| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : |
| 2 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 5 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 6 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 7 | Edges of slabs and breaks in floors and walls |
| 8 | Under 20 cm wide |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). |
| 12 | Providingof bolts including nuts and washers complete. |
| 13 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 metres lead |
| 14 | With cement mortar 1:4 (1cement: 4 coarse sand). |
| 15 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 16 | Carriage of 15 M highRoof top tower material, antenna, ladderguide rail etc. including loading, unloading from BSNLstorenear collectorate to near by location at 2nd floor terrace inRCVyascolony, upto 1.50 kmlead approx weight 2.00 Metric tonneas directed by engineer incharge. |
| 17 | Placing and embedding in position required number of foundation anchor bolts, nuts and template in each leg of RCC Column and beam of 3 legged tower as per the structural drawing and agreement maintaining the levelling and verticality centre to entredistances accurately all complete as directed by Engineer In Charge. |
| 18 | Erection of Roof Top Tower upto 15M height at desired location and floor as decided by competent authority. This includes all labour and works involed in erection of tower, including shorting numbering etc. All complete as per direction of Engineer in Charge. |
| 19 | Making and supplying at site anchor bolts for fixing baseof tower manufactured from 25 mm dia mild steel bars of required length andthreaded at top upto 150 mm length and welded with lugs made from 100mmx100mmx 10 mm thick mild steel plate at 50 mm from bottom including suitable hexagonal nuts 2 nos (Nuts & Checknuts)and MS springwasher etc all complete as per drected by the Engineer- in -charge. |