Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Biennial Contract For Round The Clock Operation Routine And Preventive Mechanical Maintenance And Housekeeping And Cleaning Works Breakdown Mechanical Maintenance Of Complete Ash Handling Plant Of 1X660mw Extn Ii Htps Kasimpur Aligarh. Submission Date for this Tender is 21-03-2022. Housekeeping Services Tenders in Aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-Jan-2022 | Technical Bid | Technical Bid | 03-03-2022 |
2 | 25-Jan-2022 | Date | Date | 03-03-2022 |
3 | 04-Mar-2022 | date extension | Date | 21-03-2022 |
Sl. No. | Item Description |
1 | Round the Clock Operation, Routine & Preventive mechanical maintenance and housekeeping & cleaning works of Complete Ash Handling Plant of 1X660MW Extn.-II, HTPS Kasimpur Aligarh. |
2 | Round the Clock Operation, Routine & Preventive mechanical maintenance and housekeeping & cleaning works of Complete Ash Handling Plant of 1X660MW Extn.-II, HTPS Kasimpur Aligarh. |
3 | Breakdown mechanical maintenance works of various Auxiliaries of Ash Handling Plant of 1X660MW Extn.-II,HTPS Kasimpur Aligarh. |
4 | Dismantling & shifting of Ash Slurry Pump from its foundation to maintenance bay. |
5 | Shifting of Overhauled/New Ash Slurry Pump from maintenance bay to the foundation of Pump. |
6 | Complete overhauling of ‘M/s Indure’ make Ash Slurry Pumps |
7 | Dismantling & shifting of Coarse Ash Pump from its foundation to maintenance bay. |
8 | Shifting of Overhauled/New Coarse Ash Pump from maintenance bay to the foundation of Pump. |
9 | Complete overhauling of ‘M/s Indure’ make Coarse Ash Pump |
10 | Dismantling & Shifting of Vacuum Pumps from its foundation to maintenance bay. |
11 | Shifting of Overhauled/ New VacuumPumps from maintenance bay tothe foundation of the pump: |
12 | Providing manpower assistance for Overhauling of VacuumPumps in presence of OEM TA (Make: M/s Kakati, KVL-600 ) |
13 | Providing manpower assistance for servicing of Instrument Air Compressor with drier in presence of OEM TA (Make : M/s Atlas Copco, Model:ZR145) |
14 | Providing manpower assistance for servicing of Transport Air Compressor in presence of OEM TA (Make : M/s Atlas Copco, Model:ZA6G250) |
15 | Complete overhauling of ESP fluidizing air blower(Make : SWAM Pneumatics, Model: RH-85 WC) |
16 | Complete overhauling of silo fluidizing air blower(Make : SWAM Pneumatics, Model:RHH-20WC ) |
17 | Complete overhauling of silo vent air fan (Type: centrifugal, Make: M/s Maxim air). |
18 | Complete overhauling/Servicing of HMDC installed at silo. |
19 | Complete overhauling/Servicing of rotary feeder installed in silo tank |
20 | Dismantling &Shifting of BALP/FWP/FAHP/ BAHP/ Eco.Pump/HMDC Pump from its foundation to maintenance bay. |
21 | Shifting of overhauled/new BALP/FWP/FAHP/ BAHP/Eco.Pump/HMDC Pump from maintenance bay to the foundation of the pump. |
22 | Overhauling of Flushing Water Pump (FWP) |
23 | Overhauling of Bottom Ash Low Pressure Pump (BALP) |
24 | Overhauling of Fly Ash High Pressure Pump (FAHP) |
25 | Overhauling of Bottom Ash High Pressure Pump (BAHP) |
26 | Overhauling of Economizer Pump |
27 | Overhauling of Hydro Mix Dust Conditioner Pump (HMDCP) |
28 | Overhauling of HP Seal Water Pump |
29 | Overhauling of LP Seal Water Pump |
30 | Overhauling of Bottom Ash Overflow Pump (BAOFP) |
31 | Overhauling of Recycle Water Pump (RWP) |
32 | Overhauling of AHP Clarifier Sludge Pump |
33 | Overhauling of Alum, Lime andPoly ElectrolyteDosing Pump |
34 | Overhauling of Ash Water Recovery Pump |
35 | Overhauling of Recovery Pump Seal Water Pump |
36 | Overhauling of Drain Pumps installed at Ash Slurry pump house, Vacuum pump area,Silo area and Recovery clarifier area. |
37 | Overhauling of Bottom Ash Hopper Area Jet type Drain Pump |
38 | Providing manpower assistance for Overhauling of Fluidomat Make Fluid Coupling of Ash Slurry Pump in presence of OEM TA. |
39 | Providing manpower assistance for Overhauling of FluidomatMake Fluid Coupling ofCourse Ash Pump and Clinker Grinder drive assembly in presence of OEM TA. |
40 | Overhauling of New Allen berry worksMake Gear Box of Ash Slurry Pump |
41 | Overhauling of New Allen berry works Make Gear Box of Coarse Ash Pump and Clinker Grinder drive assembly. |
42 | Overhauling of Lube Oil Pump of Fluid Coupling of Ash Slurry Pump |
43 | Servicing of Oil cooler of Fluid Coupling of Ash Slurry Pump |
44 | Complete Servicing of Turbo driving system of Clarifier |
45 | Alignment of Ash Slurry Pump |
46 | Rotation ofAsh Slurry disposal lines (350 NB) |
47 | Rotation ofBottom ash discharge pipe line (200 NB) |
48 | Replacement of MS pipe line (Dia.250 NB to 350 NB) |
49 | Replacement of CI pipe line (Dia.200 NB to 250 NB) |