| 1 | Capital Cost- CAPEX |
| 2 | Data Center& ICCC Hardware Cost |
| 3 | 42U Server Rack |
| 4 | Rack Server |
| 5 | SAN Switch |
| 6 | STORAGE(Application I PB) |
| 7 | Access Switch |
| 8 | IPKVM |
| 9 | Load Balancer (Network+Server+WAF) |
| 10 | IPPABX, ACD, IVR, Citizen engagement, Notification |
| 11 | UPS 30 KVA |
| 12 | DGSET |
| 13 | Access Control System |
| 14 | CCTV Camera |
| 15 | NVR |
| 16 | VESDA |
| 17 | Rodent Repellent |
| 18 | BMS |
| 19 | WLD |
| 20 | Video wall Including video controller |
| 21 | Workstations |
| 22 | Desktop with Monitor |
| 23 | 2 Rack-Smart Solution with cooling, fire supression and UPS |
| 24 | Wall Mount NW Rack 6U |
| 25 | Drone |
| 26 | MDT |
| 27 | Voice Gateway with 2 PRI & Voice Recorder |
| 28 | IP Phone |
| 29 | Data Center& ICCC Software Cost |
| 30 | Microsoft OS License( Processor License) |
| 31 | Redhat OS License( Processor License) |
| 32 | RDBMS (full server license) |
| 33 | Directory Services |
| 34 | Helpdesk |
| 35 | EMS |
| 36 | Virtualization Software |
| 37 | DRMS |
| 38 | HIPS |
| 39 | Antivirus(end point) |
| 40 | ICCC Application |
| 41 | Enterprise GIS application with MAPs |
| 42 | ICCC Application (Dharamshala as Tenant) |
| 43 | One City One App |
| 44 | City Portal |
| 45 | City Surveillance/Emergency Response System |
| 46 | Non-IT Infrastructure at Data Center& ICCC |
| 47 | Electrical Panel |
| 48 | LT Panel |
| 49 | Distribution Panel |
| 50 | Floor PDU |
| 51 | Fire Extinguisher |
| 52 | Comfort AC 1.0 Tr, Wiring, piping, ODU etc |
| 53 | Comfort AC 1.5 Tr, Wiring, piping, ODU etc |
| 54 | Comfort AC 2.0 Tr, Wiring, piping ODU etc. |
| 55 | Comfort AC 2.5 Tr, Wiring, piping ODU etc. |
| 56 | Comfort AC 3.0 Tr, Wiring, piping ODU etc. |
| 57 | Comfort AC 4.0 Tr. Wiring, piping ODU etc. |
| 58 | Civil Work |
| 59 | Furniture |
| 60 | LAN & Optical Fibre Cabling including required access switch for connecting devices |
| 61 | Additional Hardware/Software |
| 62 | Rack Server RAM (128 GB DDR4 Memory with Min 2400Mhz speed) |
| 63 | Rack Server Disk (1.6 TB 2.5 inch Enterprise performance 12G SAS SSD) |
| 64 | Primary Storage Flash/SSD disk (30 TB usable capacity) |
| 65 | Primary Storage SAS disk (30 TB usable capacity) |
| 66 | Primary Storage NL SAS disk (40 TB usable capacity) |
| 67 | Primary Storage Controller |
| 68 | Primary Storage Global cache (256 GB) |
| 69 | Primary Storage 10 Gbps iSCSI front-end ports |
| 70 | Primary Storage 16 Gbps FC front-end ports |
| 71 | SAN Switch Line Card with necessary license (populated with 24 ports with 16 Gbps FC configuration backward compatible to 4/8) |
| 72 | San Switch ports with necessary license (16 Gbps FC configuration backward compatible to 4/8) |
| 73 | Drone - Optional Payload |
| 74 | Drone Battery |
| 75 | Operational Cost - OPEX (Please enter \"Annual\" Unit cost) |
| 76 | Data Center& ICCC Hardware Cost |
| 77 | 42U Server Rack |
| 78 | Rack Server |
| 79 | SAN Switch |
| 80 | STORAGE (Application 1PB) |
| 81 | Access Switch |
| 82 | IP KVM |
| 83 | Load Balancer (Network+Server+WAF) |
| 84 | IPPABX, ACD, IVR, Citizen Engagement, Notification |
| 85 | UPS 30 KVA |
| 86 | DGSET |
| 87 | Access Control System |
| 88 | CCTV Camera |
| 89 | NVR |
| 90 | VESDA |
| 91 | Rodent Repellent |
| 92 | BMS |
| 93 | WLD |
| 94 | Video wall Including video controller |
| 95 | Workstations |
| 96 | Desktop with Monitor |
| 97 | Smart Racks with cooling, fire supression and UPS |
| 98 | Wall Mount NW Rack 6U |
| 99 | Drone |
| 100 | MDT |
| 101 | Voice Gateway with 2 PRI & Voice Recorder |
| 102 | IP Phone |
| 103 | Data Center& ICCC Software Cost |
| 104 | Microsoft OS License |
| 105 | Redhat Linux OS License |
| 106 | RDBMS |
| 107 | Directory Services |
| 108 | Helpdesk |
| 109 | Virtualization Software |
| 110 | DRMS |
| 111 | HIPS |
| 112 | Antivirus(end point) |
| 113 | ICCC Application |
| 114 | Enterprise GIS application with MAPs |
| 115 | ICCC Application (Dharamshala as Tenant) |
| 116 | One City One App |
| 117 | City Portal |
| 118 | City Surveillance/Emergency Response System |
| 119 | Non-IT Infrastructure at Data Center& ICCC |
| 120 | Electrical Panel |
| 121 | LT Panel |
| 122 | Distribution Panel |
| 123 | Floor PDU |
| 124 | Fire Extinguisher |
| 125 | Comfort AC 1.0Tr, Wiring, piping, ODU etc. |
| 126 | Comfort AC 1.5 Tr, Wiring, piping, ODU etc |
| 127 | Comfort AC 2.0 Tr, Wiring, piping ODU etc. |
| 128 | Comfort AC 2.5 Tr, Wiring, piping ODU etc. |
| 129 | Comfort AC 3.0 Tr, Wiring, piping ODU etc. |
| 130 | Comfort AC 4.0 Tr. Wiring, piping ODU etc. |
| 131 | Civil Work |
| 132 | Furniture |
| 133 | LAN & Optical Fibre Cabling |
| 134 | Existing DG Set at Shimla ICCC Location |
| 135 | Existing UPS at Shimla ICCC Location |
| 136 | Operational Manpower (to be proposed by Bidder to meet 24x7 Operational SLA) |
| 137 | Project Manager (Shimla) |
| 138 | Project Lead-cum-Network/IT Infra expert (Shimla) |
| 139 | Network Engineer (Shimla) |
| 140 | System Administrator (Shimla) |
| 141 | Database Administrator (Shimla) |
| 142 | ICCC Software Expert (Shimla) |
| 143 | Physical Infrastructure, Electrical, BMS, EPABX Expert (Shimla) |
| 144 | Team Leader cum System Administrator (Dharamshala) |
| 145 | Physical Infrastructure, Electrical, BMS, EPABX Engineer (Dharamshala) |
| 146 | System cum Network Engineer (Dharamshala) |