Jammu And Kashmir Horticulture Produce Marketing And Processing Corporation Limited has published Request For Proposal For Design, Supply, Installation, Testing And Commissioning Of Equipment Including Construction Work For New 5000 Mt Controlled Atmosphere ( Ca ) Store Under Greenfield At Behrampora, Baramulla, Jammu And Kashmir- 1 5. Submission Date for this Tender is 25-08-2022. Demolition Work Tenders in baramulla Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 07-Jul-2022 | Corrigendum | Technical Bid | 29-07-2022 |
2 | 28-Jul-2022 | Corrigendum-2 | Date | 08-08-2022 |
3 | 30-Jul-2022 | Corrigendum-3 | Technical Bid | 08-08-2022 |
4 | 05-Aug-2022 | Corrigendum-4 | Technical Bid | 08-08-2022 |
5 | 08-Aug-2022 | Corrigendum-5 | Date | 18-08-2022 |
6 | 18-Aug-2022 | Corrigendum-6 | Date | 25-08-2022 |
7 | 22-Aug-2022 | Corrigendum-7 | Other | 25-08-2022 |
Sl. No. | Item Description |
1 | 5000 MT CA Store at Behrampora, Baramulla, J&K |
2 | Site Development and Demolition Work as per per the details mentioned in the Tender Document. |
3 | Plinth work for PEB structure as per Technical specification given in Tender Document. |
4 | Pre-Engineered Steel Structure Building (PEB) as per technical specifications including steel built-up section at Mezzanine Floor level with RCC slab over Steel Decking Sheets. |
5 | Construction of the Allied structures Like Machine Room, Office Building, Labour Building, Canteen & Drivers Block, Toilet Block as per Technical Specification Mentioned in the Tender Document. |
6 | Supply Installation Testing & Commissioning of the Refrigeration system with Six Months Trial Run of Suitable Capacity and Specification as per the Tender Document. |
7 | Supply, Installation, Successful Testing and Commissiongwith Six Months Trial RunCompletion of Apple Grading Line as per the Specifications mentioned in the Tender Document. |
8 | Supply, Installation, Successful Testing and Commissiong of the Fire Fighting for the Complete Store as per the Specifications Mentioned in the Tender Document with Six Months Trial Run. |
9 | Supply, Installation, Successful Testing and Commissiongof Controlled Atmosphere (CA)- Equipment with Six Months Trial Run. |
10 | Supply, Installation, Successful Testing and Commissiong of theElectrical & Instrumentation (E & I) Equipment as per the Specification Mentioned in the Tender Documents with Six Months Trial Run. |
11 | Submission ofFinal "As built drawing", providing training, manual & obtaining all statutory clearances and opretional cost for 6 months |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail