}

Annual Rate Contract For Extraction, Loading, Unloading And Lowering Of Submersible Pumpset, Vt Pumpset, Pumpset Of Dug Wells With Allied Works- 1 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 0 T, urban-Jammu And Kashmir

Public Health Engineering Department-PHED has published Annual Rate Contract For Extraction, Loading, Unloading And Lowering Of Submersible Pumpset, Vt Pumpset, Pumpset Of Dug Wells With Allied Works- 1 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 0 T. Submission Date for this Tender is 23-05-2022. Bolts Tenders in urban Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

32149186
Annual Rate Contract For Extraction, Loading, Unloading And Lowering Of Submersible Pumpset, Vt Pumpset, Pumpset Of Dug Wells With Allied Works- 1 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 0 T
Open Tender
Indian
Jammu And Kashmir
urban
23-05-2022

Tender Details

Annual Rate Contract For Extraction, Loading, Unloading And Lowering Of Submersible Pumpset, Vt Pumpset, Pumpset Of Dug Wells With Allied Works- 1 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 0 To 10, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 2 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 11 To 20, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 3 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 21 To 30, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 4 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 31 To 40, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 5 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 41 And Above, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 6 For 5 Inch Dia To 8 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 0 To 10, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 7 For 5 Inch Dia To 8 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 11 To 20, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 8 For 5 Inch Dia To 8 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 21 To 30, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 9 For 5 Inch Dia To 8 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 31 To 40, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 10 For 5 Inch Dia To 8 Inch Diacolumn Pipes When Number Of Column Pipes Lies In The Range Of 41 And Above, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell, Stacking Of Column Pipes And Submersible Cable Properly 11 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes, Loading Of Submersible Pump Set In Mechanical Transport, Carriage To The Workshop And Unloading. In The Range Of 0 To 10 Km 12 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes, Loading Of Submersible Pump Set In Mechanical Transport, Carriage To The Workshop And Unloading. In The Range Of 11 Kilometer & Above 13 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes, Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site.In The Range Of 0 To 10 Kilometer 14 For 2.5 Inch Dia To 4 Inch Diacolumn Pipes, Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site.In The Range Of 11 Kilometer & Above 15 For2.5 Inch Diato 4 Inch Diacolumn Pipes, When Number Of Column Pipes Lies In The Range Of 0 To 10, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel 16 For2.5 Inch Diato 4 Inch Diacolumn Pipes, When Number Of Column Pipes Lies In The Range Of 11 To 20, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 17 For2.5 Inch Diato 4 Inch Diacolumn Pipes, When Number Of Column Pipes Lies In The Range Of 21 To 30, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 18 For2.5 Inch Diato 4 Inch Diacolumn Pipes, When Number Of Column Pipes Lies In The Range Of 31 To 40, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 19 For2.5 Inch Diato 4 Inch Diacolumn Pipes, When Number Of Column Pipes Lies In The Range Of 41 And Above, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 20 For5 Inch Diato 8 Inch Dia Column Pipes, When Number Of Column Pipes Lies In The Range Of 0 To 10, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 21 For5 Inch Diato 8 Inch Dia Column Pipes, When Number Of Column Pipes Lies In The Range Of 11 To 20, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 22 For5 Inch Diato 8 Inch Dia Column Pipes, When Number Of Column Pipes Lies In The Range Of 21 To 30, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 23 For5 Inch Diato 8 Inch Dia Column Pipes, When Number Of Column Pipes Lies In The Range Of 31 To 40, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 24 For5 Inch Diato 8 Inch Dia Column Pipes, When Number Of Column Pipes Lies In The Range Of 40 And Above, Making Of Cable Connection Of Motor With Submersible Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Submersible Pump Set Complete Along With Column Pipes And Submersible Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel. 25 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Disconnecting Of Power Connections From Starter Panel, Dismounting Of Motor Using Special Tools And Tackles, Skilled Man Power 26 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Disengaging From Delivery Bend And Extraction Of Vt Pump Set Complete Including Liner Assembly And Pump Assembly Using Special Tool And Tackles, Skilled Manpower, Stacking Of Pump Parts, Cables. 27 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Loading Of Complete Pump Set / Motorinto Mechanical Transport And Carriage To Workshop And Unloading Thereof. 28 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Loading Of Complete Pumpset / Motorinto Mechanical Transport And Carriage From Workshop And Unloading At Site. 29 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Lowering Of Vt Pump Set Complete Including Linear Assembly With Proper Alignment, Fitting Of Discharge Head, Delivery Line, Packing Box, Ratchet Assembly, Coupling Pulley. 30 For Vt Pump 1.80 Lac. Gph X 34.5 Mtr. Mounting Ofmotor Using Special Tools, Tackles And Skilled Labour. Coupling Ofmotor. Making Of Connections With Starter Panel. 31 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Disconnecting Of Power Connections From Starter Panel, Dismounting Of Motor Using Special Tools And Tackles, Skilled Man Power 32 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Disengaging From Delivery Bend And Extraction Of Vt Pump Set Complete Including Liner Assembly And Pump Assembly Using Special Tool And Tackles, Skilled Manpower, Stacking Of Pump Parts, Cables. 33 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Loading Of Complete Pump Set / Motorinto Mechanical Transport And Carriage To Workshop And Unloading Thereof. 34 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Loading Of Complete Pumpset / Motorinto Mechanical Transport And Carriage From Workshop And Unloading At Site. 35 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Lowering Of Vt Pump Set Complete Including Linear Assembly With Proper Alignment, Fitting Of Discharge Head, Delivery Line, Packing Box, Ratchet Assembly, Coupling Pulley. 36 For Vt Pump 1.50 Lac. Gph X 45 Mtr. Mounting Ofmotor Using Special Tools, Tackles And Skilled Labour. Coupling Ofmotor. Making Of Connections With Starter Panel. . 37 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Disconnecting Of Power Connections From Starter Panel, Dismounting Of Motor Using Special Tools And Tackles, Skilled Man Power 38 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Disengaging From Delivery Bend And Extraction Of Vt Pump Set Complete Including Liner Assembly And Pump Assembly Using Special Tool And Tackles, Skilled Manpower, Stacking Of Pump Parts, Cables. 39 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Loading Of Complete Pump Set / Motorinto Mechanical Transport And Carriage To Workshop And Unloading Thereof. 40 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Loading Of Complete Pumpset / Motorinto Mechanical Transport And Carriage From Workshop And Unloading At Site. 41 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Lowering Of Vt Pump Set Complete Including Linear Assembly With Proper Alignment, Fitting Of Discharge Head, Delivery Line, Packing Box, Ratchet Assembly, Coupling Pulley. 42 For Vt Pump 0.55 Lac. Gph X 30 Mtr. Mounting Ofmotor Using Special Tools, Tackles And Skilled Labour. Coupling Ofmotor. Making Of Connections With Starter Panel. . 43 Fordug Wells, Disconnecting Of Power Connections From Starter Panel, Disengaging From Delivery Bend And Extracting Outpump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block. Stacking Of Column Pipes And Cable Properly. 44 Fordug Wells, Loading Of Pump Set In Mechanical Transport, Carriage To The Workshop And Unloading. In The Range Of 0 To 10 Kilometer 45 Fordug Wells, Loading Of Pump Set In Mechanical Transport, Carriage To The Workshop And Unloading. In The Range Of 11 Kilometers And Above. 46 For Dugwells, Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site In The Range Of 0 To 10 Kilometers. 47 For Dugwells, Loading In Mechanical Transport And Carriage Back To Site Of Work And Unloading At Site In The Range Of 11 Kilometers And Above. 48 For Dugwells, Making Of Cable Connection Of Motor With Cable After Dressing Cable Ends Properly. Making Of Each Joint Water Proof. Lowering Of Pump Set Complete Along With Column Pipes And Cable With Providing & Fitting Of Jointing Material And Nuts And Bolts. Making Of Connections To The Starter Panel.

Key Value

Document Fees
INR 1000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Annual rate contract for Extraction, Loading, Unloading and Lowering of Submersible Pumpset, VT Pumpset, Pumpset of Dug wells with allied works
Sl. No. Item Description
1For 2.5 inch dia to 4 inch diacolumn pipes when number of column pipes lies in the range of 0 to 10, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
2For 2.5 inch dia to 4 inch diacolumn pipes when number of column pipes lies in the range of 11 to 20, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
3For 2.5 inch dia to 4 inch diacolumn pipes when number of column pipes lies in the range of 21 to 30, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
4For 2.5 inch dia to 4 inch diacolumn pipes when number of column pipes lies in the range of 31 to 40, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
5For 2.5 inch dia to 4 inch diacolumn pipes when number of column pipes lies in the range of 41 and above, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
6For 5 inch dia to 8 inch diacolumn pipes when number of column pipes lies in the range of 0 to 10, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
7For 5 inch dia to 8 inch diacolumn pipes when number of column pipes lies in the range of 11 to 20, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
8For 5 inch dia to 8 inch diacolumn pipes when number of column pipes lies in the range of 21 to 30, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
9For 5 inch dia to 8 inch diacolumn pipes when number of column pipes lies in the range of 31 to 40, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
10For 5 inch dia to 8 inch diacolumn pipes when number of column pipes lies in the range of 41 and above, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes by hoisting chain pulley block at Tubewell, stacking of column pipes and Submersible cable properly
11For 2.5 inch dia to 4 inch diacolumn pipes, Loading of Submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 0 to 10 km
12For 2.5 inch dia to 4 inch diacolumn pipes, Loading of Submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 11 Kilometer & above
13For 2.5 inch dia to 4 inch diacolumn pipes, Loading in Mechanical transport and carriage back to site of work and unloading at site.in the range of 0 to 10 kilometer
14For 2.5 inch dia to 4 inch diacolumn pipes, Loading in Mechanical transport and carriage back to site of work and unloading at site.in the range of 11 Kilometer & above
15For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 0 to 10, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel
16For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 11 to 20, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
17For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 21 to 30, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
18For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 31 to 40, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
19For2.5 inch diato 4 inch diacolumn pipes, when number of column pipes lies in the range of 41 and above, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
20For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 0 to 10, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
21For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 11 to 20, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
22For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 21 to 30, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
23For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 31 to 40, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
24For5 inch diato 8 inch dia column pipes, when number of column pipes lies in the range of 40 and above, Making of cable connection of motor with Submersible cable after dressing cable ends properly. Making of each joint water proof. Lowering of Submersible Pump Set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
25For VT Pump 1.80 lac. GPH X 34.5 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power
26For VT Pump 1.80 lac. GPH X 34.5 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts,cables.
27For VT Pump 1.80 lac. GPH X 34.5 Mtr. Loading of complete pump set/motorinto Mechanical Transport and carriage to workshop and unloading thereof.
28For VT Pump 1.80 lac. GPH X 34.5 Mtr. Loading of complete pumpset/ motorinto Mechanical Transport and carriage from workshop and unloading at site.
29For VT Pump 1.80 lac. GPH X 34.5 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley.
30For VT Pump 1.80 lac. GPH X 34.5 Mtr. Mounting ofmotor using special tools,tackles and skilled labour. Coupling ofmotor. Making of connections with starter panel.
31For VT Pump 1.50 lac. GPH X 45 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power
32For VT Pump 1.50 lac. GPH X 45 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts,cables.
33For VT Pump 1.50 lac. GPH X 45 Mtr. Loading of complete pump set/motorinto Mechanical Transport and carriage to workshop and unloading thereof.
34For VT Pump 1.50 lac. GPH X 45 Mtr. Loading of complete pumpset/ motorinto Mechanical Transport and carriage from workshop and unloading at site.
35For VT Pump 1.50 lac. GPH X 45 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley.
36For VT Pump 1.50 lac. GPH X 45 Mtr. Mounting ofmotor using special tools,tackles and skilled labour. Coupling ofmotor. Making of connections with starter panel. .
37For VT Pump 0.55 lac. GPH X 30 Mtr. Disconnecting of Power connections from starter panel, dismounting of motor using special tools and tackles, skilled man power
38For VT Pump 0.55 lac. GPH X 30 Mtr. Disengaging from delivery bend and extraction of VT Pump Set complete including liner assembly and pump assembly using special tool and tackles, skilled manpower, stacking of pump parts,cables.
39For VT Pump 0.55 lac. GPH X 30 Mtr. Loading of complete pump set/motorinto Mechanical Transport and carriage to workshop and unloading thereof.
40For VT Pump 0.55 lac. GPH X 30 Mtr. Loading of complete pumpset/ motorinto Mechanical Transport and carriage from workshop and unloading at site.
41For VT Pump 0.55 lac. GPH X 30 Mtr. Lowering of VT Pump Set complete including linear assembly with proper alignment, fitting of discharge head, delivery line, packing box, ratchet assembly, coupling pulley.
42For VT Pump 0.55 lac. GPH X 30 Mtr. Mounting ofmotor using special tools,tackles and skilled labour. Coupling ofmotor. Making of connections with starter panel. .
43ForDug wells, Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting outPump Set complete along with column pipes by hoisting chain pulley block. Stacking of column pipes and cable properly.
44ForDug wells, Loading of Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 0 to 10 kilometer
45ForDug wells, Loading of Pump Set in Mechanical transport, carriage to the Workshop and unloading. In the range of 11 kilometers and above.
46For Dugwells, Loading in Mechanical transport and carriage back to site of work and unloading at site in the range of 0 to 10 kilometers.
47For Dugwells, Loading in Mechanical transport and carriage back to site of work and unloading at site in the range of 11 kilometers and above.
48For Dugwells, Making of cable connection of motor with cable after dressing cable ends properly. Making of each joint water proof. Lowering of Pump Set complete along with column pipes and cable with providing & fitting of jointing material and nuts and bolts. Making of connections to the starter panel.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail