National Hydroelectric Power Corporation Limited has published Supply, Installation, Testing And Commissioning Works Of Automatic Boom Barrier System At Nhpc Office Complex And Nhpc Residential Complex, Faridabad. Submission Date for this Tender is 15-07-2022. Gate Barrier Systems Tenders in faridabad Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Jun-2022 | Corrigendum_No_01 | Date | 15-07-2022 |
Sl. No. | Item Description |
1 | PART-1 (SITC OF AUTOMATIC BOOM BARRIER SYSTEM) |
2 | Supply, installation , testing, commissioning of Boom Barrier of 2.0 mtr boom length to 8.3 mtr boom length with Brushless Motor with Hydraulic,Motor Brushless, Material type Steel, andas detailed in Technical Specification and scope of work,complete with all cables/ wires terminations & complete in all respect as required. |
3 | Supply, installation, testing, commissioning of Recessed/Surface mounted/ Pole mounted Long Range Weigand (Card Reader) including Reader Mounting MS Pole - (26/32/34 bit) based vehicle tag scanner with required clamp with nut/ bolts & fixing arrangement , IP66, for long distance (upto 12 m).and as detailed in Technical Specification and scope of work,complete with all cables/ wires terminations & complete in all respect as required. |
4 | Supply, installation, testing and commissioning of Single Door Controller (i.e. 2 Readers)for Controlling the above card readers with LAN onboard, TCP/IP interface as per specification mentioned including all accessories, fixing on wall with required accessories such as fasteners/ bolts etc, housing and as detailed in Technical Specification and scope of work,complete with all cables/ wires terminations & complete in all respect as required. |
5 | Supply, installation, testing and commissioning of RFID Windshield Tags, Readable range upto 12 Mtr, Compliance Standard should be EPC Class1 Gen2,TID 64 Bit Unique, EEPROM data retention 10 years EEPROM write endurance 100,000 cycles and as detailed in Technical Specification and scope of work,complete with all cables/ wires terminations & complete in all respect as required. |
6 | Supply, installation, testing and commissioning of Software forRFID Solution as detailed in Technical Specification and scope of work,complete in all respect as required. |
7 | Supply , installation, testing and commissioning of Server For RFID SoftwareProcessor: 10th Generation Intel Core i3-10100 Processor (6MB Cache, 4Cores, 3.60 GHz up to 4.20 GHz), Memory & Storage:8GB DDR4 2666MHz DIMM,Storage: 1TB 7200RPM SATA 6Gb/s , as detailed in Technical Specification and scope of work,complete in all respect as required. |
8 | Supply , installation, testing and commissioning of UPS 2 KVA with 30 Minutes Battery Backup. |
9 | Supply, installation, testing and commissioning of 8 PORT Network switch . |
10 | Supply, Installation, Testing & Commissioning of Media Converter |
11 | Supply, Installation, Testing & Commissioning of Patch Cord 3 Mtr- |
12 | Supply,Installation, Testing & Commissioning of 4 U Rack with all Accessories |
13 | Supply,Installation, Testing & Commissioning of Plastic Road Hump Safety Speed Breaker in Black & Yellow Colour for High Visibility. |
14 | Supply, Installation, Testing & Commissioning of 6 core Optical Fibre Cable with 15 mm HDPE Pipe. |
15 | Supply, installation, testing and commissioning of 3 Core 1.5 mm Cable. |
16 | Supply, installation, testing and commissioning of 2 Core 1.5 mm Cable. |
17 | Supplying and drawing of UTP 4 pair CAT 6 LAN Cable in the existing surface/ recessed Steel/ PVC conduit as required, includingtesting and commissioning of CAT 6 Cable |
18 | Supplying and fixing of 20mm diaof medium class PVC conduit along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required. |
19 | PART-B COMPREHENSIVE ANNUAL MAINTENANCE CHARGES (CAMC) |
20 | Comprehensive Annual Maintenance Charges for 1 st year after completion of warranty period of SITC part |
21 | Comprehensive Annual Maintenance Charges for 2 nd year after completion of warranty period of SITC part |
22 | Comprehensive Annual Maintenance Charges for 3 rd year after completion of warranty period of SITC part |
23 | Comprehensive Annual Maintenance Charges for 4 thyear after completion of warranty period of SITC part |
24 | Comprehensive Annual Maintenance Charges for 5 th year after completion of warranty period of SITC part |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail