| 1 | Earthworkin excavationof foundationtrenches or drains,in all sorts of soil (includingmixed soil but excluding laterite or sandstone) including removing,spreadingor stackingthe spoils within a leadof75m.asdirected.Theitemincludes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavationnot exceeding1,500 mm. |
| 2 | Filling in foundationor plinth by silver sand in layers not exceeding 150 mm as directed and consolidatingthesamebythorough saturation with water,rammingcompleteincludingthe cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 3 | Earthworkinfillinginfoundation trenches or plinthwithgoodearth,inlayersnotexceeding 150mm.including watering andramming etc. layer by layer complete.(Paymentto be made on the basisof measurement of finishedquantityof work) With earth obtained from excavation of foundation. |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints withlocal sand. |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement,if any, in ground floor In ground floor and foundation.floor |
| 6 | Brick work with 1st class bricks in cement mortar (1:6)In foundation and plinth. |
| 7 | Brick work with 1st class bricks in cement mortar (1:4)cement mortar (1:4) (b) In superstructure, ground floor |
| 8 | 125mm.thickbrickworkwith1stclass bricks in cement mortar (1:4) in ground floor. |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excludingshutteringandreinforcementif any, in ground floor as per relevant IS codes with Pakur Variety Stone chips |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Tor steel/Mild Steel ; Brand - SAIL / TATA/ RINL |
| 11 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. |
| 12 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals) with local salwood |
| 13 | Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor. 40mm thick shutters with 19mm thick panel of size 30 to 45 Cm. with Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak. |
| 14 | Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately)40mm X 6mm, 200mm Length |
| 15 | Anodised aluminium butt hinges of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 205/66) and fitted and fixed with cadmium plated screws: 150 x 75 x 4.0mm. |
| 16 | Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws: 150mm long x 12mm dia. bolt. |
| 17 | Artificial stone in floor withcementconcrete(1:2:4)withstone chips, laid in panels as directed with topping made with ordinary cement (as necessary) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.3 mm. thick topping Using grey cement 35 mm. thick |
| 18 | M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) Grill weighing above 16 Kg./sq. mtr. |
| 19 | Priming one coat on timber or plastered surfacewithsyntheticoilboundprimer of approved quality including smoothening surfaces by sand papering etc. |
| 20 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On timber or plastered surface : With super gloss (hi-gloss) - Two coats (with any shade except white) |
| 21 | White washing including cleaning and smoothening surface thoroughly. Three coats (on new works only). |
| 22 | Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer\"s specification. Three Coats. |
| 23 | 20 mm thick plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamferingcornersasdirectedandraking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Groundfloor). [Excluding costofchipping over concrete surface] With 1:4 cement mortar. |
| 24 | 15 mm thick plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamferingcornersasdirectedandraking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Groundfloor).[Excluding costofchipping over concrete surface] With 1:4 cement mortar. |
| 25 | 10 mm thick plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamferingcornersasdirectedandraking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Groundfloor).[Excluding costofchipping over concrete surface] With 1:4 cement mortar. |
| 26 | Neat cement punning about 1.5mmthick in wall,dado,window sill,floor etc. NOTE: Cement 0.152 cu.m per100 sq.m. |
| 27 | Supplying, fitting & fixing UPVC pipes A- Type conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete: UPVC Pipes 75mm. dia. |
| 28 | Add : GST (CGST + SGST) @ 12% |
| 29 | Add : Cess @ 1% |
| 30 | cost of another unit |