}

Rate Through E - Quotations Are Invited For Material Category Annexed As ( I ) 20 H.P. Solar Pump, Vfd, Solar Panel Set And ( Ii ) 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation S, hazaribag-Jharkhand

Water Resources Department-WRD has published Rate Through E - Quotations Are Invited For Material Category Annexed As ( I ) 20 H.P. Solar Pump, Vfd, Solar Panel Set And ( Ii ) 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation S. Submission Date for this Tender is 26-02-2022. Bolts Tenders in hazaribag Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

31164530
Rate Through E - Quotations Are Invited For Material Category Annexed As ( I ) 20 H.P. Solar Pump, Vfd, Solar Panel Set And ( Ii ) 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation S
Open Tender
Indian
Jharkhand
hazaribag
26-02-2022

Tender Details

Rate Through E - Quotations Are Invited For Material Category Annexed As ( I ) 20 H.P. Solar Pump, Vfd, Solar Panel Set And ( Ii ) 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme Rate Through E - Quotations Are Invited For Material Category Annexed As ( I ) 20 H.P. Solar Pump, Vfd, Solar Panel Set And ( Ii ) 10 H.P. Dc Solar Pump, Solar Panel, Steel Structure Supplying, Installation And Commissioning For Lift Irrigation Scheme , For 20 Hp Spv Ac Surface Pump , Solar Module Mounting ( Galvanised Steel ) Surface Structure ( For 50 Kw ) Having Hot Deep Galvanised Ofzinc Thickness 80Micron And As Per Is4759 With C Channel $ Anti Theft With Nut Bolt Of Grade Ss304, Which Should Also Withstand High Wind Velocity Upto 150Km / Hr Or As Per Mnre. , 50Kwp Spv Module Of 330Wp Or Higher Rating, Which Must Have Specification As Per Is 14286 / Iec 61215 .The Module Must Have To Quilifyis / Iec 61730 Part I $ Ii ( Or Having Mechanical Load Test Of 5400Pa ) For Safety Purpose.Module To Module Wattage Mismatch In Spv Array Shall Be + / -3% And To Qualify Iec Ts 62804-:2015 For The Detection Of Potential Induced Degradation And Warranted For Output Wattage Not Less Than 90% In 10Yrs And 80% At The End Of 25Yrs As Per Mnre. , Spv Controller / Vfd Integrated With Gprs, Having Mppt , Protection Ip 65 Or Above As Per Mnre To Run 20Hp Ac Solar Pump. , Solar Cable 4 Mm2usedas Per Is 694 Or As Per Mnre. , Copper Cable 95 Mm2 Used As Per Is 694 Or As Per Mnre. , Arrangement Of Lightening Arrestor Excluding Earthing For 50Kw & 3 Nos. 20Hp Solar Pump , 20 H.P. A.C. Solar Pump Set Ofhaving Performance With Respect To Total Head, Maximum Current, Capacity, Voltage Range Etc As Per Mnre Guidelines. , Array Junction Box ( Ip 65 Or Above ) As Per Mnre For 50Kw Spv. , Miscllaneous Accessories For Installation Of 20H.P. Solar Pump , Supplying, Installation And Commissioning Charge Of Module And Structure For 50Kw. , Maintenance For Atleast 5 Years Or As Per Mnre Guidelines For 50Kw Spv Module & 3 Nos. 20Hp Ac Solar Pump , For 10 Hp Spv Dc Surface Pump Solar Module Mounting ( Galvanised Steel ) Surface Structure For 50 Kw Having Hot Deep Galvanised Ofzinc Thickness 80Micron And As Per Is4759 With C Channel $ Anti Theft With Nut Bolt Of Grade Ss304which Should Also Withstand High Wind Velocity Upto 150Km / Hr Or As Per Mnre. , 50 Kwp Spv Module 330Wp Or Higher Which Must Have Specification As Per Is 14286 / Iec 61215 .The Module Must Have To Quilifyis / Iec 61730 Part I $ Ii ( Or Having Mechanical Load Test Of 5400Pa ) For Safety Purpose.Module To Module Wattage Mismatch In Spv Array Shall Be + / -3% And To Qualify Iec Ts 62804-:2015 For The Detection Of Potential Induced Degradation And Warranted For Output Wattage Not Less Than 90% In 10Yrs And 80% At The End Of 25Yrs As Per Mnre. , Spv Controller / Vfd Integrated With Gprs, Having Mppt , Protection Ip 65 Or Above As Per Mnre To Run 10Hp Dc Solar Pump. , Solar Cable Of 4Mm2 Used As Per Is 694 Or As Per Mnre , Copper Cable 25Mm2 Used As Per Is 694 Or As Per Mnre. , Arrangement Of Lightening Arrestor Excluding Earthingas Per Mnre For 50Kw Spv $ 5 Nos 10Hp Dc Solar Pump. , 10 H.P. D.C. ( Pmsm / Bldc / Srm ) Solar Pump Set Ofhaving Performance With Respect To Total Head, Maximum Current, Capacity, Voltage Range Etc As Per Mnre Guidelines. , Array Junction Box ( Ip 65 Or Above ) As Per Mnre For 50 Kw Spv. , Miscllaneous Accessories For Installation Of 10 H.P. Solar Pump , Supplying, Installation And Commissioning Charge Of Module And Structure For 50Kw. , Maintenance For Atleast 5 Years Or As Per Mnre Guidelines For 50Kw Spv Module & 5 Nos. 10Hp Dc Solar Pump

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Inviting quotation for Supplying Different Item of works regarding installation of 20 HP SPV AC Surface Pump and 10 HP SPV DC surface Pump
Sl. No. Item Description
1For 20 Hp SPV AC Surface Pump
2Solar Module Mounting (Galvanised Steel) surface structure (for 50 kW) having Hot deep galvanised ofZinc thickness 80micron and as per IS4759 with C Channel $ anti theft with nut bolt of grade SS304,which should also withstand high wind velocity upto 150km/hr or as per MNRE.
350kWp SPV module of 330wP or higher rating, which must have Specification as per IS 14286/IEC 61215 .The module must have to quilifyIS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose.Module to Module wattage mismatch in SPV Array shall be +/-3% and to qualify IEC TS 62804-:2015 for the detection of potential induced degradation and warranted for output wattage not less than 90% in 10yrs and 80% at the end of 25yrs as per MNRE.
4SPV controller/VFD integrated with GPRS,having MPPT ,Protection IP 65 or above as per MNRE to run 20HP AC Solar Pump.
5Solar cable 4 mm2usedas per IS 694 or as per MNRE.
6copper cable 95 mm2 used as per IS 694 or as per MNRE.
7Arrangement of Lightening Arrestor excluding Earthing for 50kW & 3 nos. 20HP Solar Pump
820 H.P. A.C. Solar pump set ofhaving performance with respect to Total Head,Maximum Current,Capacity, Voltage Range etc as per MNRE guidelines.
9Array junction box (IP 65 or above ) as per MNRE for 50kW SPV.
10Miscllaneous Accessories for Installation of 20H.P. Solar Pump
11Supplying,installation and commissioning Charge of Module and Structure for 50kW.
12Maintenance for atleast 5 years or as per MNRE guidelines for 50kW SPV module & 3 nos. 20HP AC Solar Pump
13For 10 Hp SPV DC Surface Pump Solar Module Mounting (Galvanised Steel) surface structure for 50 kW having Hot deep galvanised ofZinc thickness 80micron and as per IS4759 with C Channel $ anti theft with Nut Bolt of grade SS304which should also withstand high wind velocity upto 150km/hr or as per MNRE.
1450 kWp SPV module 330wP or higher which must have Specification as per IS 14286/IEC 61215 .The module must have to quilifyIS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose.Module to Module wattage mismatch in SPV Array shall be +/-3% and to qualify IEC TS 62804-:2015 for the detection of potential induced degradation and warranted for output wattage not less than 90% in 10yrs and 80% at the end of 25yrs as per MNRE.
15SPV controller/VFD integrated with GPRS,having MPPT ,Protection IP 65 or above as per MNRE to run 10HP DC Solar Pump.
16Solar cable of 4mm2 used as per IS 694 or as per MNRE
17Copper cable 25mm2 used as per IS 694 or as per MNRE.
18Arrangement of Lightening Arrestor excluding Earthingas per MNRE for 50kW SPV $ 5 nos 10HP DC Solar Pump.
1910 H.P. D.C. (PMSM/BLDC/SRM) Solar pump set ofhaving performance with respect to Total Head, Maximum Current,Capacity,Voltage Range etc as per MNRE guidelines.
20Array junction box (IP 65 or above) as per MNRE for 50 kW SPV.
21Miscllaneous Accessories for Installation of 10 H.P. Solar Pump
22Supplying,installation and commissioning Charge of Module and Structure for 50kW.
23Maintenance for atleast 5 years or as per MNRE guidelines for 50kW SPV module & 5 nos. 10HP DC Solar Pump
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail