Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Contract For Round The Clock Operation, Routine And Preventive Mechanical Maintenance And Housekeeping And Cleaning Works, Breakdown Mechanical Maintenance Of Complete Ash Handling Plant Of 1X660mw, Extn.-Ii, Htps Kasimpur Aligarh For Three Month. Submission Date for this Tender is 08-04-2022. Housekeeping Services Tenders in kasimpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Mar-2022 | date extension | Date | 08-04-2022 |
Sl. No. | Item Description |
1 | Round the Clock Operation, Routine & Preventive mechanical maintenance and housekeeping & cleaning works of Complete Ash Handling Plant of 1X660MW Extn.-II, HTPS Kasimpur Aligarh. |
2 | Round the Clock Operation, Routine & Preventive mechanical maintenance and housekeeping & cleaning works of Complete Ash Handling Plant of 1X660MW Extn.-II, HTPS Kasimpur Aligarh. |
3 | Breakdown mechanical maintenance works of various Auxiliaries of Ash Handling Plant of 1X660MW Extn.-II,HTPS Kasimpur Aligarh. |
4 | Dismantling & shifting of Ash Slurry Pump from its foundation to maintenance bay. |
5 | Shifting of Overhauled/New Ash Slurry Pump from maintenance bay to the foundation of Pump. |
6 | Complete overhauling of ‘M/s Indure’ make Ash Slurry Pumps |
7 | Dismantling & shifting of Coarse Ash Pump from its foundation to maintenance bay. |
8 | Shifting of Overhauled/New Coarse Ash Pump from maintenance bay to the foundation of Pump. |
9 | Complete overhauling of ‘M/s Indure’ make Coarse Ash Pump |
10 | Dismantling & Shifting of Vacuum Pumps from its foundation to maintenance bay. |
11 | Shifting of Overhauled/ New VacuumPumps from maintenance bay tothe foundation of the pump: |
12 | Providing manpower assistance for Overhauling of VacuumPumps in presence of OEM TA (Make: M/s Kakati, KVL-600 ) |
13 | Providing manpower assistance for servicing of Instrument Air Compressor with drier in presence of OEM TA (Make : M/s Atlas Copco, Model:ZR145) |
14 | Providing manpower assistance for servicing of Transport Air Compressor in presence of OEM TA (Make : M/s Atlas Copco, Model:ZA6G250) |
15 | Complete overhauling of ESP fluidizing air blower(Make : SWAM Pneumatics, Model: RH-85 WC) |
16 | Complete overhauling of silo fluidizing air blower(Make : SWAM Pneumatics, Model:RHH-20WC ) |
17 | Complete overhauling of silo vent air fan (Type: centrifugal, Make: M/s Maxim air). |
18 | Complete overhauling/Servicing of HMDC installed at silo. |
19 | Complete overhauling/Servicing of rotary feeder installed in silo tank |
20 | Dismantling &Shifting of BALP/FWP/FAHP/ BAHP/ Eco.Pump/HMDC Pump from its foundation to maintenance bay. |
21 | Shifting of overhauled/new BALP/FWP/FAHP/ BAHP/Eco.Pump/HMDC Pump from maintenance bay to the foundation of the pump. |
22 | Overhauling of Flushing Water Pump (FWP) |
23 | Overhauling of Bottom Ash Low Pressure Pump (BALP) |
24 | Overhauling of Fly Ash High Pressure Pump (FAHP) |
25 | Overhauling of Bottom Ash High Pressure Pump (BAHP) |
26 | Overhauling of Economizer Pump |
27 | Overhauling of Hydro Mix Dust Conditioner Pump (HMDCP) |
28 | Overhauling of HP Seal Water Pump |
29 | Overhauling of LP Seal Water Pump |
30 | Overhauling of Bottom Ash Overflow Pump (BAOFP) |
31 | Overhauling of Recycle Water Pump (RWP) |
32 | Overhauling of AHP Clarifier Sludge Pump |
33 | Overhauling of Alum, Lime andPoly ElectrolyteDosing Pump |
34 | Overhauling of Ash Water Recovery Pump |
35 | Overhauling of Recovery Pump Seal Water Pump |
36 | Overhauling of Drain Pumps installed at Ash Slurry pump house, Vacuum pump area,Silo area and Recovery clarifier area. |
37 | Overhauling of Bottom Ash Hopper Area Jet type Drain Pump |
38 | Providing manpower assistance for Overhauling of Fluidomat Make Fluid Coupling of Ash Slurry Pump in presence of OEM TA. |
39 | Providing manpower assistance for Overhauling of FluidomatMake Fluid Coupling ofCourse Ash Pump and Clinker Grinder drive assembly in presence of OEM TA. |
40 | Overhauling of New Allen berry worksMake Gear Box of Ash Slurry Pump |
41 | Overhauling of New Allen berry works Make Gear Box of Coarse Ash Pump and Clinker Grinder drive assembly. |
42 | Overhauling of Lube Oil Pump of Fluid Coupling of Ash Slurry Pump |
43 | Servicing of Oil cooler of Fluid Coupling of Ash Slurry Pump |
44 | Complete Servicing of Turbo driving system of Clarifier |
45 | Alignment of Ash Slurry Pump |
46 | Replacement of MS pipe line (Dia.250 NB to 350 NB) |
47 | Replacement of CI pipe line (Dia.200 NB to 250 NB) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail