|
| 1 | Planning, Designing, and Construction on EPC BasisRCC framed structure building TEACHING HOSPITAL (G+5) AND AUTOPSY (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :-Plinth Area shall be measured for the actual constructed. |
| 2 | Planning, Designing, and Construction on EPC BasisRCC framed structure building ACADEMIC BLOCK (G+5) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect.Note :-Plinth Area shall be measured for the actual constructed. |
| 3 | Planning, Designing, and Construction on EPC BasisRCC framed structure building UG BOYS HOSTEL (G+5) ,UG GIRLS HOSTEL (G+5) , INTERN BOYS HOSTEL (G+2) ,INTERN GIRLS HOSTEL (G+2) ,NURSE HOSTEL (G+5), RESIDENT HOSTEL (G+5) , CENTRAL MESS (G) AND GAS MANIFOLD (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :-Plinth Area shall be measured for the actual constructed.Note :-Plinth Area shall be measured for the actual constructed. |
| 4 | Planning, Designing, and Construction on EPC BasisRCC framed structure building TYPE-I (G+3), TYPE-II (G+3), TYPE-IV (G+3) & DIRECTOR/PRINCIPAL+MATRON +MEDICAL SUPRETENDENT(G+1),with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :-Plinth Area shall be measured for the actual constructed. |
| 5 | Planning, Designing, and Construction on EPC BasisRCC framed structure building PRIVATE WARD (G+2) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :-Plinth Area shall be measured for the actual constructed. |
| 6 | Planning, Designing and construction of Civil External development works (B (i-xi) , Under ground Sump , Horticulture & Landscape , Earth Cutting/Filling Work , Boundary Wall , gate and guard room, Solar water heating system, , hyderopneumatic water supply system , sewerage+effluent treatment plant ,water cooler , water treatment plant with RO , Tubewell , sewage & drainage pump and ESS & Plant Roomapproval of the same by the Engineer- in-Charge |
| 7 | Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , IP based EPABX System, Nursing call system, Audio Visual System, LED Street light , CCTV system For External Surveillance , Solar photo voltaic power generation system,Emergency Light and Illuminated digital signages and Boom barrier with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.. |
| 8 | Planning, Designing, and Construction on EPC Basis of Medical Gas Pipeline System with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.(Matrix to be Followed as provided with MGPS Technical Specification) |
| 9 | Planning, Designing, and Construction on EPC Basis of Modular Operation Theater With stainless steel technology and Integration with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. (Matrix to be Followed as provided with MOT Technical Specification) |
| 10 | Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months.(i). MGPS |
| 11 | Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months.(i). MOT |
| 12 | Comprehensive Operation & Maintenance Contract (CMC) Charges post 5 years comprehensive warranty for followings services:(i). MGPS(ii). MOT Comprehensive Operation & Maintenance Contract CMC charges to be quoted for each services seperately.For MGPS6th Year |
| 13 | 7th Year |
| 14 | 8th Year |
| 15 | 9th Year |
| 16 | 10th Year |
| 17 | For MOT6th Year |
| 18 | 7th Year |
| 19 | 8th Year |
| 20 | 9th Year |
| 21 | 10th Year |
| 22 | Operation and Maintenance of ServicesHVAC WORK:Operation & maintenance (routine & preventive ) and breakdown maintenanceofhigh side & low side of the Airconditioning plant comprising of all the machinery, equipment installed in the A.C. Plant room.Operation& MaintenanceFor 1st year (Concurrently with DLP of 12 Months) |
| 23 | For 2ndyear (After One Year Of DLP) |
| 24 | For 3rdyear (After Two Year Of DLP) |
| 25 | For 4thyear (After Two Year Of DLP) |
| 26 | For 5thyear (After Two Year Of DLP) |
| 27 | STP,WTP,ETP , FIRE PUMP: Operation & comprehensive maintenanceSTP,WTP, ETP , FIRE PUMP unitsafter three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect asper direction of Engineer in charge.Operation& MaintenanceFor 1st year (Concurrently with DLP of 12 Months) |
| 28 | For 2ndyear (After One Year Of DLP) |
| 29 | For 3rdyear (After Two Year Of DLP) |
| 30 | For 4thyear (After Two Year Of DLP) |
| 31 | For 5thyear (After Two Year Of DLP) |
| 32 | Lifts:Operation & comprehensive maintenance LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect asper direction of Engineer in charge.Operation& MaintenanceFor 1st year (Concurrently with DLP of 12 Months) |
| 33 | For 2ndyear (After One Year Of DLP) |
| 34 | For 3rdyear (After Two Year Of DLP) |
| 35 | For 4thyear (After Two Year Of DLP) |
| 36 | For 5thyear (After Two Year Of DLP) |
| 37 | ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenanceESS, DG SETS unitsafterthree year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect asper direction of Engineer in charge.Operation& MaintenanceFor 1st year (Concurrently with DLP of 12 Months) |
| 38 | For 2ndyear (After One Year Of DLP) |
| 39 | For 3rdyear (After Two Year Of DLP) |
| 40 | For 4thyear (After Two Year Of DLP) |
| 41 | For 5thyear (After Two Year Of DLP) |