Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project , Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works:Residual Proces, Nagapattinam-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project , Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works:Residual Proces. Submission Date for this Tender is 28-03-2022. Chemical Supply Tenders in Nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

30107720
Corrigendum : Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project , Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works:Residual Proces
Open Tender
Indian
Tamil Nadu
Nagapattinam
28-03-2022

Tender Details

Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project Delayed Coker Unit (Dcu) Of Epcm-2 Package For Cbr Project , Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works:Residual Process Design, Updation Of Feed Package, Detailed Design And Engineering, 3D Modeling, Hazop/Hazid, Sil , Preparation And Submission Of Engineering Drawings & Related Documentation Including Asbuilt/ Final Documentation Providing All Services And Completing The Work In All Respects As Per Provision Of Bidding Document.Supply Of All Materials Including - Procurement Services, Shop Fabrication, Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight / Air Freight And Inland Freight, Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc., Supply Of Start- Up / Pre-Commissioning / Commissioning / Mandatory Spares,Catalyst /Chemicals (Except Licensor Supplied Catalyst /Chemicals).Construction / Erection Including Loading/Unloading Of The Materials At Contractor’S Warehouse, Transportation Of The Materials From Contractor’S Workshop / Store To Erection Site, Assembly / Sub-Assembly Of The Equipments, Erection, Installation, Testing, Inspection, Pre-Commissioning / Commissioning & Pgtr, Handing Over To Owner Inlcluding All Disciplines Of Work And Supplly Of Material As Per Tender Requirements Such As Structural, Civil, Mechanical, Piping, Electrical, Instrumentation, Insulation, Painting, Supply Of All Accessories And Materials For Erection / Testing; Supply Of All Consumables, Providing All Construction Plants, Equipments, Special Tools And Tackles; Providing Supervisory Personnel, Tradesman Skilled / Unskilled Labour; Insurance In Contractor’S Scope; Completing All Works In All Respects As Per Provisions Of Bidding Document.• Completion Of All Works In All Respects As Per Provisions Of The Bidding Document And Directions Of The Engineer-In-Charge, Including Any Other Activity Of Work Required To Complete The Plant In All Respects To Make The Plant Functional. , Foreign Currency Part , Indian Currency Part

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 23-Dec-2021 Technical Amendment No-1 Technical Bid 31-01-2022
2 15-Jan-2022 Technical Amendment No-2 Technical Bid 31-01-2022
3 21-Jan-2022 Bid Due Date Extension -01 Date 28-02-2022
4 21-Jan-2022 Pre bid Queries/Replies (Commercial) Other 28-02-2022
5 21-Jan-2022 Pre bid Queries/Replies (Technical) Other 28-02-2022
6 29-Jan-2022 Commercial Amendment No-2 Other 28-02-2022
7 29-Jan-2022 Commercial Amendment No-2 BOQ 28-02-2022
8 01-Feb-2022 Technical Amendment No-4 Technical Bid 28-02-2022
9 01-Feb-2022 Technical Amendment No-3 Technical Bid 28-02-2022
10 18-Feb-2022 Commercial Amendment No-4 Other 14-03-2022
11 18-Feb-2022 Technical Amendment No-5 Technical Bid 14-03-2022
12 18-Feb-2022 Commercial Amendment No-3 Date 14-03-2022
13 21-Feb-2022 Technical Amendment No-6 Technical Bid 14-03-2022
14 28-Feb-2022 Commercial Amendment No-5 Other 14-03-2022
15 28-Feb-2022 Technical Amendment No-7 Technical Bid 14-03-2022
16 14-Mar-2022 Commercial Amendment No-6 Date 28-03-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Delayed Coker Unit (DCU) of CPCL 9 MMTPA CBR Project
Sl. No. Item Description
1LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, updation of FEED Package, Detailed Design and Engineering, 3D Modeling, Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start- up / pre-commissioning / commissioning / mandatory spares,catalyst /chemicals (Except Licensor supplied catalyst /chemicals). Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, pre-commissioning / commissioning & PGTR, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. • Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional.
2FOREIGN CURRENCY PART
3INDIAN CURRENCY PART
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail