Supply Of Centrifugal Pumps ( Raw Water System ) Design, Engineering, Manufacture, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing At Manufacturers Works, Packing, Transporta, Iocl, Gujarat Refinery-Gujarat
TDR : 30441309
Tender Notice
Corrigendum Details
BOQ
Expired
Iocl, Gujarat Refinery
Gujarat
Corrigendum : Supply Of Centrifugal Pumps ( Raw Water System ) Design, Engineering, Manufacture, Procurement Of Materials And Bought Out Components, Assembly At Shop, Inspection Including Inspection By Tpia, Testing At Manufacturers Works, Packing, Transporta
Name of Work: Design, Engineering, Manufacturing, Procurement of Materials and Bought out Components, Assembly at Shop, Testing at Manufacturer\"s Works, Inspection by TPIA (Bidder to arrange TPIA including all TPIA charges), Packing, Supply of CENTRIFUGAL PUMPS as specified in the MR document, including Supply of all Mandatory spares, Commissioning Spares & Special Tools and Tackles (As Applicable), Painting, Packing and Preservation, Supervision at site, All Auxiliaries & Documentation as per the enclosed Standard Specifications, Job Specification, Data Sheets etc. and other Codes and Standards attached or referred in Material Requisition for LuPECH Project, Gujarat Refinery.
Sl. No.
Item Description
1
RAW WATER BOOSTER PUMPSCentrifugal pumps with Mechanical seal, seal flushing system, Bearing Lubrication & Cooling system if applicable, Coupling and No sparking coupling guard, Motor with Terminal Box, Motor Canopy, Motor protecting auxiliaries like space heater, RTDs, BTDs and their respective terminal boxes, common Base frame (with Drip Pan, Drain Nozzle pipe, flange and Blind Flange), Vent valve, Casing Drain connection ( with Pipe, Drain valve, flange and blind flange ), companion flanges if applicable.
2
Supervision at Site:
3
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 6 above) - Per diem charges for upto 8 hours work on normal working days
4
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
5
Supervision during Erection, start-up, site run testing, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.