}

Bids Are Invited For Supply Of Gm Office Ac - High Wall 1.0 Tr ( Or Above ) Capicity Type Unit. ( Gm Office ) , Supply Of Reception Lobby Ac - High Wall 1.5 Tr ( Or Above ) Capicity Type Unit. ( Reception Lobby And Office ) , Suppl, Gandhinagar-Gujarat

Ministry of Housing and Urban Affairs has published Bids Are Invited For Supply Of Gm Office Ac - High Wall 1.0 Tr ( Or Above ) Capicity Type Unit. ( Gm Office ) , Supply Of Reception Lobby Ac - High Wall 1.5 Tr ( Or Above ) Capicity Type Unit. ( Reception Lobby And Office ) , Suppl. Submission Date for this Tender is 19-01-2022. Retaining Hardware Tenders in Gandhinagar Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

30535643
Corrigendum : Bids Are Invited For Supply Of Gm Office Ac - High Wall 1.0 Tr ( Or Above ) Capicity Type Unit. ( Gm Office ) , Supply Of Reception Lobby Ac - High Wall 1.5 Tr ( Or Above ) Capicity Type Unit. ( Reception Lobby And Office ) , Suppl
Indian
Gujarat
Gandhinagar
19-01-2022

Tender Details

Bids Are Invited For Supply Of Gm Office Ac - High Wall 1.0 Tr ( Or Above ) Capicity Type Unit. ( Gm Office ) , Supply Of Reception Lobby Ac - High Wall 1.5 Tr ( Or Above ) Capicity Type Unit. ( Reception Lobby And Office ) , Supply Of Photocopy Room Office Ac - High Wall 2.0 Tr ( Or Above ) Capicity Type Unit. ( Photocopy Room ) , Installation Of All Ac For Gf - Air-Conditioning Work:-Installation Each Machine , Supply And Installation Of Copper Pipe And Accessories - Supply, Installation, Testing & Commissioning Of The Following Components For System All Refrigerant Copper Pipping For System Having Along With Insulation And Supports, Between Indoor & Outdoor Units Duly Insulated As Per Specifications.All Pipping Inside The Room, Inside The Vertical Shaft & Over The Terrace Shall Be Properly Supported On Perforted Trays With Hanger & Exposed Pipping Shall Be Properly Covered. The Rates Shall Be Included With All Control Cabels For Communicating Indoor Unit To Outdoor Unit. The Rate Shall Includes Topping Up Refrigerant For Complete System Having Total Refrigerant Pipping Length. , Supply Of Ff Office Ac - High Wall 1.0 Tr ( Or Above ) Capicity Type Unit. ( Office ) , Supply Of Ac For Ff Office - High Wall 1.5 Tr ( Or Above ) Capicity Type Unit. ( Office ) , Supply Of Server Room And 6Th Floor Ac - High Wall 2.0 Tr ( Or Above ) Capicity Type Unit. ( Server Room At 1St And 6Th Floor ) , Installation Of All Ac For Ff - Air-Conditioning Work:-Installation Each Machine , Supply And Installation Of Accessories And Copper Pipe - Supply, Installation, Testing & Commissioning Of The Following Components For System All Refrigerant Copper Pipping For System Having Along With Insulation And Supports, Between Indoor & Outdoor Units Duly Insulated As Per Specifications.All Pipping Inside The Room, Inside The Vertical Shaft & Over The Terrace Shall Be Properly Supported On Perforted Trays With Hanger & Exposed Pipping Shall Be Properly Covered. The Rates Shall Be Included With All Control Cabels For Communicating Indoor Unit To Outdoor Unit. The Rate Shall Includes Topping Up Refrigerant For Complete System Having Total Refrigerant Pipping Length. , Supply And Installation Of Odu Stand - Fabrication And Erection Of The Ms Structural Cage For Mounting The Outdoor Of Acs Inside The Shaft. The Cage Should Be Painted With Red Oxide And Enamel Paint. , Supply Of Cassette Ac On 5Th Floor - Cassette Type 1.5 Tr Capicity Unit. , Supply Of Cassette Ac For 5Th Floor - Cassette Type 3.0 Tr Capicity Unit. , Installation For Cassette Ac For 5Th Floor - Air-Conditioning Work:-Installation Each Machine , Supply And Installation Of Cassette Ac Copper Pipe And Accessories. - Supply, Installation, Testing & Commissioning Of The Following Components For System All Refrigerant Copper Pipping For System Having Along With Insulation And Supports, Between Indoor & Outdoor Units Duly Insulated As Per Specifications.All Pipping Inside The Room, Inside The Vertical Shaft & Over The Terrace Shall Be Properly Supported On Perforted Trays With Hanger & Exposed Pipping Shall Be Properly Covered. The Rates Shall Be Included With All Control Cabels For Communicating Indoor Unit To Outdoor Unit. The Rate Shall Includes Topping Up Refrigerant For Complete System Having Total Refrigerant Pipping Length. , Supply And Installation Of Drain With Insulation - Drain Pipe Line For Indoor Machine With Insulation. , Maintenanace And Service Of All Acs - Annual Maintenance Of The Installed Acs Witj Biweekly Preventive Maintainance And Changing Of Any Spares In Case Of Requirement For The Duration Of 3 Years Total Quantity : 1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 12-Jan-2022 17-01-2022
2 17-Jan-2022 19-01-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 27.80 Lakhs /-

BOQ Items

Sl. No. Item TitleItem Description
1Supply of GM Office ACHigh Wall 1.0 tr (or above)Capicity Type unit.(GM Office)
2Supply of Reception Lobby ACHigh Wall 1.5 tr (or above)Capicity Type unit.(Reception Lobby and Office)
3Supply of Photocopy room office ACHigh Wall 2.0 tr (or above)Capicity Type unit.(Photocopy room)
4Installation of all AC for GFAIR-CONDITIONING WORK:-Installation each machine
5Supply and Installation of Copper pipe and accessoriesSupply,installation,Testing & Commissioning of the following components for system All refrigerant copper pipping for system having along with insulation and supports, between indoor & outdoor units duly insulated as per specifications.All pipping inside the room, inside the vertical shaft & over the terrace shall be properly supported on perforted trays with hanger & exposed pipping shall be properly covered. The rates shall be included with all control cabels for communicating indoor unit to outdoor unit. The rate shall includes topping up refrigerant for complete system having total refrigerant pipping length.
6Supply of FF office ACHigh Wall 1.0 tr (or above)Capicity Type unit.( Office)
7Supply of AC for FF officeHigh Wall 1.5 tr (or above)Capicity Type unit.(Office)
8Supply of Server room and 6th floor ACHigh Wall 2.0 tr (or above)Capicity Type unit.(Server room at 1st and 6th Floor)
9Installation of all AC for FFAIR-CONDITIONING WORK:-Installation each machine
10Supply and installation of Accessories and Copper PipeSupply,installation,Testing & Commissioning of the following components for system All refrigerant copper pipping for system having along with insulation and supports, between indoor & outdoor units duly insulated as per specifications.All pipping inside the room, inside the vertical shaft & over the terrace shall be properly supported on perforted trays with hanger & exposed pipping shall be properly covered. The rates shall be included with all control cabels for communicating indoor unit to outdoor unit. The rate shall includes topping up refrigerant for complete system having total refrigerant pipping length.
11Supply and Installation of ODU standFabrication and erection of the MS structural Cage for mounting the outdoor of AC"S inside the shaft. The cage should be painted with REd oxide and Enamel paint.
12Supply of Cassette AC on 5th FloorCASSETTE TYPE 1.5 tr Capicity unit.
13Supply of Cassette AC for 5th FloorCASSETTE TYPE 3.0 tr Capicity unit.
14Installation for Cassette AC for 5th FloorAIR-CONDITIONING WORK:-Installation each machine
15Supply and Installation of Cassette AC Copper Pipe and Accessories.Supply,installation,Testing & Commissioning of the following components for system All refrigerant copper pipping for system having along with insulation and supports, between indoor & outdoor units duly insulated as per specifications.All pipping inside the room, inside the vertical shaft & over the terrace shall be properly supported on perforted trays with hanger & exposed pipping shall be properly covered. The rates shall be included with all control cabels for communicating indoor unit to outdoor unit. The rate shall includes topping up refrigerant for complete system having total refrigerant pipping length.
16Supply and Installation of Drain with insulationDrain pipe line for Indoor machine with insulation.
17Maintenanace and Service of All AcsAnnual Maintenance of the installed AC"s witj biweekly preventive maintainance and changing of any spares in case of requirement for the duration of 3 Years
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail