Kerala Road Fund Board-KRFB has published Kiifb Providing And Fixing Boundary Stone For Land Acquisition And Allied Works In Construction Of Coastal Highway From Pallithura To Onnampalam Varkala In Thiruvananthapuram District Providing And Fixing Boundary Stone For Land Acquisition And Allied Wor. Submission Date for this Tender is 16-02-2022. Highway Construction Tenders in thiruvananthapuram Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | BONDARY STONE WORK |
2 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm |
3 | 2.4.1.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Lime Concrete, cement concrete grade M-10 and below - By Manual Means |
4 | OD65443/2021-2022:Peg marking and fixing boundary pegs Anjali wood of size 5*2.5*75 cm to line and levels on either side of the approach road as per approved alignment including cost of peg, conveyance and all charges for fixing stone etc.as per specification |
5 | 8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting . |
6 | OD65444/2021-2022:Daily Labour for engaging petty repairs |
7 | 14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. |
8 | OD71001/2021-2022:Providing computer printout of LA proposal drawing in standard size in colour copies as per the direction of the departmental officers |
9 | Boundary stones DAR |
10 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). |
11 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail