2 2022 23 Providing Sop For Lwss To Habitation Of Gp Main Bharola Balh Chalarg Kathaun Bag Ropri Daled Pihar Bhedlu Etc Of Drung And Chauntra Block 2Nd Stage In Electrical Section Sainthal Under Esd Hpsebl Chauntra , ( Supply Part ) Of 11 Kv Ht Line , Prov.Rcc Muff With Concrete Filling , Prov. Cross Arm: ( Channel Iron ( 100X50x6 Mm ) , Length ( 1070 ) Mm For Single Pole Str. , Prov.Knee Bracing Of Angle Iron ( 50X50x6mm ) , Length ( 2X750 ) Mm For Single Pole Str. , Prov.Pole Top Bracket , Prov.11 Kv Pin Insulators ( Porcelain, 12 Kv.10 Kn ) For Single Pole , Prov.Belt Set-M.S Angle Iron: 50X50x6, Length ( 1500 Mm 2 No ) For X-Bracing , Prov.X-Bracing Set-M.S Angle Iron: 50X50x6, Length ( 2700 Mmx2 No ) , Prov. X-Arm ( Horizental ) - M.S Channel Iron: 100X50x6, Length ( 2400 ) Mm X2 No ) , Prov.Disc.Insulator Sets On Dead End Structure ( Comprising 1 No Disc. ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamp Etc ) X ( 3 No.Conductors ) X ( 2 No.Sides ) , Prov.11 Kv Pin Insulators ( Porcelain, 12 Kv.10 Kn ) For Double Pole Str. , Prov.H.T.Stay Set Complete In All Respects , Prov.Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) , Prov.H.T.Earthing Set Complete , Prov.Single Continous Earth Wire ( G.I. 8 Swg ) , Prov, Eye Hook For Earth Wire , Prov.Earth Wire Clamp , Prov. Half Clamp. , Prov.Full Clamp Clamp. , Prov.Danger Plate ( 250X200x1.6 Mm ) , Prov.Nuts & Bolts Of Various Sizes ( Galvanised ) / Coated ) 16 Mm F Or More ( With Flat And Spring Washer ) , Prov.Barbed Wire , Prov.Alluminium Paint , Prov..X-Arm ( Channel Iron ( 100X50x6 Mm ) , Length 2800 Mm X 2 Nos For Top At Tapping , Prov..X-Arm ( Channel Iron ( 75X40x6 Mm ) , Length 2800 Mm X 4 Nos For Top At Tapping For G.O. Switch & D.O.Fuse , Prov.G.O.Switch Unit ( 11 Kv, 400 A, 25 Ka ) , Prov.D.O.Fuse , Transportation & Manual Carriage Of St Pole 9 Mtr.Long, Rcc Muffs, X-Arm, X-Bracing Set, X-Belt Set , Ht Stay Sets, Go Switch, Do Fuse Unit , Conductor , Gi Wire & Other Misc. Complete Fittings Etc. ( Av. Lead 1.0X0.242X46736=11310 ) , ( Erection Part ) Of 11 Kv Ht Line , Erection Of St Pole 9. 00 Mtr. Long ( Double Pole Structure ) With Rcc Muffs Including Digging Of Pit, Drilling Of Holes Inpoles, X- Bracing Set, X-Arm, Fixing Of Pin / Disc Insulators, X-Arm, X-Bracing Set, Fixing Of Barbed Wire Danger Plate, Filling Of Pit+Ramming, Painting Of Pole , Fixing Of Nuts-Bolts , Half / Full Clamps Etc. Complete In All Respects. , Erection Of St Pole 9.00 Mtr. Long ( Single Pole Structure ) With Rcc Muffs Including Digging Of Pit, Drilling Of Holes Inpoles, X-Arm, Fixing Of Pin / Disc Insulators, X-Arm, Knee Bracing Set, Top Clamp, Fixing Of Barbed Wire Danger Plate, Filling Of Pit+Ramming, Painting Of Pole , Fixing Of Nuts-Bolts , Half / Full Clamps Etc. Complete In All Respects. , Erection Of Ht Stay Sets Comprising Ofdigging Of Pit, Fixing Of Stay Rod, Filling Of Pit, Nozzeling And Tighting Etc.Complete In All Respect , Erection Of Earthingcomprising Ofdigging Of Pit, Fixing Of Gi Wire To Earthsystem , Eye Hook & Filling Of Pit Etc. Complete In All Respects. , Erection Of Go Switch Complete In All Respects . , Erection Of Do Fuse Unit Complete In All Respects . , Laying, Stringing, Sagging & Bindingof Aaac Cond.7 / 4.26 Mm Complete In All Respects , Laying, Stringing, Sagging & Bindingof Gi Wire6 Swg Complete In All Respects. , ( Supply Part ) Of Reconductoring Of 11 Kv Ht Line , Prov.Rcc Muff With Concrete Filling , Prov. Cross Arm: ( Channel Iron ( 100X50x6 Mm ) , Length ( 1070 ) Mm For Single Pole Str. , Prov.Knee Bracing Of Angle Iron ( 50X50x6mm ) , Length ( 2X750 ) Mm For Single Pole Str. , Prov.Pole Top Bracket , Prov.11 Kv Pin Insulators ( Porcelain, 12 Kv.10 Kn ) For Single Pole , Prov.Belt Set-M.S Angle Iron: 50X50x6, Length ( 1500 Mm 2 No ) For X-Bracing , Prov.X-Bracing Set-M.S Angle Iron: 50X50x6, Length ( 2125 Mmx2 No ) , Prov. X-Arm ( Horizental ) - M.S Channel Iron: 100X50x6, Length ( 2140 ) Mm X2 No ) , Prov.Disc.Insulator Sets On Dead End Structure ( Comprising 1 No Disc. ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamp Etc ) X ( 3 No.Conductors ) X ( 2 No.Sides ) , Prov.11 Kv Pin Insulators ( Porcelain, 12 Kv.10 Kn ) For Double Pole Str. , Prov.H.T.Stay Set Complete In All Respects , Prov.Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) , Prov.H.T.Earthing Set Complete , Prov, Eye Hook For Earth Wire , Prov.Earth Wire Clamp , Prov. Half Clamp. , Prov.Full Clamp Clamp. , Prov.Danger Plate ( 250X200x1.6 Mm ) , Prov.Nuts & Bolts Of Various Sizes ( Galvanised ) / Coated ) 16 Mm F Or More ( With Flat And Spring Washer ) , Prov.Barbed Wire , Prov.Alluminium Paint , Prov..Dead End Clamp Aaac 7 / 4.26 Mm , Add Transporation Chargesnew & Dismantled Material. , Manual Carriage Of New Material , Dismantled Conductor Site Of Work To Road Head, St Pole 9 Mtr.Long, Rcc Muffs, X-Arm, X-Bracing Set, X-Belt Set , Ht Stay Sets, Go Switch, Do Fuse Unit , Conductor , Gi Wire & Other Misc. Complete Fittings Etc. ( As Per Estimate ) , ( Erection Part ) Re-Conductoring Of 11 Kv H.T.Line , Erection Of St Pole 9. 00 Mtr. Long ( Double Pole Structure ) With Rcc Muffs Including Digging Of Pit, Drilling Of Holes Inpoles, X- Bracing Set, X-Arm, Fixing Of Pin / Disc Insulators, X-Arm, X-Bracing Set, Fixing Of Barbed Wire Danger Plate, Filling Of Pit+Ramming, Painting Of Pole , Fixing Of Nuts-Bolts , Half / Full Clamps Etc. Complete In All Respects. , Erection Of St Pole 9.00 Mtr. Long ( Single Pole Structure ) With Rcc Muffs Including Digging Of Pit, Drilling Of Holes Inpoles, X-Arm, Fixing Of Pin / Disc Insulators, X-Arm, Knee Bracing Set, Top Clamp, Fixing Of Barbed Wire Danger Plate, Filling Of Pit+Ramming, Painting Of Pole , Fixing Of Nuts-Bolts , Half / Full Clamps Etc. Complete In All Respects. , Erection Of Ht Stay Sets Comprising Ofdigging Of Pit, Fixing Of Stay Rod, Filling Of Pit, Nozzeling And Tighting Etc.Complete In All Respect , Erection Of Earthingcomprising Ofdigging Of Pit, Fixing Of Gi Wire To Earthsystem , Eye Hook & Filling Of Pit Etc. Complete In All Respects. , Dismantling Of Acsr 6 / 1 / 2.11 Mm Conductor.Complete In All Respects , Laying, Stringing, Sagging & Bindingof Aaac Cond.7 / 4.26 Mm Complete In All Respects , ( Supply Part ) 400 Kva Dtr , Prov.Distribution Transformer ( Ordinary ) 11 / 0.4Kv, 400 Kva , Prov.R.C.C.Muff With Concrete Filling , Prov.X-Arm ( Channel Iron ( 100X50x6 Mm ) , Length:2800 Mmx 2 Nos ) , Prov.X-Arm ( Channel Iron ( 75X40x6 Mm ) , Length:2800 Mmx 4 Nos ) For Supporting D.O.Fuse Unit & G.O.Switch , Prov.M.S Angle Iron ( 50X50x6 Mm ) , Length:2800 Mmx ( 1 Nos For Las ) , Prov.G.O. Ab Switch Unit ( 11 Kv, 400 A, 25 Ka ) Complete In All Respect , Prov.D.O.Fuse Unit Complete In All Respect , Prov.Surge Arrestor, 9 Kv Station Class ( Porcelain Type ) , Prov.Disc.Insulator Sets ( Comprising 1 No Disc. ( Porcelain, Bs, 12 Kv , 90 Kn ) Including Dead End Clamps Etc. ) , Prov.Stay Set Complete , Prov.Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) , Prov.Pipe Earthing Set , Prov.L.T.Distribution Panel Box With Acb ( 630A, 50 Ka, 4 P 1 No ) And Sfu ( 100 A, 8 No., Rewirable ) , Prov.Half Clamp ( M.S Flat 50X6 Mm ) , Prov.Nuts & Bolts Of Various Sizes ( Galvanised ) / Coated ) 16 Mm F Or More ( With Flat And Spring Washer ) , Prov.Alluminium Thimble , Prov.Alluminium Thimble , Prov.Danger Plate , Prov.Alluminium Paint , Add Transporation Charges , ( Erection Part ) 400 Kva Distribution Transformer , Digging Of Pit Forpole & Earthing ( 2 Nos For Poles & 3 Nos For Earth ) , Drilling Of Holes In X Arm , Preparation Of Plate Form Str. Member Ci, Ai, I.E X Arm And Knee Bracing Set. Erection Of Double Structure , Concreting Of Rcc Muff, Erection Ofplate Form, Erection Of X-Arm, Drop Out, Lightening Arrestors, Mccb, Switch L.T.Box, Energy Meter , Erection Of 400 Kva Transformer, Providing Earthing To G.O.Switch, Transformer Lightening Arrestor , Erection Of Two No Staysets. Erection Of Jumpers, Erection Of L.T.Cable And Fixing Of Barbed Wire And Painting. Complete In All Respect As Directed By The Engineer-In-Charge Including All Types Of Risk & Incedental At Site. , ( Supply Part ) Ct / Pt Metering Unit , Prov. Pvc Multistrand 4 Mm2 Copper Wire With 1 Inch Gi Pipe For Concealing. , Prov. Rcc Muff With Muffing , Prov. C.I. X-Arms ( 100X50x6 Mm ) Length 2800 Mm X 4 Nos. , Prov. C.I. X-Arms ( 75X40x6 Mm ) Length 2800 Mm X 4 Nos. For Supporting Of Do Fuse Unit & Go Switch. , Prov. C.I. X-Arms 460X100x50x6 Mm For Supporting Of Main Channel Of Ct / Pt Unit. ( 2 Nos. ) , Prov.M.S Angle Iron ( 50X50x5 Mm ) , Length:2800 Mmx ( 2 Nos For Las ) , Ct-Pt Unit Belting & Knee Bracing. , Prov.M.S Angle Iron ( 50X50x6 Mm ) , Length:2800 Mm X 4 Nos , Prov.M.S Angle Iron ( 50X50x6 Mm ) , Length:460 Mm X 2 Nos , Prov.G.O. Ab Switch Unit ( 11 Kv, 400 A, 25 Ka ) , Prov.D.O.Fuse Unit , Prov.Surge Arrestor, 9 Kv Station Class ( Porcelain Type ) , Prov.Disc.Insulator Sets ( Comprising 1 No Disc. ( Porcelain, Bs, 12 Kv , 90 Kn ) Including Dead End Clamps Etc. ) , Prov.Stay Set Complete , Prov.Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) , Prov.Pipe Earthing Set , Prov.Half Clamp ( M.S Flat 50X6 Mm ) , Prov.Full Clamp ( M.S Flat 50X6 Mm ) , Prov.Nuts & Bolts Of Various Sizes ( Galvanised ) / Coated ) 16 Mm F Or More ( With Flat And Spring Washer ) , Prov.Alluminium Thimble , Prov.Alluminium Thimble , Prov.Danger Plate , Prov.Barbed Wire , Prov. Xlpe Cable ( 3 Core ) 95 Mm2 , Prov. Cable Termination Kit Complete , Prov. Alluminium Paint , Add Transporation Charges , ( Erectionpart ) Ct / Pt Metering Unit , Digging Of Pit Forpole & Earthing ( 2 Nos For Poles & 2 Nos For Earth ) , Drilling Of Holes In X Arm , Preparation Of Plate Form Str. Member Ci, Ai, I.E X Arm And Knee Bracing Set. Erection Of Double Structure , Concreting Of Rcc Muff, Erection Ofplate Form, Erection Of X-Arm, Drop Out, Lightening Arrestors, Erection Of Ct / Pt Combined Unit, Energy Meter, Providing Earthing To G.O.Switch, Ct / Pt Unit Lightening Arrestor, Erection Of Two No Staysets. Sagging Of Conductor, Erection Of Jumpers, And Fixing Of Barbed Wire And Painting. Complete In All Respect As Directed By The Engineer-In-Charge Including All Types Of Risk & Incedental At Site.