| 1 | Providing / fixing and errection at site of work of Hut type shelter sheds of size 20\"x40\" by way offollowing specifications / components, at sites as perbelow :- |
| 2 | a)Leveling of ground including removal of slash / slides / snow etc. and making ground even for erection at each site. |
| 3 | b)Providing / laying of concrete in 1:3:6 mix (1 cement : 3 coarse sand : 6 graded, 20mm stone aggregate nominal size), of size 2\"x2\"x3\" top leyer for errection of pipes and MS Hallow sectionincluding cost of all materials and form work complete at each site in a pit of size 2\"x2\"x2\" rest filled with available stone boulders. |
| 4 | c)Supply/Fixing and errection of Hut type frame structure with truss of M.S. Pipes / hollow section of all as per approved design and drawings including providing and fixing of nuts / bolts or by welding witch ever is required and fixing of angle iron frames as required at each site including all allied materials required. |
| 5 | d)Providing / fixing of 8mm thick polycarbonate sheets for top/ roof and sides with revitt screws as per directions of Engineer-in-charge complete at each site including cost of screws, revitts ensuring proper overlap to make it leak proof. |
| 6 | e)Supply and Placing of 12mm thick Red film face water resistant ply board sheets on Hallow section frames at required height from ground level, including placement of thermocoal and turpal and making floors even and smooth at each site.(800 sfts or above for each shed having size 3\"x6\") |
| 7 | f)Engagement of ( 3 ) No skilled labours with uniform for watch and ward/ cleaning of sheds / surroundings round the clock till complection of yatra period at each site. |
| 8 | h) P/F of J or L hooks for sides and anchoring including all carriages / head load upto site of work complete. 4\" long (48 no\"s each sheet) |
| 9 | g)Dismembering / Disassembling of Hut type shelter sheds after completion of Yatra period and stacking of all material ateach site of work complete. |
| 10 | i)Carriage of allmaterial got from dismantlinginvolved above from source to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 11 | J) Fixing & placing in position of(i.e. Tarpal, Thermocol, etc.) |
| 12 | K) Engagement of skilled black smith along with welding machine Gen set and other allied equipments required for welding purpose all complete. |
| 13 | Wavbal to Panjtarni |
| 14 | Minimum material required. |
| 15 | MS hollow sections as per approved design/ drawings inclNuts/ Bolts |
| 16 | 8mm thick polycarbonate sheets |
| 17 | 12mm thick Red film face water resistant ply board sheets |
| 18 | PVC Tarpal of approved quality.(Fresh qunanitity) |
| 19 | Thermocol 12mm thick of standard qualtiy.(Fresh qunanitity) |
| 20 | Carriage of all above materials including head load, loading / unloading etc. of following materials at above mentioned sites including dismembering &its return carriage and head load, loading and unloading etc. upto store complete. |
| 21 | \"Specifications / Conditions for 5 No. of 3-units Public Convenience\" |
| 22 | Construction / fabrication, errection in position of 5 No. of3-units Public Convenienceof size 15\".0\"x3\".0\" by way of following specifications / components at sites as shown below:- |
| 23 | a. Supply /Installation / fixing with Hallow section frame (15\".0\"x3\".0\") size of 3-units front side height 7\".0\" and 6\".0\" on back side for prefabricated toilet block made of 0.50 mm Hi-Rib sheets all along including roofing and door shutter with angle iron frame using nuts / bolts and leveling of ground complete(All necessary MS angle required to construct the PC block is to be installed at site). |
| 24 | b. Trench excavation of pit of size 4\".0\"x4\".0\"x3\".6\" for disposal system including supplying of required CGI sheets 0.50mmcovering above the pit with steel frame complete. |
| 25 | c. Supply /Installation of water storage tank 200 liters capacity and supplyingof plastic buckets / mugs for each toilet block. |
| 26 | d. Engagement of 03 No. skilled labourers with uniform for watch and ward and including supply/ spraying of Phenyl & Cleaning of toilets etc. round the clock till completion of Yatra period at each site. |
| 27 | e. Dismembering/Disassembling 5 No. of 3-units Public Convenience after completion of Yatra period and stacking of all material at each site of work with out any damage. |
| 28 | f) Supply / Fixing of chequrred plate sheets including cost of nuts / bolts at each site complete. |
| 29 | g) Supply / fixing of of Indian stainless steel WC with required nuts/ bolts complete job. |
| 30 | h. Carriage of allmaterial involved above fromto site of work and its return carriagefrom site tto store including all leads, lifts and head load by mech. / menual and ponies etc. complete. |
| 31 | Wavbal to Panjtarni |
| 32 | Minimum material required. |
| 33 | MS hollow sections as per approved design/ drawings inclNuts/ Bolts |
| 34 | Hi-Rib MS Sheets on Top/ Sides |
| 35 | SS WC Pan of required size |
| 36 | 100 mm dia PVC Pipe incl all allied fittings |
| 37 | 200 Ltr PVC Water tanks |
| 38 | Carriage of all above materials including head load, loading / unloading etc. of following materials at above mentioned sites including dismembering &its return carriage and head load, loading and unloading etc. upto store complete. |
| 39 | Engagement of ponies with ponie walla for superviory staff during yatra period for errection of sheds / p.c\"s and after dismantling of same complete. |
| 40 | Supply , including carriage / head load, loading / unloading etc. of following materials at above mentioned sites including its returen carriage and head load, loading and unloading etc. upto store of work complete. |
| 41 | Plastic Buckets 20 litre capacity. |
| 42 | Plastic Mugs 1 litre capacity. |
| 43 | Brushes(WC brushes,PVC). |
| 44 | Phenly/ Acid |