|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil |
| 2 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping outwater as required |
| 3 | CARRIAGE OF MATERIALS By Mechanical Transport including loading,unloading and stacking earth lead up to 3.00 KM |
| 4 | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. |
| 5 | Distempering with oil bound washable distemper of approved brand and manufactureto give an even shade : Old work (one or more coats) |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: one or more coats on old work |
| 7 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 8 | Operation of combined effluent treatment plant(CETP) and OIL and Grease Trap(O&G) including pumping of RAW water from TS-1 & TS-2, dozing of chemicals in flashmixer, operation of pumps & Motors and Maintaining pumping records and records of chemical dozing etc. |
| 9 | Procurement of testing regents & daily & daily testing of RAW & treated effluent atsite laboratory by qualified environmental engineer / diploma holder/ chemist and obtaining test result & scope ofboth new & treated effluent weekly from thelaboratories reconised by the MOEF ( Ministry of Environment and Forest ) or NABL( National Accredation Board of Testing Laboratories ) OR CPCB/UPPCB/MPPCB/ as per enviornment protection act 1986, MOEF Notification Dated 21.02.1991, which was substantiated by gazzette notification dated 17.06.2005 and obtaining consent letter of air and water from MP & UP state and maintaining testingregents procuring and consumption records and Tests |
| 10 | Supply & Stacking in Position of ALUM etc. complete as per instruction of EIC |
| 11 | Supply & Stacking in Position of LIMEetc. complete as per instruction of EIC |
| 12 | Supply & Stacking in Position of Polyecetrolyte etc. complete as per instruction of EIC |
| 13 | Supply of Testing appartus/ equipment of CETP lab for daily testing of PH, TSS,COD, O&G, of raw and treated effuluent i.e. Digital PH Meter / Microprocessor based controlled model No. PH tutor or equivalentISI markeddual display standard bench type PH Range 0.00 TO 14.0 PH resolution .01 PH PH Accuracy .01 PH Model No. PH - Tutor calibrator POINT UP TO 3 POINT TEMPRATURE 0 TO 100 C Resolution : 0 accuracy -3C |
| 14 | Supply of testing appartus/ equipment of CETP lab for daily testing of PH, TSS,COD, O&G, of raw and treated effuluent i.e. beaker |
| 15 | Supply of testing appartus/ equipment of CETP lab for daily testing of PH, TSS,COD, O&G, of raw and treated effuluent i.e. iii Burnette 50 ml mob with stand |
| 16 | Total impact of GST for the purpose of CTC |