West Bengal Power Development Corporation Limited has published Unit 2 Boiler Overhauling For Pressure Parts And Safety Valves And Soot Blowers For Boiler Efficiency Improvement And Steaming License Renewal In July 2022 At Sgtpp- 1 Overhauling Of Boiler Drum 2 Scaffolding Of Fsh, Plsh, Mrh, Frh 3 Cleaning Of Furn. Submission Date for this Tender is 25-03-2022. Bags Supply Tenders in Murshidabad West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Overhauling of boiler drum |
2 | Scaffolding of FSH,PLSH,MRH,FRH |
3 | Cleaning of furnace Zone, Div. panel, steam tube, PLSH,MRH,FRH by HP water Jet. |
4 | Insertion of tube FSH,PLSH,RH,LTSH (Except LTSH bottom bank),Joint. |
5 | Removal and fitting of guard tube, guard plate. |
6 | Removal and fitting of Cassette Baffle of dimension 2200X500X58. |
7 | Scaffolding of Economiser Zone and cleaning of Economiser Zone and LTSH by LP water. |
8 | Inspection and run welding of economiser Hopper , All bracing pipe inspection , changing as per requirement, guard angle fitting upto APH inlet damper..Run welding of other area like Boilerdrum floor vent flush box and drain related pipe etc.(Running Meter). |
9 | Insertion of water wall tube ,economiser tube,LTSH bottom bank (Joint). |
10 | Supply and errection of scaffolding materials for furnace and other areas(LOT). |
11 | Sealing at top of bottom ash hopper by wooden planks, GI sheet and gunny bags(LOT). |
12 | Deposition of weld metal on tubes /stubs /header etc. |
13 | LTSH coil pulling , inspection and proper alignment of coil and pannel with clit and support welding. |
14 | Economiser coil lifting,inspection repairing and fitting with proper alignment(per coil/panel). |
15 | Div.panel,platen, Final SH,Middle RH, Final RH coil pulling ,inspection and proper alignment of coil and panel with clit and support welding (per coil/panel). |
16 | Replacement of HP valve of size 1# by straight tube or new valve. |
17 | Replacement of HP valve of size 2# by new valve. |
18 | Fitting of manual valve of size 4# at EBD line with approach platform(without SR & Radiography). |
19 | Fitting of manual valve of size 4# at Start up (without SR & Radiography) vent with approach platform. |
20 | Fabrication of different sizes of bends, U-loops etc. |
21 | Replacement of boiler metal temp. probe. |
22 | Welding of membrane strips/Skin casing for boiler. |
23 | D-metering of boiler tubes in all the high pressure zones of the boiler viz. LTSH, Economiser, platen SH, Medium R/H, Final R/H, Final S/H, Screen and cage wall, furnace wall, roof tubes etc. |
24 | Radiography of pressure parts welding joints. |
25 | Stress relieving of welding joints |
26 | Trivy test and Assistance to trivy test for Drum, SH,CRH&HRH. |
27 | Removal and repairing of refractory works at boiler Pr. parts area. |
28 | Arrangement of 1 no. crane /hydra(8ton) with fuel and operator. |
29 | Servicing of manholes and peepholes of boilers. |
30 | Seal plate and Deeper plate of trough seal Removing, Repairing and Replacement. |
31 | Inspection and Correction of buckstay and Steelwork. |
32 | Pressure parts area miscellaneous job |
33 | Stub joint dye penetrant testing (Limited to 10% of total stub joint). |
34 | MAGNETIC PARTICLE TEST (MPT) |
35 | Economiser coil taking outside at designated repairing site & refitting & inspection (including coil replacement)(Per Coil/Panel). |
36 | Safety valve Overhauling of DN 80 Drum Safety valve (Model-1749WB). |
37 | Safety valve Overhauling of DN 65 Superheat Safety valve (Model-1730WD). |
38 | Safety valve Overhauling of DN 100 HRH Safety valve (Model-1765WD). |
39 | Safety valve Overhauling of DN 150 CRH Safety valve (Model-1705RWB). |
40 | Safety valve Overhauling of DN 250 Aux hdr Safety valve. |
41 | Safety valve seat cutting |
42 | Boiler External cleaning by air & fire water. |
43 | HANGER SUPPORT OH WORK |
44 | ENGAGEMENT OF BEST EXPERT FOR HANGER SUPPORT OH WORK. |
45 | ENGAGEMENT OF EX-BHEL EXPRT FOR BOILER PRESSURE PART AND SAFETY VALVE. |
46 | Assistance of reheater hydro test |
47 | BOILER INSPECTOR SUNDRY EXPENSES (OTHER THAN FEES). |
48 | Installation of size 150NB isolating valve including line modification. |
49 | Assistance for RLA works. |
50 | Hiring of reciprocating pump for departmental & Inspector hydro test at 250kg/cm2. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail