}

Bids Are Invited For Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room 1 - Carry Out The Following Refit Routines For Both Whr Plants. Materials And Spares Firm Supply.(I) Evaporator Shell To Be Cleaned, Gasket To Be Renewe, GOA-Goa

Department of Defence Production has published Bids Are Invited For Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room 1 - Carry Out The Following Refit Routines For Both Whr Plants. Materials And Spares Firm Supply.(I) Evaporator Shell To Be Cleaned, Gasket To Be Renewe. Submission Date for this Tender is 11-01-2022. Retaining Hardware Tenders in GOA Goa. Bidders can get complete Tender details and download the document.




Tender Notice

30466566
Corrigendum : Bids Are Invited For Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room 1 - Carry Out The Following Refit Routines For Both Whr Plants. Materials And Spares Firm Supply.(I) Evaporator Shell To Be Cleaned, Gasket To Be Renewe
Indian
Goa
GOA
11-01-2022

Tender Details

Bids Are Invited For Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room 1 - Carry Out The Following Refit Routines For Both Whr Plants. Materials And Spares Firm Supply.(I) Evaporator Shell To Be Cleaned, Gasket To Be Renewed And Leak Test To Be Carried Out.(Ii) Replace Valve Kit In Nc/No Solenoid Valve. Qty: 04 Nos.Replace Coil And Check Functioning Of Valves.(Iii) All Pressure Gauges (0-7 Bar: 08 Nos), Vacuum Gauge (0 To -30 Inches Of Hg: 02 Nos) To Be Calibrated. (Iv) Conductivity Meterto Be Calibrated And Provide Certificate.(V) Cleaning Of Demister.(Vi) Overhaul Distillate Pump (02 Nos), Feed Pump (02 Nos) And Sea Water Ejector Pumps (02 Nos). Renew Mechanical Seal And Pump Bearing. Spares Except Shaft, Impeller Firm Supply.(Vii) Open Condenser Cooling Tubes. Chemically Clean And Carry Out Pressure Test.(Viii) Open Heater Tubes, Chemically Clean And Pressure Test.(Ix) Check The Shell Safety Relief Valve For Proper Functioning.(X) Replace Orifice Plates In Sw/Fw Feed Lines.(Xi) Functional/Operational Checks And Proving The System For Designed Output.(Xii) Calibrate Salinometer For Proper Functioning.Spares – Cg Supply.Material – Firm Supply. , Whr Plant: Make: Techno Process, Type: 10 Tpd, Qty: 02, Location: Dgr & Gear Room - Open And Check The Ejector Nozzle For Blockage And Excessive Wear.Qty-02 Nos.Spares – Cg Supply.Material – Firm Supply. , Whr Plant (M/S Technoprocess) (Pac Firm – M/S Technoprocess) 1 - Overhaul 02 In No Whr Plant Motors 415 V, 3 Phase, 50Hz, 1.1Kw, (Make- Crompton Graves). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing, Painting Ofheat Resistive Paint On External/Internalpart Of Yoke, Apply Of Varnish And Baking Up 10 Hour. Recording Of Insulation, Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.(Maintenance Schedule No. Lp-44).Spares – Cg Supply Material – Firm , Whr Plant (M/S Technoprocess) (Pac Firm – M/S Technoprocess) - Overhaul02no.Whrmotorcontrolpanel.Overhaulingincludesservicingof Magnetic Contactor (3Th30-22E, Qty – 04 Nos), Control Transformer (410/230V, 150Va, Qty – 02 Nos),Calibration Of Over Load Relayrange, (2 – 3.2 A, Qty – 04Nos), Salinometer Probe Alongwith Salinometer Pcb (Qty – 02 Nos).System To Be Provedforsatisfactoryoperationoncompletionofoverhaulingwithmotor.Calibration Certificate With Limits To Be Handed Over To Ship.Spares – Cg Supply Material – Firm Calibration Certificate To Be Provide By Firm. Total Quantity : 1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Jan-2022 11-01-2022

Key Value

Document Fees
Refer document
EMD
INR 37500.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item TitleItem Description
1WHR PLANT: MAKE: TECHNO PROCESS, TYPE: 10 TPD, QTY: 02, LOCATION: DGR & GEAR ROOM 1Carry out the following refit routines for both WHR plants. Materials and spares Firm supply. (i) Evaporator shell to be cleaned, gasket to be renewed and leak test to be carried out. (ii) Replace valve kit in NC/NO solenoid valve. Qty: 04 Nos. Replace coil and check functioning of valves. (iii) All pressure gauges (0-7 bar: 08 Nos), vacuum gauge (0 to -30 inches of Hg: 02 Nos) to be calibrated. (iv) Conductivity meterto be calibrated and provide certificate. (v) Cleaning of Demister. (vi) Overhaul Distillate pump (02 nos), Feed pump (02 nos) and Sea water ejector pumps (02 nos). Renew mechanical seal and pump bearing. Spares except shaft, impeller Firm supply. (vii) Open condenser cooling tubes. Chemically clean and carry out pressure test. (viii) Open heater tubes, chemically clean and pressure test. (ix) Check the shell safety relief valve for proper functioning. (x) Replace orifice plates in SW/FW feed lines. (xi) Functional/operational checks and proving the system for designed output. (xii) Calibrate salinometer for proper functioning. Spares – CG supply. Material – firm supply.
2WHR PLANT: MAKE: TECHNO PROCESS, TYPE: 10 TPD, QTY: 02, LOCATION: DGR & GEAR ROOMOpen and check the ejector nozzle for blockage and excessive wear.Qty-02 nos. Spares – CG supply. Material – firm supply.
3WHR PLANT (M/S TECHNOPROCESS) (PAC FIRM – M/S TECHNOPROCESS) 1Overhaul 02 in no WHR Plant motors 415 V, 3 Phase, 50Hz, 1.1KW, (Make- Crompton Graves). Overhauling includes record of Insulation prior dismantling of motor and withdrawal of rotor, Renewal of DE/NDE ball bearing, painting ofheat resistive paint on External/Internalpart of Yoke, apply of varnish and baking up 10 hour. Recording of insulation, starting/running current and proving of motor for satisfactory operation on completion of overhauling. (Maintenance schedule no. LP-44). Spares – CG supply Material – firm
4WHR PLANT (M/S TECHNOPROCESS) (PAC FIRM – M/S TECHNOPROCESS)Overhaul02No.WHRmotorcontrolpanel.Overhaulingincludesservicingof Magnetic Contactor (3TH30-22E, Qty – 04 Nos), Control Transformer (410/230V, 150VA, Qty – 02 Nos),Calibration of Over load Relayrange, (2 – 3.2 A, Qty – 04 Nos), Salinometer probe alongwith Salinometer PCB (QTY – 02 Nos).System to be provedforsatisfactoryoperationoncompletionofoverhaulingwithmotor. Calibration certificate with limits to be handed over to Ship. Spares – CG supply Material – firm Calibration certificate to be provide by firm.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail