| 1 | ReplacementofG C IsheetbyTATAbluescopeofEmployeesRecreationclub,Cycleshed ofAdministrativeBuilding, StoreofErectors\"HostelandPotteruMaterialStorewithcivilrepairworks atUKHEP, Bariniput. |
| 2 | Earth work in hard soil or gravely soil within 50m initial lead and 1.5m initila lift includig rough dressing and breaking clods to maximum 5 to 7 cm and laying in layers not exceeding 0.30 m in depth and including cost of alllabour, T&P, Sundries, labour cess etc complete and as per the direction of the EIC. |
| 3 | Filling in foundation and plinth with sand, well watered and rammed including cost of sand,alllabour, T & P, sundries,conveyance,royalties,labour cess,lead, lift , deliftetc complete and as per the direction of the EIC. |
| 4 | Cement concrete (1:3:6)with 40 mm size HGCB metalincluding cost conveyance,royalities, all labour T&P ,sundries & labour cess and curing etc completeand as per the direction of the EIC |
| 5 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost of materialcomplete including all labour,T& P,sundries,labour cess etc complete. |
| 6 | RCC foundation, plinth bend, footing bases of coloumn, mass concrete and precast RCC slabs. |
| 7 | RCC beams, coloumns,girders and bressmers etc. |
| 8 | Supplying, fitting and placing uncoated HYSD bar TATA TISCON Fe-500D/ SAIL ISI bar reinforcement complete as per drawing and technical specificationincluding cost, conveyance, all labor, T&P, sundries, labor cess etc complete and as per the direction of the EIC. |
| 9 | RCC work of M-20 grade with hard granite crusher broken chips of 20 mm size and down graded of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and including cost, conveyance, royality, T&P, sundries, all labour, labour cess and curing etc for four weeks etc complete and as per the direction of the EIC. |
| 10 | Dismantling brick or stone masonry in lime or cement mortar under 3.00mtrheight including stackingtheusefull materials for reuse and removing the debries within 50 mtr initial lead and 1.50 mtr initial lift including the all cost of labour,T&P,sundries & labour cess etc complete & as perthedirectionoftheEIC. |
| 11 | Dismantling GCI or AC sheet roofing after carefully removing the bolts and nuts including stacking of useful materials for reuse & removing the debris within 50m lead including all labour, T&P, sundries & labour cess etc complete and returning the dismnatled materials to the section stores etccompleteandand as per the direction of the EIC. |
| 12 | Dismantling of roof timber of GCI sheet roof including stacking the useful materials for reuse & removing the debris within 50M lead including all labour, T&P, sundries and labour cess etc completeandasperthedirectionoftheEIC. |
| 13 | Providing, fitting & fixing of mild steel hollow section of cross section 50mmx50mmx2.5mm as batten, welded with mild steel flat of cross section 50mmx6mm across the hollow section at 8 places, welding of mild steel hollow section with mild steel hollow esction at 3 places and fixing of the same over the existing wooden truss including making 4 nos of 6 mm dia holes in mild steel flat and fixing the same by using 40mmx6mm mild steel screw including cost of all materials, labour, T&P, sundries, scaffolding and labour cess etccompleteandasperthedirectionoftheEIC. |
| 14 | Providing and fixing0.47 mmTATA blue scopeDURASHINE sheetin roof drilling holes in wind ties including fixing of ridges, valleys, including cost of DURASHINE TATA Blue scope sheet, J or L hook with bitumen washer, limpet washer etc including cost of all materials, cost of labour, T&P, sundries & labour cess completeandasperthedirectionoftheEIC. |
| 15 | Brick work with Fly ash bricks (23x11x8) cm size having crushing strength not less than 75 kg/sq.cm with dimensional tolerance ±2 % in cement mortar (1:6 ) in superstructure including all labour, T&P, Sundries, Labour cess, cost, conveyance, royalty and curring etc complete in ground or firast floor and as per the direction of the EIC. |
| 16 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing within 50mtr lead including all labour, T&P, sundries, lead, lift, delift and labour cess etc completeandasperthedirectionoftheEIC. |
| 17 | 16 mm thick cement plaster in cement mortar (1:6) over brick or stonemasonry including cost,conveyance,royalty,all labour, T & P,sundries,labour cess and curing etc complete in ground floor and first floor and asperthedirectionoftheEIC. |
| 18 | 12mm thick cement plaster in cement mortar (1:4) over brick work including all labour, T&P, sundries & labour cess & curring etc complete in ground florr and first floor etccompleteandasperthedirectionoftheEIC. |
| 19 | Dismantling and removing 2.5cm thick artificial stone flooring, stacking the useful materials for reuse and removing the debries witin 50mtr lead including all labour, T & P, sundries,labourcess etc complete and as per the direction of the EIC. |
| 20 | Cement concrete (1:2:4) for PCC works with 12mm size HGCB chipsincluding cost conveyance,royalities, all labour T&P ,sundries & labour cess and curing etc complete and as per the direction of the EIC. |
| 21 | Priming one coat with red oxide primer including cost of primer ,brush,all labour,T & P ,sundries,labour cessetc complete in ground floor and first floorandasperthedirectionoftheEIC. |
| 22 | Painting two coats with any approved enamel paintof any approved shadeof Asian/ Berger/Salimar make including cost of paint,putty, scaffolding, labour,T&P,sundries,brush and labour cess etc completeandasperthedirectionoftheEIC. |
| 23 | Cutting 70mmx70mm groove in brick wall for inserting and fixing of durashine sheet and making good the damagestothewallas per site requirement including all materials, labour, T&P, sundries, labour cess and curing etccomplete andasperthe directionoftheEIC. |
| 24 | Welding of 50x50x6 mm size MS angle with 50mmx50mm x6mm MS angle including all costof labour, T&P, Sundreis and labour cess etc completeandasperthe directionoftheEIC. |
| 25 | Construction of cycleshedatPower House Campus, UKHEP , Bariniput. |
| 26 | Close deep chipping and cleaningtoRCC surfacefor receivingcement plaster or cementconcrete including all labour, T & P, sundries and labour cess etc completeandasperthedirectionoftheEIC. |
| 27 | Cutting cement concretebase for making pits of size 0.30 m x 0.30 m x0.10 mtrincluding all labour, T & P, sundries and labour cess etc completeandasperthedirectionoftheEIC. |
| 28 | Drilling holes 16 mm dia x 250 mm depth in granite rock / mass concrete baseand inserting 16 mm dia tata RTS rod into the hole by hammering including all labour, T & P, sundries and labour cess etc completeandasperthedirectionoftheEIC. |
| 29 | Providing ,fabrication and welding ofofdifferent types ofjindal star/ Tata G I pipe \"C\"Class& 10 mm dia mild steel rodfor pipe to pipe locking & welding purpose including cost, conveyance,fabrication charges,welding charges, all labour, T & P, sundries & labour cess etc completeat siteandas perthedirectionof theEIC. |
| 30 | 80 mm diaJindal star / TataGI pipe \"C\" Class. |
| 31 | 50 mm dia Jindal star / Tata GI pipe \"C\" Class. |
| 32 | Hoisting joists and trusses in position including all labour, T&P, sundreis and labour cess etc completeandasperdirectionoftheEIC. |
| 33 | Cement concrete (1:2:4) for PCC works with 12mm size HGCB chipsincluding cost, conveyance,royalities, all labour, T&P, sundries & labour cess and curing etc complete andasperthedirectionoftheEIC. |
| 34 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost of materialcomplete including all labour,T& P,sundries,labour cess etc complete. |
| 35 | Brick work with Fly ash bricks (23cmx11cmx8cm)in size having crushing strength not less than 75 kg/sq.cm with dimensional tolerance ±2 % in cement mortar (1:6 ) in superstructure including all labour, T&P, sundries, labour cess, cost, conveyance, royalty and curing etc complete. |
| 36 | 12 mm thick cement plaster in cement mortar (1:4) over brick or stonemasonry including cost,conveyance,royalty,all labour, T & P,sundries,labour cess and curing etc complete in ground floor and first floor andasperthedirectionoftheEIC. |
| 37 | Providing & fixing 0.47 mm thick TATAblue scope DURASHINEsheet in roofdrilling holes in wind ties including fixing of ridges,valleys including cost ofTATA blue scope sheet, J or Lhooks with bitumen washer,limpet washerincluding cost of all materials , labour,T & P, sundries & labour cess etc completeandasperthedirectionoftheEIC. |
| 38 | Distempering two coats to walls with distemper of approve shade of Asian /Berger /Shalimar make on newwork to give an even shade including cost of distemper, brush,putty, all labour,T & P,sundries and labour cess etc complete in ground floorandasperthedirectionoftheEIC. |