|
| 1 | SUPPLY OF INTEGRATED ANALYSERFOR NREP PROJECTDesign, detail engineering, procurement, manufacturing, assembly, testing, inspection, packing, forwarding and supply till site including Commissioning spares for ANALYSER SHELTER (TAG NO. 1P27-AS-0001) -1 No. as specified in Material Requisition. |
| 2 | SUPPLY OF INTEGRATED ANALYSERFOR NREP PROJECTDesign, detail engineering, procurement, manufacturing, assembly, testing, inspection, packing, forwarding and supply till site including Commissioning spares for GAS CHROMATOGRAPH (BENZENE)(TAG NO. 11P27- AT -300001 ) -1 No. as specified in Material Requisition. |
| 3 | SUPPLY OF INTEGRATED ANALYSERFOR NREP PROJECTDesign, detail engineering, procurement, manufacturing, assembly, testing, inspection, packing, forwarding and supply till site including Commissioning spares for SULPHUR ANALYSER(TAG NO. 1P27- AT-300002 ) -1 No.as specified in Material Requisition. |
| 4 | SUPPLY OF INTEGRATED ANALYSERFOR NREP PROJECTDesign, detail engineering, procurement, manufacturing, assembly, testing, inspection, packing, forwarding and supply till site including Commissioning spares for SULPHUR ANALYSER(TAG NO. 1P27- AT-302601 ) -1 No. as specified in Material Requisition. |
| 5 | Charges for SITE Supervision of Erection / Installation andTesting for INTEGRATED ANALYSER |
| 6 | Per diem charges for upto 8 hours work on normal working days. |
| 7 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 8 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
| 9 | Charges for Training for INTEGRATED ANALYSER as per MR |
| 10 | Per diem charges for training at NRL site as per MR |
| 11 | Lumpsum Charges for Trainingat OEM\"s Work as mentionedin the MR |