Ash Handling System Main Package Ash Handling System Main Package For 1X660 Mw Panki Thermal Power Station , Design, Engineering, Selection Of Equipment, Manufacturing, Supply , Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Transportation Including Customs Clearance / Port Clearance, Receipt And Unloading At Site, Storage And Security, Intra Site Handling, Final Painting At Site, Trial Run, Performance Guarantee Testing And Handing Over To End Customer Of The Following: , Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Enquiry Specification Which Broadly Consist Of Bottom Ash& Coarse Ash Evacuation System From Bottom Ash Hopper, Eco, Scr Inlet Hoppers, Scr Outlet , Aph, Duct, To Ash Slurry Sump And Further To Ash Dyke And Fly Ashevacuation System Fromesp Hoppers To Ash Silos ( Fae Towers Silos, Fa Silos ) , Compressed Air System, Instrument Air System, Air Receivers, Fluidizing Blower & Air Heater System, Hcsd System, Ash Water Recovery System, Hrscc Clarifier, Ash Water System, Drain Pumping System, Piping & Fittings ( Ash, Air, Water Application ) , Valves ( Ash, Air, Water Application ) , Eot Cranes, Electric & Manual Hoists, Vent Filters, Ash Weigh Bridges, Truckunloading Equipment, Air Conditioning, Ventilation, Ht & Lt Motors, Control & Instrumentation, Commissioning Spares, Structures ( Ish, Ash Pipe Rack, Platforms, Staircases And Other Secondary Structures As Per Scope Of Specification ) And Other Equipment / Items Meeting Requirement Of Enquiry Specification Etc. , Type Test Charges, As Per Contract Specifications , Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing, Transportation Including Including Customs Clearance / Port Clearance, Intra Site Handling , Receipt And Unloading At Site, Storage And Security And Handing Over To End Customer Of The Following: , Mandatory Spares As Per List Specified In The Specification. , Services , Operation And Maintenace Of Complete Ash Handling Plant Considering 3 Shifts Per Day ( Each Shift Of 8 Hrs ) As Per Specification , Erection And Commissioning For ( Sl. No. 1.1 Above ) Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Enquiry Specification. , Unloading, Transportation Inculding Intra Site Handling, Security, Erection & Commissioning And Painting ( Including Supply Of Required Paint ) Offree Issue Ash Slurry Pipe ( 400 Nb X9.5 Mm Thick ) , ( Optional ) ( The Optional Price Shall Be Valid Till End Of Contract And Shall Not Be Considered For Evaluation Of L1 Status ) , Recommended Spares: Recommended Spares Required For Initial 3 Years Of Operation. The List Of Spares With Individual Item Price Shall Be Indicated. , Shot Blasting: Shot Blasting Of Slurry Disposal Pipes Before Painting , Cif Content Included In The Quoted Price. ( Bidder To Note That This Price Is For Information Only And The Same Will Not Be Added For Arriving At The Grand Total Price For Evaluation. )