Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India ,, guwahati-Assam

Indian Oil Corporation Limited-IOCL has published Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India ,. Submission Date for this Tender is 16-03-2022. Couplings Tenders in guwahati Assam. Bidders can get complete Tender details and download the document.




Tender Notice

30993909
Corrigendum : Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India ,
Open Tender
Indian
Assam
guwahati
16-03-2022

Tender Details

Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Vendor To Arrange Tpia Including All Tpia Charges ) , Supervision During Errection, Pre-Com, Commissioning, Packing, Supply Of The Equipment As Specified In The Document, Including Supply Of Commissioning Spares ( Note-1 ) & Special Tools And Tackles, All Auxiliaries & Documentation As Per The Enclosed Standard Specifications, Job Specification, Data Sheets Etc. And Other Codes And Standards Attached And As Specified In Material Requisition. , Sr-Kero-I Pumps ( 01-P-31 A / B ) Centrifugal Pumps With Mechanical Seal, Seal Flushing System, Bearing Lubrication & Cooling System If Applicable, Coupling And No Sparking Coupling Guard, Motor With Terminal Box, Motor Canopy, Motor Protecting Auxiliaries Like Space Heater, Rtds, Btds And Their Respective Terminal Boxes, Common Base Frame ( With Drip Pan, Drain Nozzle Pipe, Flange And Blind Flange ) , Vent Valve, Casing Drain Connection ( With Pipe, Drain Valve, Flange And Blind Flange ) , Companion Flanges If Applicable. , Suction Strainer As Per Technical Specifications For Strainers Doc No.Ioclgr- Cdu-Upc-Tss-001 , Mandatory Spares Supply Of Mandatory Spares For Each Tag As Per The Attached Job Specification , Special Tools And Tackles As Per Vendor Recommendation , 2 Years Operational Spares Priced List Of 2 Years Normal Operational & Maintenance Spares As Per Vendor Recommendation , Supervision At Site Vendor Supervision During Erection, Pre-Commissioning, And Commissioning ( Note 4 As Per Mr ) , Splitter-I Recirculation Pump ( 10-P-32 A / B ) Centrifugal Pumps With Mechanical Seal, Seal Flushing System, Bearing Lubrication & Cooling System If Applicable, Coupling And No Sparking Coupling Guard, Motor With Terminal Box, Motor Canopy, Motor Protecting Auxiliaries Like Space Heater, Rtds, Btds And Their Respective Terminal Boxes, Common Base Frame ( With Drip Pan, Drain Nozzle Pipe, Flange And Blind Flange ) , Vent Valve, Casing Drain Connection ( With Pipe, Drain Valve, Flange And Blind Flange ) , Companion Flanges If Applicable. , Suction Strainer As Per Technical Specifications For Strainers Doc No.Ioclgr- Cdu-Upc-Tss-001 , Mandatory Spares Supply Of Mandatory Spares For Each Tag As Per The Attached Job Specification , Special Tools And Tackles As Per Vendor Recommendation , 2 Years Operational Spares Priced List Of 2 Years Normal Operational & Maintenance Spares As Per Vendor Recommendation , Supervision At Site Vendor Supervision During Erection, Pre-Commissioning, And Commissioning ( Note 4 As Per Mr ) , Splitter-I Reflux Pump ( 10-P-33 A / B ) Centrifugal Pumps With Mechanical Seal, Seal Flushing System, Bearing Lubrication & Cooling System If Applicable, Coupling And No Sparking Coupling Guard, Motor With Terminal Box, Motor Canopy, Motor Protecting Auxiliaries Like Space Heater, Rtds, Btds And Their Respective Terminal Boxes, Common Base Frame ( With Drip Pan, Drain Nozzle Pipe, Flange And Blind Flange ) , Vent Valve, Casing Drain Connection ( With Pipe, Drain Valve, Flange And Blind Flange ) , Companion Flanges If Applicable. , Suction Strainer As Per Technical Specifications For Strainers Doc No.Ioclgr- Cdu-Upc-Tss-001 , Mandatory Spares Supply Of Mandatory Spares For Each Tag As Per The Attached Job Specification , Special Tools And Tackles As Per Vendor Recommendation , 2 Years Operational Spares Priced List Of 2 Years Normal Operational & Maintenance Spares As Per Vendor Recommendation , Supervision At Site Vendor Supervision During Erection, Pre-Commissioning, And Commissioning ( Note 4 As Per Mr ) , Topped Crude Pump ( 01-P-34 A / B ) Centrifugal Pumps With Mechanical Seal, Seal Flushing System, Bearing Lubrication & Cooling System If Applicable, Coupling And No Sparking Coupling Guard, Motor With Terminal Box, Motor Canopy, Motor Protecting Auxiliaries Like Space Heater, Rtds, Btds And Their Respective Terminal Boxes, Common Base Frame ( With Drip Pan, Drain Nozzle Pipe, Flange And Blind Flange ) , Vent Valve, Casing Drain Connection ( With Pipe, Drain Valve, Flange And Blind Flange ) , Companion Flanges If Applicable. , Suction Strainer As Per Technical Specifications For Strainers Doc No.Ioclgr- Cdu-Upc-Tss-001 , Mandatory Spares Supply Of Mandatory Spares For Each Tag As Per The Attached Job Specification , Special Tools And Tackles As Per Vendor Recommendation , 2 Years Operational Spares Priced List Of 2 Years Normal Operational & Maintenance Spares As Per Vendor Recommendation , Supervision At Site Vendor Supervision During Erection, Pre-Commissioning, And Commissioning ( Note 4 As Per Mr ) , Naphtha Splitter Feed Pump ( 056-P-51 ( N ) A / B ) Centrifugal Pumps With Mechanical Seal, Seal Flushing System, Bearing Lubrication & Cooling System If Applicable, Coupling And No Sparking Coupling Guard, Motor With Terminal Box, Motor Canopy, Motor Protecting Auxiliaries Like Space Heater, Rtds, Btds And Their Respective Terminal Boxes, Common Base Frame ( With Drip Pan, Drain Nozzle Pipe, Flange And Blind Flange ) , Vent Valve, Casing Drain Connection ( With Pipe, Drain Valve, Flange And Blind Flange ) , Companion Flanges If Applicable. , Suction Strainer As Per Technical Specifications For Strainers Doc No.Ioclgr- Cdu-Upc-Tss-001 , Mandatory Spares Supply Of Mandatory Spares For Each Tag As Per The Attached Job Specification , Special Tools And Tackles As Per Vendor Recommendation , 2 Years Operational Spares Priced List Of 2 Years Normal Operational & Maintenance Spares As Per Vendor Recommendation , Supervision At Site Vendor Supervision During Erection, Pre-Commissioning, And Commissioning ( Note 4 As Per Mr ) => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Feb-2022 Extention of Bid Submission Date Date 05-03-2022
2 25-Feb-2022 Reply To Prebid Queries and attachments Technical Bid 05-03-2022
3 28-Feb-2022 Technical Corrigendum III Technical Bid 05-03-2022
4 05-Mar-2022 Date Date 12-03-2022
5 08-Mar-2022 Technical Bid Technical Bid 12-03-2022
6 14-Mar-2022 Corrigendum Date Date 15-03-2022
7 15-Mar-2022 Corri date Date 16-03-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work:Supply of “CENTRIFUGAL PUMP’s” for Guwahati Refinery REVAMP OF CDU, NSF & NSU of M/s Indian Oil Corporation Limited (IOCL), India As Per Tender Conditions & Technical Specifications
Sl. No. Item Description
1Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, testing at manufacturer"s works, inspection by TPIA (Vendor to arrange TPIA including all TPIA charges), Supervision during Errection, Pre-Com, Commissioning, packing, supply of the equipment as specified in the document, including supply of commissioning spares (Note-1) & special tools and tackles, all auxiliaries & documentation as per the enclosed standard specifications, job specification, data sheets etc. and other codes and standards attached and as specified in Material Requisition.
2Sr-Kero-I Pumps (01-P-31 A/B) Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection (with Pipe, Drain valve, flange and blind flange), companion flanges if applicable.
3SUCTION STRAINER As per technical specifications for strainers Doc No.IOCLGR- CDU-UPC-TSS-001
4MANDATORY SPARES Supply of Mandatory spares for each Tag as per the attached Job specification
5SPECIAL TOOLS AND TACKLES As per vendor recommendation
62 YEARS OPERATIONAL SPARES Priced list of 2 years Normal operational & maintenance spares as per vendor recommendation
7SUPERVISION AT SITE Vendor supervision during erection, pre-commissioning, and commissioning (NOTE 4 As Per MR)
8Splitter-I Recirculation Pump (10-P-32 A/B) Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection (with Pipe, Drain valve, flange and blind flange), companion flanges if applicable.
9SUCTION STRAINER As per technical specifications for strainers Doc No.IOCLGR- CDU-UPC-TSS-001
10MANDATORY SPARES Supply of Mandatory spares for each Tag as per the attached Job specification
11SPECIAL TOOLS AND TACKLES As per vendor recommendation
122 YEARS OPERATIONAL SPARES Priced list of 2 years Normal operational & maintenance spares as per vendor recommendation
13SUPERVISION AT SITE Vendor supervision during erection, pre-commissioning, and commissioning (NOTE 4 As Per MR)
14Splitter-I Reflux Pump (10-P-33 A/B) Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection (with Pipe, Drain valve, flange and blind flange), companion flanges if applicable.
15SUCTION STRAINER As per technical specifications for strainers Doc No.IOCLGR- CDU-UPC-TSS-001
16MANDATORY SPARES Supply of Mandatory spares for each Tag as per the attached Job specification
17SPECIAL TOOLS AND TACKLES As per vendor recommendation
182 YEARS OPERATIONAL SPARES Priced list of 2 years Normal operational & maintenance spares as per vendor recommendation
19SUPERVISION AT SITE Vendor supervision during erection, pre-commissioning, and commissioning (NOTE 4 As Per MR)
20Topped Crude Pump (01-P-34 A/B) Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection (with Pipe, Drain valve, flange and blind flange), companion flanges if applicable.
21SUCTION STRAINER As per technical specifications for strainers Doc No.IOCLGR- CDU-UPC-TSS-001
22MANDATORY SPARES Supply of Mandatory spares for each Tag as per the attached Job specification
23SPECIAL TOOLS AND TACKLES As per vendor recommendation
242 YEARS OPERATIONAL SPARES Priced list of 2 years Normal operational & maintenance spares as per vendor recommendation
25SUPERVISION AT SITE Vendor supervision during erection, pre-commissioning, and commissioning (NOTE 4 As Per MR)
26Naphtha Splitter Feed Pump (056-P-51(N) A/B) Centrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection (with Pipe, Drain valve, flange and blind flange), companion flanges if applicable.
27SUCTION STRAINER As per technical specifications for strainers Doc No.IOCLGR- CDU-UPC-TSS-001
28MANDATORY SPARES Supply of Mandatory spares for each Tag as per the attached Job specification
29SPECIAL TOOLS AND TACKLES As per vendor recommendation
302 YEARS OPERATIONAL SPARES Priced list of 2 years Normal operational & maintenance spares as per vendor recommendation
31SUPERVISION AT SITE Vendor supervision during erection, pre-commissioning, and commissioning (NOTE 4 As Per MR)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail