMD
INR 2375000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: PEB WAREHOUSE AND WORKSHOP TENDER FOR CAUVERY BASIN REFINERY (CBR) PROJECT of CPCL
Sl. No. Item Description
1SP-0 DESCRIPTION PEB WAREHOUSE AND WORKSHOP WORKS OF CBR PROJECT ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Detailed engineering, preparation of Datasheets,specifications for procurement, GAD & Layouts, engineering & fabrication drawings, Procurement & Construction schemes, Control logics, cause and effect diagram, Electrical system studies, Statutory approval from various Statutory state & central Government bodies, review / approval of drawings & documents from OWNER/ EIL, supply of documents / manuals , 3-D modelling, AS BUILT and final documentation and completing all works as per the bid document requirements. Supply of all equipment and materials but not limited to - procurement services, shop fabrication , third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight, air freight and inland freight; custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc.; supply of start-up / pre-commissioning / commissioning / mandatory spares; supply of consumables, chemicals / lubricants/refigerant and replenishment of any loss during commissioning and PG testing of operation and maintanence of 6 (six) months period after commissioning as per technical specifications for completing the work in all respects as per provision of Bidding Document. Construction / Erection including but not limited toloading/unloading of the materials at Contractor’s warehouse ; transportation of the materials from Contractor’s workshop / Store to erection site; assembly / sub-assembly of the equipment, erection, installation, testing, Inspection; pre-commissioning / commissioning and PGTR of the various systems; training to Owner personals, handing over to owner including all disciplines of work as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting; supply of all accessories and materials for erection / testing; supply of all consumables; providing all construction plants, equipments, special tools; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the PEB ware house and workshop in all respects to make them functional."
2SP 01 ( Supply portion )
3Supply of all equipment and materials but not limited to - procurement services, shop fabrication , third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight, air freight and inland freight; custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc.; supply of start-up / pre-commissioning / commissioning / mandatory spares; supply of consumables, chemicals / lubricants/refigerant and replenishment of any loss during commissioning and PG testing of operation and maintanence of 6 (six) months period after commissioning as per technical specifications for completing the work in all respects as per provision of Bidding Document.
4LUMPSUM PRICE OF 1.1 ABOVE
5SP-02 (Services Portion)
6Detailed engineering, preparation of Datasheets,specifications for procurement, GAD & Layouts, engineering & fabrication drawings, Procurement & Construction schemes, Control logics, cause and effect diagram, Electrical system studies, Statutory approval from various Statutory state & central Government bodies, review / approval of drawings & documents from OWNER/ EIL, supply of documents / manuals , 3-D modelling, AS BUILT and final documentation as per Bidding Document requirements.
7Construction, installation etc. and completion of entire work in all respects for Pre Engineered Ware House package including Transportation and site-handling of material/equipment, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation of FIM and contractor-supplied items. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit including insulation, coating,painting, testing, etc. ,providing all temporary works/structures and equipment for completion, obtaining statutory approvals, Pre-commissioning, commissioning, performance guarantee test runs of the various systems, providing training to owner personnel and complete all the work in all respects to make system smooth, operable until handing over as per the Bidding-Document requirements and instructions/satisfaction of the Engineer In Charge.
8LUMPSUM PRICE OF 2.1 & 2.2 ABOVE
9SP-0 (TOTAL OF SP-1 + SP-2)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail