Chennai Petroleum Corporation Limited-CPCL has published Jp / B416-115-Ep-T-9501 / 1010 - Ppu / Pru - Epcc Package Of Cauvery Basin Refinery ( Cbr ) Project Of Cpcl Ppu / Pru - Epcc Package Of Cauvery Basin Refinery ( Cbr ) Project Of Cpcl , Lumpsum Turnkey Basis With Single Point Responsibility Includin. Submission Date for this Tender is 15-06-2022. Miscellaneous Fasteners Tenders in Nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-Mar-2022 | PRE-BID QUERIES-01 | Other | 04-04-2022 |
2 | 11-Mar-2022 | TECHNICAL AMENDMENT NO-TA-01 | Technical Bid | 04-04-2022 |
3 | 16-Mar-2022 | PRE BID REPLIES (TECHNICAL - SET-02) | Other | 04-04-2022 |
4 | 25-Mar-2022 | PRE BID REPLIES (TECHNICAL - SET-03) | Other | 04-04-2022 |
5 | 25-Mar-2022 | BDD EXTENSION | Date | 04-05-2022 |
6 | 13-Apr-2022 | REPLIES TO PRE-BID QUERIES -04 ( COMMERCIAL) | Other | 04-05-2022 |
7 | 18-Apr-2022 | PRE BID REPLIES (TECHNICAL - SET-04) | Other | 04-05-2022 |
8 | 22-Apr-2022 | BDD EXTENSION-2 | Date | 25-05-2022 |
9 | 29-Apr-2022 | PRE BID REPLIES (TECHNICAL - SET-05) | Other | 25-05-2022 |
10 | 10-May-2022 | BOQ | BOQ | 25-05-2022 |
11 | 10-May-2022 | CA-01 | Other | 25-05-2022 |
12 | 12-May-2022 | REPLIES TO PRE-BID QUERIES - COMMERCIAL (LOT-2) | Other | 25-05-2022 |
13 | 13-May-2022 | TECHNICAL AMENDMENT NO-TA-02 | Technical Bid | 25-05-2022 |
14 | 14-May-2022 | BDD EXTENSION-3 | Date | 01-06-2022 |
15 | 17-May-2022 | TECHNICAL AMENDMENT NO.-03 | Technical Bid | 01-06-2022 |
16 | 20-May-2022 | REVISED BOQ | BOQ | 01-06-2022 |
17 | 20-May-2022 | COMMERCIAL AMENDMENT No.2 (B416-9501-1010-CA-02) | Other | 01-06-2022 |
18 | 20-May-2022 | REPLIES TO PRE-BID QUERIES - 06 | Other | 01-06-2022 |
19 | 24-May-2022 | PRE BID REPLIES (TECHNICAL- SET-07) | Other | 01-06-2022 |
20 | 24-May-2022 | PRE BID REPLIES TECHNICAL - SET-08 | Other | 01-06-2022 |
21 | 25-May-2022 | REPLIES TO PRE-BID QUERIES - COMMERCIAL (LOT-3) | Other | 01-06-2022 |
22 | 27-May-2022 | PRE BID REPLIES (TECHNICAL - SET-09) | Other | 01-06-2022 |
23 | 30-May-2022 | BDD EXTENSION-04 | Date | 15-06-2022 |
24 | 30-May-2022 | BDD EXTENSION-4 | Date | 15-06-2022 |
25 | 08-Jun-2022 | PRE-BID REPLIES (TECHNICAL - SET-10) | Other | 15-06-2022 |
26 | 08-Jun-2022 | REPLIES TO PRE-BID QUERIES - COMMERCIAL (LOT-4) | Other | 15-06-2022 |
Sl. No. | Item Description |
1 | LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, updation of FEED Package, Detailed Design and Engineering,Smart Plant 3D Modeling(E3D), Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects along withWare house and dispatch loading facility as per provision of Bidding Document. Supply of all materials including, but not limited to, - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight/ air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc.,supply of start-up / pre-commissioning / commissioning / mandatory spares, catalyst /chemicals /Absorbent/ lubricants (Except Owner supplied catalyst ) for first fill and 6 (six) months operation as per tech. specifications. Construction / Erection including, but not limited to,loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site,assembly / sub-assembly of the equipments, erection, installation, testing, Inspection,pre-commissioning / commissioning &PGTR, training to Owner personals, handing over to owner including all disciplines of work and supply of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. • Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional. |
2 | FOREIGN CURRENCY PART |
3 | INDIAN CURRENCY PART |