Construction Of Ware House For The Storage Of Evm And Vvpat Machines In Kannur District Sitc Of Lift Construction Of Ware House For The Storage Of Evm And Vvpat Machines In Kannur District Sitc Of Lift, Kannur-Kerala
TDR : 30896080
Tender Notice
BOQ
Expired
Kannur
Kerala
Construction Of Ware House For The Storage Of Evm And Vvpat Machines In Kannur District Sitc Of Lift Construction Of Ware House For The Storage Of Evm And Vvpat Machines In Kannur District Sitc Of Lift
Work Name: Construction of ware house for the storage of EVM and VVPAT machines in Kannur District - SITC of LIFT
Sl. No.
Item Description
1
LIFT
2
od183809/2019_2020 : Supply, Installation,Testingand Commissioning of 15 passenger capacity Lift machine room typegear less with the following specification including all required standard features.1Type of Lift:15 Passenger capacity ,Passenger lift - Gearless (Machinroom type) 2 Load / Persons 1020 Kg. / 15 persons 3Rated speed 1 M/Sec. 4Travel12.6Mtr ( Approx) 5No. of floor and entrance servedCellar+Ground+2 floor - 4openings 6No. of floor served Four floors 7Method of control Micro processor basedV3F with ARD system. 8Location of machine room Above lift well 9Size of lift well 1900 mm X 3000 mm 10 Car entranceAs per IS 11 Leveling accuracy As per IS 12 Car door openingAs per IS 13 Drive Variable voltage variable frequency(V3F) 14 OperationSimplex full selective colllective control with ON/OFF switch15 Construction of design and furnishing of car body work Vandal proof Stainless steel finish cabinet with Scratch proof Stainless steel door, Stainless steel mirror finish ceiling, 3 mm aluminium anti skid flooring, fan with timer cut-off, push to talk, LED display, LED light, hand rails and floor announcement system. All buttons in car and all landings should have Braille sign.16 Landing entranceAutomatic centre/Telescopic opening Vandal proof stainless steel sliding door as per ISS with provision for mechanical opening key for emergency with full length infra red light curtains and Stainless Steel body with vision tunnel. 17 Call and position indicatorsUp/down direction & position Dot Matrix LED indication shall be provided at all landings 18 Electric supply1) Light 230/50C/s single phase 2 wire system. 2) 415V 50C/s 3 phase 4 wire system. 19 Infra red door opening systemTo be provide for entire length of the door 20 Automatic Rescue DeviceProvide automatic rescue device with an electronic controller powered by 4 Nos. 12V 24 AH dry free maintenance batteries. The rescue operation should act within 10 seconds of power failure.21 Regulation 350V- 450V (SMPS based) 22 Indication in the cara) Car position b) Call indicator c) Door close/open push button d) Emergency stop button e) Flush mounted switch for fan and light f) Non stop button g) Battery operated emergency lamp with rechargeable batteries. h) Battery operated alarm bell i) Intercom wiring with one master unit with two slaves j) Fireman\"s switch at main lobby i) Auto attendant control (inside the car) 23 Winding handleManual winding handle for use in emergency. 24 Safeties a) Over speed governor, operated safety gear b) Buffers c) Motor over load protection d) Phase reversal protectione) Other safeties as per ISS f) Single phase preventor g) Final limit switch 25 Levelling Automatic levelling at all landing as per IS 26 GuaranteeCompany shall carry out free maintenance during warranty period of 36 months which also includes a) Cleaning lift equipment b) Lubrication of all moving parts c) Replacing of lubricating oil when required d) Checking and adjusting contacts e) Replacing fusible item alarm etc. f) Recharging batteries in case of drain/ renewing batteries g ) Replacing /rewinding of all defective parts of the lift including motors and V3F unit. 27 Control panelControl panel will be dust and vermin proof of sheet metal enclosure 28 Announcement System To provide lift announcement system 29 TestsAt site test as per IS to be carried out and approval from Electrical Inspectorate before Handing over. 30 Scope of work:-a) Supply of lift materialsb)Minor civil works such as removal of temporary brick work in the lift entrance without affecting the building structure, finishing/ altering civil works in lift entrance/ pit& plastering if necessary including minor civil works such as constructionof buffer block in the pit machine foundation in the machine room, cutting pockets and grounding brackets for the guide rails, grouting boxes for control units, correction of wall opening in the front side of the wall by additional brick work or cutting existing brick work including core cutting of machine room c) Scaffolding d) Door frames e) Supporting steel f) Temporary electric supply for installation of lift. Electric supply for testing and commissioning of lift is to be arranged by the firm on their own account. g) Intercom facilities with one master and two slaves h) Battery operated alarm i) Obtaining Scheme approval as well as energization Certificate from the electrical Inspectorate including preparation of necessary drawing for the same.Necessary fee shall remitted to the Inspectorate by the firm for which no refund will be made from the department including taking insurance for one year as per new lift rule. j)Supply ofbookletwithcompletedetailsofmaintenance scheduleandcontrol diagram. k) Giving training to department staff for attending trouble shooting l) Free servicing for 36 months after handing over
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.