| 1 | Fazilka CSM |
| 2 | Dismantling of M.S. Pipe, 1/2\" to 12\" dia |
| 3 | Erection of M.S. Pipe 1/2\" to 12\" dia |
| 4 | Dismantling of M.S. Pipe Line above 12\" dia upto 20\" dia |
| 5 | Fabrication of M.S. Pipe Line above 12\" diaupto 20\" dia from M.S. Plate (8/10mm thk.) |
| 6 | Erection of M.S. Pipe Line above 12\" dia upto 20\" dia |
| 7 | Fabrication of S.S. Pipe Line 4\" to 24\" dia from S.S.plate |
| 8 | Dismantling of S.S. Pipe Line 4\"to 24\" dia |
| 9 | Erection of S.S. Pipe Line 4\" to 24\" dia |
| 10 | Dismantling of Nipple 1\" to 12\" dia |
| 11 | Fabrication of Nipple 1\" to 12\" dia |
| 12 | Erection of Nipple 1\" to 12\" dia |
| 13 | Dismantling of Nipple above 12\" dia |
| 14 | Fabrication of Nipple above 12\" dia (from 8/10mm thk plate) |
| 15 | Erection of Nipple above 12\" dia |
| 16 | Dismantling of Bend 1\" to 12\" dia |
| 17 | Fabrication of Bend 1\" to 12\" dia |
| 18 | Erection of Bend 1\" to 12\" dia |
| 19 | Dismantling, Fabrication and Erection of Bend above 12\" dia |
| 20 | Dismantling of Reducer/Tee 1\" to 12\" dia |
| 21 | Fabrication and erection of Reducer/Tee1\" to 12\" dia |
| 22 | Dismantling of Reducer/Teeabove 12\" dia |
| 23 | Fabrication and erection of Reducer/Teeabove 12\" dia |
| 24 | Replacement of partition plate includinggrooved bar of Top side of Juice Heater |
| 25 | Replacement of partition plate includinggrooved bar of Bottom side of Juice Heater |
| 26 | Repair ofValve 1\" to 12\" dia |
| 27 | Erection of Valve 1\" to 12\" dia |
| 28 | Dismantling of Valve 1\" to 12\" dia |
| 29 | Repair ofValve above12\" dia |
| 30 | Dismantling of Valve above 12\" dia |
| 31 | Erection of Valve above 12\" dia |
| 32 | DismantlingFabrication and ErectionofPlatform including structure |
| 33 | Fabrication of Vapour/ExhaustPipe24 \" to 44\" dia (8/10mm thk plate) |
| 34 | Dismantlingof Vapour/Exhaust Pipe24\" to 44\" dia |
| 35 | Erection of Vapour/Exhaust Pipe24\" to 44\" dia |
| 36 | Fabrication of Vapour Pipe Bend 24\" to 44\" dia (8/10mm thk plate) |
| 37 | Dismantling and Erection of Vapour Pipe Bend 24\" to 44\" dia |
| 38 | Dismantling, Fabrication and Erection of Rectangular/Cylindrical tanks |
| 39 | Replacement of Flat/runner, side plates/MS railing/square bar etc. for chains of Mill House. |
| 40 | Dismantling & erection of IBR pipeline1/2\" to 6” Dia |
| 41 | Dismantling & erection of IBR bends/reducers/nipple/Tee Upto 6” dia |
| 42 | Dismantling & erection of IBR pipelineabove 6” Dia |
| 43 | Dismantling & erection of IBR bends/reducers/nipple above 6” dia |
| 44 | Dismantling and erectionof IBR valve upto 6” dia |
| 45 | Replacement of old brass/SS tubes of with new SS tubes of Quad body/ Vapour cellby Dismantling , fitting and expansion of tubesHydraulic testing after replacement of tubes |
| 46 | Replacement of SS Tube of Juice Heaters/ VLJH by Dismantling , fitting and expansion of tubes |
| 47 | Replacement of Brass/SS Tubeof any Pan by Dismantling , fitting and expansion of tubes |
| 48 | MS plate patch work upto 1m2 area |
| 49 | MS platepatch work above1m2 area |
| 50 | Dismantling of structure in the mills |
| 51 | Fabrication and Erection of structure in the mills |