|
| 1 | Supplying, installing & testing UTP connector (RJ-45)as per specification No. WG-NAS/UTPC |
| 2 | Supplying, fixing, and configuring of8-ports managed gigabit switches layer-2, 10/100/1000 base-T PoE smart switch plus 2 SFP only complete(Industrial Grade) |
| 3 | Supplying, fixing, and configuring of ONU/ ONT as per specification |
| 4 | OLT - 8-port, Supply, installation, testing commissioning |
| 5 | Supply, Installing, Testing & commisioning of Housing& brackets, for camera |
| 6 | Supply, installation of 4 Core - Optic Fibre Cable (mtr) with accessories |
| 7 | SupplyinganderectingISI mark, powdered coated G.I. pipepole 80 mm dia 6 m longwith pole cap, base plate in provided foundation as per specification no. OH-PL/GIP |
| 8 | Making cement concrete foundation including excavation ( 45x 45 x 120 ) cm deep in 1:3:6 cement concrete, 20 to 25 mm stone metal, (45x 45x 45) cm / 45 cm dia. x 45 cm height plinth duly plastered,with necessary curing and finishing complete. (for 6 m pole) |
| 9 | Electric Supply Meter, Supply, installation, testing commissioning |
| 10 | Supplying & installing single mode fibre patch cord 3 m – duplex complete |
| 11 | Supplying and erecting metal work in CRCA sheet with fabrication of boxes, panel boards etc, including cutting, bending, drilling, welding, rivetting, treated with anti rust treatment of powder coated or painted |
| 12 | Supplying & installing UTP networking cat-6 armouredcable suitable for LAN / WAN Computer net-working as per specification No. WG-COC/NC |
| 13 | Providing earthling with copper earth plate size 30 x 30 x 0.315 cm complete with all materials, testing & recording the results as per specification no. EA-EP |
| 14 | Providingpipetype earthling with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rodcomplete with all materials as per specification no. EA-EP |
| 15 | Supplying, fixing and commissioning 2 pole,RCBO (residual current breaker with overcurrent short circuit 10 kA and earth leakage protection),with 30/100/300 mA sensitivity and having capacity of 6/10/16/20/25A, as per specification no SW-RCCB/RCBO |
| 16 | Supplying & fixing CRCA sheet Box with earthling terminals for housing 2 Pole RCCBon iron frame/laminated board complete |
| 17 | Supplying and erecting 12 V/100Ah tubular battery with battery terminal wire, duly charged complete with 36 months warranty complete |
| 18 | Supplying, installing, testing and commissioning of 800 VA to 900 VA Digital pure sine wave inverter based on Insulated Gate Bipolar Transistor (IGBT) technology single phase 230V,50 Hz completeas per specification no.AP-INV (Without batteries) |
| 19 | NVR 64- 8 SATA , Supply, installation, testing commissioning . Operating temperature 0°C to +50°C (32°F to 122°F)Humidity range 5% to 95% RH Non-Condensing |
| 20 | HDD (6 TB), Supply, installation, testing commissioning |
| 21 | Supplying & erecting on line UPSpure sine wave of 2 kVA capacity complete with standard features, along with necessary SMF batteries for 30 mins battery backup,as per specification no. AP-UPS |
| 22 | ANPR Software. Supply, installation, testing and maintenance |
| 23 | Supply installation testing and commissioning of2Mp (1980 x 1080) bullet camera with motorized varifocal lens as per specifications. CE, UL, BIS certificates |
| 24 | Supply, installation, testingof2 MP (1920 x 1080) , 30 X PTZ camera as per specifications. CE, UL, BIS certificates |
| 25 | Supply, installation, testing of Min.55 inches display, 24 x 7 operation |
| 26 | Work Station, Supply, installation, testing |
| 27 | Display Unit65” Inches, Supply, installation, testing commissioning |
| 28 | 4 Way OFC Termination Box |
| 29 | Ratio Coupler (Splitter) 20:80 |
| 30 | Ratio Coupler (Splitter) 10:90 |
| 31 | Ratio Coupler (Splitter) 5:95 |
| 32 | Installation & Integration of existing CCTV, Server provided by IG Office KNR |