| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1 m girth on pre-measurement.materials and stacking of serviciable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness including cess etc. complete as perdirection of the Engineer-in-charge. |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel & moorum etc. inter spread with boulders up to 1/2 cum size with all lifts & delifts including trimming of slopes & bed to design section & depositing the excavated materials away of work site including spreading, leveling the earth by mechanical means including hire & running charges of all machineries, T& P, cess etc. complete as per direction of the Engineer-in charge within an initial lead of 1.00km from the place of excavation complete. (Measurement will be recorded in level section only) |
| 3 | Fine dressing and turfing with one extra lead over initial lead of 50 m&initial lift 1.5m with cess etc complete as per direction of the Engineer-in-charge. |
| 4 | Excavation offoundation in all kinds of soil including dressing and leveling the bed andsides of foundation and disposal of the excavated materials with all leads, lifts and delfts & breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.30m in depth including dewatering, shoring and shuttering including cess etc. complete as perdirection of the Engineer-in-charge. |
| 5 | Reinforced Cement concrete M- 25 grade with crushed hard granite coarse aggregate 20mm downgraded of approved quality for R.C.C work mixing by concrete mixer & placing manually including all leads, lifts, & delifts compacting with vibrator including cost, conveyance, royalty, loading & unloading of all materials including curing, cess etc. complete as per direction of Engineer-in-charge. |
| 6 | Brick Masonry with KB bricks 23cm X 11 cm X 8 cm size having crushing strength not less than 75 Kg/Sq. cm with dimensional tolerance +/- 8 % in cement mortar (1:4) in foundation and plinth per Cum including cost, conveyance, royalty, loading & unloading of all materials including curing, cess etc. complete as per direction of Engineer-in-charge. |
| 7 | 12 mm thick cement plaster (1:3) on brick work per 1 sqm including cost, conveyance, royalty, loading & unloading of all materials including curing, cess etc. complete as per direction of Engineer-in-charge. |
| 8 | Supplying ,fitting including straightening, cutting, bending & binding the M.S/Tor reinforcement for R.C.C work and tying the grills and placing in position including cost, conveyance of MS /Tor rod and binding wire 18 to 20 gauge, loading, unloading including cess etc. complete as per direction of Engineer-in-Charge. |
| 9 | Cast-in-situ 940 mm dia Double under reamed RCC piles with 375 mm dia circular piles with R.C.C M-25grade with crushed hard granite coarse aggregate 20mm downgraded of approved quality for R.C.C workmixing by concrete mixer & placing manually including all leads, lifts, & delfts compacting with vibrator including cost, conveyance, royalty, loading & unloading of all materials including curing, cess etc and including cost of bore holes but excluding cost of MS rod /Tor rod and labour charges cutting, bending and binding of steel as directed by the Engineer in charge. |
| 10 | Providing rigid centering andshuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs barrages and dam block including cost of all materials, labour , T&P, cess etc complete as directed by the Engineer-in-charge. |
| 11 | Finishing wall surface of walls with Acrylic wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of all materials, labour , T&P, cess etc complete as directed by the Engineer-in-charge. |
| 12 | Distempering two coats to walls with distemper of approved shade on new work to give even shadeincluding cost of all materials, labour , T&P, cess etc complete as directed by the Engineer-in-charge. |
| 13 | 2.5 cm thick A.S. Flooring with Cement Concrete (1:2:4) including punning using 12 mm size hard granite crusher broken chips including cost of all materials, labour , T&P, cess etc complete as directed by the Engineer-in-charge. |
| 14 | 2.5 cm grading concrete (1:2:2) on roof slab with 6mm size hard granite crusher broken chips on new work including cost of all materials, labour , T&P, cess etc complete as directed by the Engineer-in-charge. |
| 15 | Filling in foundation & plinth with excavated materials conveying with all leads, lifts & delfts & well watered and rammed in foundation trench with cess etc complete as per direction of the Engineer-in-charge. |