| 1 | Dismantling brick or stone masonary in lime or cement mortar below 10\" height including stacking the useful materials for reuse and removing the debris with 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. |
| 2 | Dismantling and removing RCC columns, beams, slab, staircase, landing, lintels including stacking the materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. |
| 3 | Earth work in excavation in foundation in ordinary soil within 50 mtr. initial lead and 1.5 mtr. initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and T&P for the work etc. complete and as directed by the Engineer-in-Charge. |
| 4 | Back filling in foundation & plinth with excavated earth including watering and ramming within 50 mtr. initial lead and 1.5 mtr. initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and T&P for the work etc. complete and as directed by the Engineer-in-Charge. |
| 5 | Supplying, filling in foundation and plinth with sand in 22.5 cm (9\") thick layers including watering and ramming with cost, conveyance, royalties, labour and labour cess with T&P required for the work etc complete as per the direction of the Engineer-in-charge. |
| 6 | Cement concrete of proportion (1:3:6) in foundation and floors using 4 cm (1.5\") size clean hard hand broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm (6\") thick to required level ramming, watering, curing etc. complete including cost and conveyance of all materials with royalties, labour, labour cess and T&P required for the work etc. complete including dewatering if required. |
| 7 | Cement concrete (1:2:4) using 12 mm size hard crusher broken granite chips of approved quality from approved quarry including all cost, labour, labour cess, T&P, royalties, conveyances etc. complete as per direction of the Engineer-in-charge. |
| 8 | R.C.C. work in Column base / footing of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 9 | R.C.C. work in Column super structure of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 10 | R.C.C. work in plinth Bend/Beam of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 11 | R.C.C. work in Lintel of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 12 | R.C.C. work in Roof beam of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 13 | R.C.C. work in Roof slab of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance ofM.S rods or Tor steel and bindingwire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel andbinding wire tying the grills and placingin proper position. |
| 14 | Straightening bent up or coiled rods (HYSD) cutting, bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for RCC works and for providing cost, conveyance of M.S. rod or Tor steel and binding wires of 18 to 20 gauge and labour, labour cess with T & P required for the work etc complete in all floors (Weight of binding wires and lapping & wastage of rod will not be considered for payment and payment will be made on weight of actual length of M.S. rods or Tor steel only.) |
| 15 | 2.5 cm thick grading concrete (1:2:2:) on roof slabwith 6 mm size hard crusher broken granite chips including all cost, conveyance and royalties of materials with labour, labour cess and T&P required for the work etc. complete as per direction of Engineer-in-charge. |
| 16 | Fly ash brick masonry in cement mortar (1:6) after immersing bricks for six hours in water before use in Foundation and plinth using fly ash bricks of 9\" size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cesswith T&P required for the work with all royalties etc. complete in all respect. |
| 17 | Fly ash brick masonry in cement mortar (1:6) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 9\" size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cesswith T&P required for the work with all royalties etc. complete in all respect. |
| 18 | Supplying of M.S Panneled Door double leaved with M.S. frames (35x35x6 mm M.S. Angle), top and bottom rail (25x25x3 mm M.S. Angle), door pannel with 1.00 C.R. sheet, pannel stiffner covering width of each leaf 19 x 5 mm, M.S.flat 3 Nos. on each leaf, hinges 6 nos of size 100 mm (3 nos. on each side) bought out as per ISS. Hold fast 3 nos on each side of 35 x 35 x 6 mm M.S. Angle 175 mm length bifurcated at the tip, with 4 nos fabricated Handle (19x5 mm M.S. Flat), 2 nos Aldrop bought out as per ISS & 2 nos Tower bolts as per approved design & direction of Engineer-in-charge, including cost, conveyance, labour cess and labour charges of all materials etc. complete. |
| 19 | Supplying of M.S. Window grill / M.S. Fixed Grill / M.S. grill gate made out of M.S. angle, M.S. flat & M.S. square etc including cutting, welding, all labour, labour cess and T&P etc complete as per direction of Engineer-in-charge |
| 20 | Labour charges for fitting and fixing of M.S. Door, Window, Fixed Grill & Gate, Rolling shutter etc. in proper position including making holes in walls, RCC structures and wood work etc. and making good to the damages to walls or RCC structure including mending or cutting to sizes or grooves in walls and fixing with RCC (1:2:4) with HB granite chips of 12mm size with cost and conveyance of all materials, royalties, labour, labour cess and T&P required for the work etc. complete as per direction of the Engineer-in-charge. |
| 21 | Providing & fixing of Granite Tiles above 0.40 sqm. of 20 mm thick in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with colouring pigments to match the sheds of the tiles including cost of Granite tiles, all materials, labour, labour cess, royality, conveyance, T&P etc. complete as directed by the Engineer-in-charge. |
| 22 | Providing and fixing Granite tiles up to 0.10 Sqm. Of 10 mm thick in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost of Granite tiles, all labour, labour cess as directed by the Engineer-in-charge. |
| 23 | Supplying, fitting and fixing of Industrial Vitrified tile of premium grade having thickness 8mm to 10mm of size 300mm x 300mm of plain (Ivory) in approved make conforming to IS 4457 laid on 20mm thick cement mortar (1:4) (1 cement : 4 course sand)and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all completeas per direction of the Engineer-in-charge. |
| 24 | 16 mm thick cement plaster of proportion (1:6) finished smooth to inside brick work after racking out joints including watering and curing, cost, conveyance, royalities of all materials with all labour, labour cess and T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. |
| 25 | 12 mm thick cement plaster (1:6) finished smooth to outside brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour, labour cess with T&P required for the work with all royalties etc. complete in all respect as per direction of the Engineer-in-charge. |
| 26 | 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including close deep chipping and slurry treatment including watering and curing with cost and conveyance of all materials and labour, labour cess with T&P required for the work with all royalties etc. complete in all respect as per direction of the Engineer-in-charge. |
| 27 | Priming with any approved primer to new iron work including cost of the primer sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. |
| 28 | Painting two coats with any approved paint to new iron work including cost of the paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. |
| 29 | Priming wall surface with water based cement primer with approved water base cement primer on new work to receive painting after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. |
| 30 | Distempering two coats to wall surface with any approved Distemper paint of approved shade to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. |
| 31 | Wall Painting two coats with any approved weather coat paint of approved shade on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. |