| 1 | For 20 Hp SPV AC Surface Pump |
| 2 | Solar Module Mounting (Galvanised Steel) surface structure (for 50 kW) having Hot deep galvanised ofZinc thickness 80micron and as per IS4759 with C Channel $ anti theft with nut bolt of grade SS304,which should also withstand high wind velocity upto 150km/hr or as per MNRE. |
| 3 | 50kWp SPV module of 330wP or higher rating, which must have Specification as per IS 14286/IEC 61215 .The module must have to quilifyIS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose.Module to Module wattage mismatch in SPV Array shall be +/-3% and to qualify IEC TS 62804-:2015 for the detection of potential induced degradation and warranted for output wattage not less than 90% in 10yrs and 80% at the end of 25yrs as per MNRE. |
| 4 | SPV controller/VFD integrated with GPRS,having MPPT ,Protection IP 65 or above as per MNRE. |
| 5 | Solar cable 4 mm2usedas per IS 694 or as per MNRE. |
| 6 | copper cable 95 mm2 used as per IS 694 or as per MNRE. |
| 7 | Arrangement of Lightening Arrestor excluding Earthing |
| 8 | 20 H.P. A.C. Solar pump set ofhaving performance with respect to Total Head,Maximum Current,Capacity, Voltage Range etc as per MNRE guidelines. |
| 9 | Array junction box (IP 65 or above ) as per MNRE |
| 10 | Miscllaneous Accessories for Installation of 20H.P. Solar Pump |
| 11 | Supplying,installation and commissioning Charge of Module $ Structure |
| 12 | Maintenance for atleast 5 years or as per MNRE guidelines |
| 13 | For 10 Hp SPV DC Surface Pump |
| 14 | Solar Module Mounting (Galvanised Steel) surface structure for 50 kW having Hot deep galvanised ofZinc thickness 80micron and as per IS4759 with C Channel $ anti theft with Nut Bolt of grade SS304which should also withstand high wind velocity upto 150km/hr or as per MNRE. |
| 15 | 50 kWp SPV module 330wP or higher which must have Specification as per IS 14286/IEC 61215 .The module must have to quilifyIS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose.Module to Module wattage mismatch in SPV Array shall be +/-3% and to qualify IEC TS 62804-:2015 for the detection of potential induced degradation and warranted for output wattage not less than 90% in 10yrs and 80% at the end of 25yrs as per MNRE. |
| 16 | SPV controller/VFD integrated with GPRS,having MPPT ,Protection IP 65 or above as per MNRE. |
| 17 | Solar cable of 4mm2 used as per IS 694 or as per MNRE |
| 18 | Copper cable 25mm2 used as per IS 694 or as per MNRE. |
| 19 | Arrangement of Lightening Arrestor excluding Earthingas per MNRE. |
| 20 | 10 H.P. D.C. (PMSM/BLDC/SRM) Solar pump set ofhaving performance with respect to Total Head, Maximum Current,Capacity,Voltage Range etc as per MNRE guidelines. |
| 21 | Array junction box (IP 65 or above) as per MNRE |
| 22 | Miscllaneous Accessories for Installation of 10 H.P. Solar Pump |
| 23 | Supplying,installation and commissioning Charge of Module and Structure |
| 24 | Maintenance for atleast 5 years or as per MNRE guidelines |