|
| 1 | FOUR WHEELS ALIGMENT / REPAIR Alignment / repairing of all the four wheels after dismantling . Segregation of components, washing properly all the components in HSD. P/ F of front wheel brg. Inner 2 nos. front wheel brg. Outer 1 no. rear wheel brg. outer 1 no. rear inner bearing 1 no.,oil seals4 nos. front and rear brake shoelining 4 sets, brake shoe springs, 2 nos. wheel cam kit 2 nos. tie rod assembly 1 no. brake oil – 1 ltr.,Brake drum 2 nos. Brake shoe, 1 no. greasing of all the wheels , adjustment of brakes after providing and fitting of servo kit and brake pipes. Complete job including labour and material cost. |
| 2 | REPAIR TO THE PROPELLER SHAFT:- Repair to the propeller shaft by dismantling. Providing and fitting of 3 nos. UJ cross, 3 Nos. holder, 3 Nos. shaft coupling, 1 set yoke and teeth, 1 No. centre bearing assembly complete, 10 Nos. shaft bolts with nuts by cutting the old worn out yoke and teeth assembling and fitting of all the parts and also p/f of 1 No. water body assembly complete 1 set hose pipe set with cleanings 1 set fan belt and 1 No. turbo pipe. Complete job includes cost of material and labour charges. |
| 3 | REAR LEAF SPRING ASSY.Dismantling ofleaf spring assemblies. Segregation of distorted leaves. Providing and fitting of main leaf rear 1 no.. Aux. leaves 3 no. 4th leaf 1no 5threar 2nos. rearmain leaves 2nos,2nd rear 1no,4th front 1no,5th front 2nos., Leaf spring Bush1 set, U bolt front and rear 4 no. centre bolt front and rear 4 nos.Leaf spring pin 2 nos. shocker 2 nos. U clamp 8 nos. Hangers -2nos.Retensioningofleaf springbefore fitting. Greasing of all the pins.Complete job including labour and material cost. |
| 4 | Lubrication of M.Oil. Change of Engine Oil of vehicle & Transmission after flushing old used oils. P/F of Oil fitter. By pass filter fuel filter. Air filter and safety Air Filter ,Air cleaner rubber. Engine oil, Gear oil andComplete job including labour and material cost. |
| 5 | REPAIR TO ELECTRICAL WIRING .Repair to electrical system of vehicle after removing worn out and burnt wiring. Providing and fitting of new wiring where ever required. Providing and fitting of1 no. head light assy.. 2 nos. Tail lamp assembly, indicator glasses. Complete job including labour and material cost. |
| 6 | REPEAR TO THE RADIATOR OF THE TANKER. By way of dismantling ofradiator from the tanker. Cleaning it properly with water thensoldering its fins where ever required and then checking it. Providing and topping of coolant and providing & fittingtank, hose pipe set ,Fan belt sets, Thermostat and upper tank body. Assembling of all parts. Complete job required cost of labour and material etc. |
| 7 | REPAIR TO TURBO CHARGERby dismantling. Providing and fitting of 1 No. turbo core assembly, 1 No. turbo pipe 1 set, air filter set complete assembling of all the parts. Complete job with cost of material and labour charges. |
| 8 | PAINTING AND LETTER WRITING.Complete washing of the vehicle. Making of surface ofafter application of car solder and rubbing thereof. Spraying of one coat of red – oxide . Metal Primer inside and outside the tank and chassis of vehicle. The spraying of 2 coats of deco paint on the tank and on the vehicle. Complete letter writing on the vehicle including the tank and number plates.Complete job including labour and material cost. |
| 9 | FABRICATION OF SEATS AND BACKS Fabrication of seats and backs after removing of all the Old / worn out seats , providing and fitting of ply board, springs, coir, foam , Rexene and cloth. Patching work inside the seats. Fitting of seats after providing hinges etc. Complete job including cost of labour and material cost. |
| 10 | Upkeepment of 6000 GPH x 80 mtrx 12.5 HP Submersible Pumpset of T/well Sec-14 Nanak Nagar by way of disconnection of power supply and extraction of Submersible Pumpset using skilled labour with allied tools and tackles. Dismantling and shifting of pumpset to workshop by Mech. Transport. Repairing by Providing, fabrication and fitting of S.S pump shaft as per sample, 8no. impellers, 6 no. pump bodies, 8no. neck rings, 8no. body bushes, SS coupling pulley and nut bolts and assembling of punp atworkshop. The Job includes dismantling and repairing of 12.5 HP Submersible motor by providing, fabrication and fitting of thrust pad set and rotor bushes. Assembling of the motor, coupling with pump and testing the pumpset in the test pit then shifting of pumpset to the site of installation. Making electrical connections of motor with sub cable by making leak proof joint and lowering of pump set along with providing and replacing rubber gaskets and nut bolts. Making connections of submersible cable with panel and then testing on full load |