Malabar Cements Limited has published Construction Of Civil Structures, Fabrication And Erection Of ( Peb ) Steel Structures For Raw Materials Storage Shed Including Both Civil And Structural Work At Walayar Plant Construction Of Civil Structures, Fabrication And Erection Of ( Peb ) Ste. Submission Date for this Tender is 06-01-2022. Shed Construction Tenders in MALABAR CEMENTS LTD, WALAYAR Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-Dec-2021 | DUE DATE EXTENSION | Date | 06-01-2022 |
Sl. No. | Item Description |
1 | Description of work |
2 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift upto 1.5 m : |
3 | Earth work in excavation in all kinds of soil by mechanical means Hydraulic excavator/ manual means in foundation trenches or drain ( not exceeding 1.5m in width or 10 Sq.m on plan)including dressing of sidesand ramming of bottom, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50 m. |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth : consolidating each deposited layer by ramming and watering lead upto 50mm and lift upto 1.5m |
5 | Providing and laying in position cement concrete of specified grade(M20) excluding the cost of centering and shuttering, finishing and reinforcement - All work upto plinth level (Excluding the cost of cement) |
6 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work upto plinth level (PCC 1:4:8 -1cement : 4 coarse sand : 8 graded stone aggregate40 mm nominal size ) |
7 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge -RCC up to Plinth Level. (Excluding the cost of cement) |
8 | Steel reinforcement (Approved brand by MCL)for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. With ThermoMechanically treated bars |
9 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge-RCC above Plinth Level. (Excluding the cost of cement) |
10 | Steel reinforcement (Approved brand by MCL) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. With ThermoMechanically treated bars |
11 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete |
12 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
13 | Centering and shuttering of Walls (any thickness) including attached pilasters, butteresses, |
14 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers |
15 | Painting(With Approved brand by MCL) of steel structures with synthetic enamel paint of approved brand and manufacture to give an even shade- Two or more coats on new surface. |
16 | Structural steel work (with Approved brand by MCL) riveted, bolted or welded in built up sections,trusses, PEB steel structure, purlins with cold formed light guage steel sections and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete, as per the appoved drawing of MCL. |
17 | DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Engineer at site. |
18 | Supplying and fixing Galvalume roofing sheet (22 gauge -with Approved brand by MCL) withnecessary hooks, bolts and nuts etc as per manufactures specification and directions of engineer -in - charge. |
19 | Providing and fixing Poly-carbonatesheets of4mm thick necessary hooks, bolts and nuts etc. as directed by the Engineer - in - charge. |
20 | Providing ridges or hips of 1.2m over all width withnecessary hooks, bolts and nuts etc as per manufactures specification and directions of engineer -in - charge. |
21 | Rock anchoring of foundation using 16mm dia bars. Mininum anchorage length 60cm from GL as per approved drawing by MCL |