Military Engineer Services-MES has published Maintenance Dredging Of Naval Channel And Alongside Naval Berths In Naval Area At Visakhapatnam Maintenance Dredging Of Naval Channel And Alongside Naval Berths In Naval Area. Submission Date for this Tender is 11-03-2022. Dredging Work Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Jan-2022 | Pre bid meet | Date | 31-01-2022 |
2 | 17-Jan-2022 | Postponment | Date | 07-02-2022 |
3 | 28-Jan-2022 | Postponment1 | Date | 18-02-2022 |
4 | 02-Feb-2022 | Revised BOQ | BOQ | 18-02-2022 |
5 | 08-Feb-2022 | Amendments | Other | 18-02-2022 |
6 | 10-Feb-2022 | Postponment3 | Date | 11-03-2022 |
Sl. No. | Item Description |
1 | SCHEDULE "A" PART - I [DREDGING] |
2 | Dredging of Sea bed of Naval channel (and adjacent areas), by using TSHD to the 13 mtr depth or any suitable requirement/method to the required level in all types of soil comprising of clay, silt, sand, gravel, their admixtures etc, (other than rock) and dumping of the material at sea in designated locations by VPTetc complete all as specified and as directed by Engineer -in- charge. |
3 | Dredging alongside the 15 mtr towards from Jetty and up to 11 mtr to 17 mtr of depth in clay, silt, sand, gravel, their admixture etc. by using BACKHOE and dumping of the material at sea in designated locations by VPT etc complete all as specified and as directed by Engineer -in- charge. |
4 | Dredging of Sea bed of Naval channel and adjacent areas, by any type of dredging method to the required level in all types of soil comprising of hard patches their admixtures etc, and dumping of the material at sea in designated locations by VPT etc complete all as specified and as directed by Engineer -in- charge. |
5 | Note for Item Nos. 1.1 to 1.3: The rate quoted for these items shall be deemed to be included siltation charges as per clause no. 52.3 of Schedule "A" Notes |
6 | SUB TOTAL OF SCHEDULE "A" Part - I |
7 | SCHEDULE "A" PART - II [MOBILISATION & DEMOBILISATION] |
8 | Mobilisation of dredging equipments on completion of :- |
9 | Minimum 240000 cum of dredging by TSHD. |
10 | Minimum 15000 cum of dredging by BACKHOE / Grab Dredger. |
11 | Note for Item Nos. 2.11 and 2.12: (i) Minimum equipment requirement against item No 2.11:- (aa) Trailer suction hopper dredger (TSHD) of hopper capacity between 5000 to 8000 cum - 01 No. (ii) Minimum equipment requirement against item No 2.12:- 01 Nos backhoe supported by 02 Nos hopper self propelled/dumb barges of minimum 400 cum capacity each necessary with towing tugs. and 01 Nos grabber supported by 02 nos self propelled/dumb barges of minimum 400 cum capacity each necessary with towing tugs. (iii)Boat with advance survey equipment and hypack software - 02 Nos. (iv) Any other suitable supporting equipments required for execution of work. |
12 | Demobilisation of dredging equipments including their ancillaries after completion of work :- |
13 | Against Item No 2.11 above. |
14 | Against Item No 2.12 above. |
15 | Note for Item Nos. 2.11 to 2.22: Payment terms for operating these items shall be as specified in clause no. 32 of particular specifications Note for Item Nos. 1.1 to 2.22: No idle charges will be paid for any events and same shall be deemed to include in the quoted rates |
16 | SUB TOTAL OF SCHEDULE "A" Part - II |
17 | Total in Figures |
18 | Quoted Amount in Words |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail