Centrifugal Pumps-2 Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Centrifugal Pumps-2 , Vacuum Tower Slop , Golaghat-Assam

Numaligarh Refinery Limited has published Centrifugal Pumps-2 Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Centrifugal Pumps-2 , Vacuum Tower Slop . Submission Date for this Tender is 29-03-2022. Couplings Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.




Tender Notice

31431787
Corrigendum : Centrifugal Pumps-2 Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Centrifugal Pumps-2 , Vacuum Tower Slop
Open Tender
Indian
Assam
Golaghat
29-03-2022

Tender Details

Centrifugal Pumps-2 Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Centrifugal Pumps-2 , Vacuum Tower Slop Oil Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Vacuum Tower Hot Well Water Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Catalyst Slop Oil Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Cooling Oil Circulation Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Vgo Backwash Oil Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Flare Kod Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Hos 2Nd Water Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Fractionator Water Pumps Centrifugal Pump, Seal, Seal System, Coupling Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Heavy Closed Blowdown Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Light Closed Blowdown Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Amine Blowdown Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Pure Condensate Transfer Pump Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Suspect Condensate Transfer Pump Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Pure / Suspect Condensate Transfer Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Blowdown Condensate Transfer Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition. , Oily Water Sump Pumps Centrifugal Pump, Seal, Seal System, Coupling, Motor With Terminal Box, Baseplate, Instruments And All Items As Per Mechanical Data Sheets And Project Specifications Attached With Material Requisition , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour ( Beyond Normal 8 Hours On Normal Working Days ) . ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testing As Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) . ( Bidders To Quote Over Timerate Per Hour )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Mar-2022 Corrigendum 1 Date 29-03-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Design, engineering, procurement, fabrication, inspection, testing, transportation, and supply of theCENTRIFUGAL PUMPS to be installed at Numaligarh Refinery Limited(NRL),Assam including Erection & Commissioning Spares, Mandatory Spares , Special Tools and tackles, Supervision for SAT & Commissioning at site as per the enclosed Tender standard specifications, Job specification, data sheets etc. and other codes and standards attached or referred as per Material Requisition for Numailgarh Refinery Limited, Golaghat, Assam, India.
Sl. No. Item Description
1VACUUM TOWER SLOP OIL PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
2VACUUM TOWER HOT WELL WATER PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
3CATALYST SLOP OIL PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
4COOLING OIL CIRCULATION PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
5VGO BACKWASH OIL PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
6FLARE KOD PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
7HOS 2ND WATER PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
8FRACTIONATOR WATER PUMPS Centrifugal pump, seal, seal system, Coupling Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
9HEAVY CLOSED BLOWDOWN PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
10LIGHT CLOSED BLOWDOWN PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
11AMINE BLOWDOWN PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
12PURE CONDENSATE TRANSFER PUMP Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
13SUSPECT CONDENSATE TRANSFER PUMP Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
14PURE/SUSPECT CONDENSATE TRANSFER PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
15BLOWDOWN CONDENSATE TRANSFER PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition.
16OILY WATER SUMP PUMPS Centrifugal pump, seal, seal system, Coupling, Motor with Terminal Box, Baseplate, Instruments and all items as per Mechanical Data Sheets and Project specifications attached with Material requisition
17Unit rate forSupervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( BIDDERS TO QUOTEUNIT RATE FOR DIEM CHARGES )
18Unit rate forSupervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR )
19Unit rate forSupervision Sevices of erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail