Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Construction Of Electric Line For Providing New Connection Work- 1 Cartage Of Following Material From Store Center To Any Other Place To The Respective Site Of Work Though The Kachcha Pakka Road Including The Work Of Dragging Ete. And Also Including The . Submission Date for this Tender is 13-05-2022. Bolts Tenders in mahoba Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Cartage of following material from store center to any other place to the respective site of work though the kachcha pakka road including the work of dragging ete. And also including the of labour, T&P Carrier etc. required for proper completion of work. |
2 | 8.5 MTR long PCC Pole |
3 | 11 MTR long STP Pole |
4 | 13 MTR long STP Pole |
5 | CT PT Pole Unit |
6 | XLPE Cable 3x70 sqmm |
7 | XLPE Cable 3x120 sqmm |
8 | 63 KVA TRANSFORMER |
9 | 25 KVA TRANSFORMER |
10 | Cartage of line material Viz. Weasal conductor. G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material from store center form any other place to the respective site of work through the kachcha pakka road including the work of its Loading & unloading at the respective ends, including the work dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work. |
11 | Erection ofFour pole including complete. H.T/L.T Fitting as per RESSPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
12 | 13 MTR long STPFour Pole Structure |
13 | Erection ofThree pole including complete. H.T/L.T Fitting as per RESSPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
14 | 13 MTR long STPThree Pole Structure |
15 | Erection ofDouble pole including complete. H.T/L.T Fitting as per RESSPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
16 | 8.5 MTR long PCCDouble Pole Structure |
17 | 11 MTR long STPDouble Pole Structure |
18 | 13 MTR long STPDouble Pole Structure |
19 | Erection ofSingle pole including complete. H.T/L.T Fitting as per RESSPO manual and as per direction of Engineer Incharge includingthe cost of labour, T&P and carrier etc. required for proper completion of work. |
20 | 8.5 MTR long PCCSigle Pole Structure |
21 | 11 MTR long STP SiglePole Structure |
22 | 13 MTR long STP SiglePole Structure |
23 | Grouting ofPolesas per RESSPO manual and as per direction of Engineer Incharge including Stone Pad the cost of labour, T&P and carrier etc. required for proper completion of work. |
24 | 8.5 MTR long PCC Pole |
25 | 11 MTR long STPPole |
26 | 13 MTR long STPPole |
27 | Erectionof stay set including the work of nozelling etc. as perRESSPO manual and also including the cost grouting material, labour, T&P etc required for proper completion of work. |
28 | Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T&P etc required for proper completion of work. |
29 | Erection of Trnasformer on the pole structure in proper alignmentas per RESSPO Manual and as per direction of supervising engineer. It includes the cost of labour T&P carreer etc required for proper completion of work. |
30 | 63 KVA TRANSFORMER |
31 | 25 KVA TRANSFORMER |
32 | Erection & Fixing of 11 KV TPMO |
33 | Erection & Fixing of 11 KV Fuse |
34 | Laying sagging stringing and binding and jumpering etc of ACSR DOG conductor/ACSR Weasel Conductor/Cable on the erected pole as per RESSPO Manual and as per direction of supervising engineer. It includes the cost of labour T&P carreer etc required for proper completion of work. |
35 | ACSR DOG Conductor |
36 | ACSR Weasel Conductor |
37 | 3x70 mmsq 11 KV XLPE Cable |
38 | 3x120 mmsq 11 KV XLPE Cable |
39 | Cable Laying Charges along with cost of brics and sand for Under Graunding Cable |
40 | Road Restoration Charges for Pakka Road crossing |
41 | Road Restoration Charges for footh path side |
42 | Fabriction of hole work X-Arm, Channel, Angle, Required Accessories. |
43 | Fixing of Danger board plate onpole strucure as per RESSPO schedule |
44 | Fixing of Barbed wire boardas per RESSPO schedule |
45 | Filling of cable jointing kit indoor/Outdoor |
46 | Filling of Straight Through jointing kit |
47 | Fixing of Cross Bracing Angle with four no Clamp for Double pole/four pole/three pole/Single Pole strucure as per RESSPO schedule |
48 | Fixing of 11 kv line guarding for road crossing. |
49 | Erection/installation of CT PT Pole unit.on double pole structure. |
50 | Installation and Erection of Pilfer on metering room including cartage from ESC Mahoba to work site. |
51 | Red Oxide /Aluminium Painting of STP Poleas per Direction of site incharge. |
52 | Supply of followingDe-Centralized Material Provided by the contractor. |
53 | Supply of difference size MS nut and bolt with washer |
54 | Supply of Danger Board with Clamp & N/B |
55 | Supply of F Clamp for STP/PCC |
56 | Supply of Guarding Angle Clamp PCC/STP |
57 | Supply of Cross Arm Holding Clamp PCC/STP |
58 | Supply of E-Bracket PCC/STP |
59 | Supply of Stay Clamp with Stay Insulator |
60 | Supply of Stone Pad |
61 | Supply of Barbed Wire |
62 | Supply of G.I Pipe 6"" Dia Mtr. |
63 | Channel Clamp PCC/STP |
64 | PG Clamp |
65 | Suppy of oxide Paint |
66 | Supply of 11 Kv cable 3x70 XLPE jointing kit Heatsink Type indoor(As per ISS) |
67 | Supply of 11 Kv cable 3x70 XLPE jointing kit Heatsink Type outdoor(As per ISS) |
68 | Supply of 11 Kv cable 3x120 XLPE jointing kit Heatsink Type outdoor(As per ISS) |
69 | Supply of 11 KV Straight Through jointing kit |
70 | Supply of 90 LBS Rail Pipe |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail