Annual Maintenance Contract ( Amc ) ( 2021-22 ) For 60T Electronic Weighbridge At Phase-Ii And For 50T Electro-Mechanical Weighbridge At Phase-I, Fact-Cd, Ambalamedu., Ambalamedu-Kerala
TDR : 30413924
Tender Notice
Corrigendum Details
BOQ
Expired
Ambalamedu
Kerala
Corrigendum : Annual Maintenance Contract ( Amc ) ( 2021-22 ) For 60T Electronic Weighbridge At Phase-Ii And For 50T Electro-Mechanical Weighbridge At Phase-I, Fact-Cd, Ambalamedu.
Name of Work : Annual Maintenance Contract (AMC) (2021-22) for 60T Electronic Weighbridge at Phase-II & for 50T Electro-Mechanical Weighbridge at Phase-I, FACT-CD, Ambalamedu.
Sl. No.
Item Description
1
Annual Maintenance Contract (AMC) (2021-22) for 60T Electronic Weighbridge at Phase-II & for 50T Electro-Mechanical Weighbridge at Phase-I, FACT-CD, Ambalamedu.
2
CAMC for 60T Electronic Weigh Bridge PH-IIComprehensive Annual Maintenance and Service (AMC) for 60T Electronic weighbridge at Phase II CD.CAMC includes the following works:-Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weighbridge throughout the AMC period as per Annexure II –Special Terms and condition of the work.
3
LIFT UP/DOWN,L/D CELL R&R,P/F ALIGN, WBLifting-up& Descending down of the Weighbridge Platform for Inspection works/Refurbishment/ Painting etc.The work involves:-i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (upto 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT.ii) Removal of all Load cells (max 6 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box.iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments.iv) Performingcalibration check, corner test v) Checking/ ensuring normal functionality .After completion, the weighbridge should be handed –over to FACT for stamping.
4
L&C LMD STAMPING WB 60T PH-2, CDLiaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 60T weighbridge at phase-II.Contractor`s scope of work: (i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges. (ii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (iii) The contractor shall meet all the incidental expenses in connection with verification & stamping. (iv) All necessary tools & tackles required for the work. (v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-II area, Ambalamedu (60T). (vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: (i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
5
On-Call maintenance visit for 50T Electro-Mechanical Weighbridge PHI.The Job includes servicing of 50T Electro-Mechanical Weighbridge on demand/ or on breakdown as per Scope of Work and Terms & condition of this contract. as perAnnexure II –Special Terms and condition of the work
6
L&C LMD STAMPING WB 50T PH-I, CDLiaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 50T Electro Mechanical weighbridge at phase-I.Contractor`s scope of work: (vii) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges. (viii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (ix) The contractor shall meet all the incidental expenses in connection with verification & stamping. (x) All necessary tools & tackles required for the work. (xi) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electro Mechanical Weighbridge at Phase-I area, Ambalamedu (50T). (xii) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.