Orissa Power Transmission Corporation Limited-OPTCL has published Renovation Of Control Room Builidng At 220 / 132 / 33 Kv Grid Ss At Pattamundai Renovation Of Control Room Builidng At 220 / 132 / 33 Kv Grid S / S At Pattamundai ( Providing Inside And Outside Reparing, Armstrong False Ceiling, Ms Grills, Al. Powder. Submission Date for this Tender is 13-12-2021. Building Work Tenders in Pattamundai Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplying all labour for dismantling 2.5 cm thick Grading concrete from roof slab including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
2 | GROUND FLOOR |
3 | FIRST FLOOR |
4 | Supplying all labour for removal of cement plaster including racking out joints 12 mm deep and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
5 | GROUND FLOOR |
6 | FIRST FLOOR |
7 | Supplying all labour for closed deep chipping etc complte including cost, conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in Chage. |
8 | GROUND FLOOR |
9 | FIRST FLOOR |
10 | Supplying all labour for dismantling marble chips dado from walls including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
11 | GROUND FLOOR |
12 | FIRST FLOOR |
13 | Supplying all labour for dismantling old tiled flooring including removing the base course including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
14 | GROUND FLOOR |
15 | FIRST FLOOR |
16 | Supplying all labour for dismantling old tile cladding from wall including racking out joints 12mm deep including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
17 | GROUND FLOOR |
18 | FIRST FLOOR |
19 | Supplying all labour for dismantling doors and windows including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
20 | GROUND FLOOR |
21 | FIRST FLOOR |
22 | Supplying all labour for dismantling false ceiling including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
23 | RCC M20 grade in Chajja (0.0635 thick)having a minimum compressive strength 20 N/mm2( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 using 12 mm to 20 mm size hard black crusher broken granite stone chips (20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days including centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in - charge. |
24 | Supplying,fitting,fixing, and placing uncoated HYSD Bar reinforecement including straightening ,cutting,bending, binding by using binding wire of18-20 gauze , molding, welding, jointing if necessary and placing in position as per drawing & technical specification( Payment shall be made on weight of M.S. Rod & Tor steel only and no separate payment will be made towards the weight of binding wires) including cost,conveyance, royalties and taxes of all materials and cost, conveyance,taxes of all labourT & P required etc complete as per direction of Engineer in charge. |
25 | 20 mm thick cement plaster with cement and sand mortar (1:4 ) with one coat primer of sika Latex and Sik liquid for mixing in cement finished smooth on masonary workwith wateringand curing including cost, conveyance, royalties and taxes of all materials and cost, conveyance of all labour with T&P required for the work etc complete in all respect s as per the direction of the Engineer in charge. |
26 | GROUND FLOOR |
27 | FIRST FLOOR |
28 | 16 mm thick cement plaster with cement and sand mortar (1:6 ) with one coat primer of sika Latex and Sik liquid for mixing in cement finished smooth over out side rough surfaces of brick masonry walls etc with wateringand curing including cost, conveyance, royalties and taxes of all materials and cost, conveyance of all labour with T&P required for the work etc complete in all respect s as per the direction of the Engineer in charge. |
29 | GROUND FLOOR |
30 | FIRST FLOOR |
31 | 12 mm thick cement plaster with cement and sand mortar (1:6 ) with one coat primer of sika Latex and Sik liquid for mixing in cement finished smooth over inside rough surfaces of brick masonry walls etc with wateringand curing including cost, conveyance, royalties and taxes of all materials and cost, conveyance of all labour with T&P required for the work etc complete in all respect s as per the direction of the Engineer in charge. |
32 | GROUND FLOOR |
33 | FIRST FLOOR |
34 | 4 cm thick grading concrete(1:2:4) with chicken mesh on roof slab using 12 mm using water proofing treatment for roof with construction chemicals including two coats of chemical paiting with SBR Latex modified in ratio (1:2:2)and down blackhard crusher broken granite stone chips of approved quality from approved quarry including lowerlaying concretewatering and curing etc complete to required level including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour including cost of water proof compound with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. |
35 | GROUND FLOOR |
36 | FIRST FLOOR |
37 | Cement concrete with (1:1.5:3) inusing 12 mmsize blackhard crusher broken granite stone chips of approved quality from approved quarry including lowerlaying concretewatering and curing etc completeincluding cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. (for minor repair works only) |
38 | GROUND FLOOR |
39 | FIRST FLOOR |
40 | Providing for supplying, fitting and fixing Vitrified tile in floors ofsize 600mm x 600mm coloured / printed series (Homogeneous) of approved make conforming to IS : 13755 with application of polymer modified quick set cement based water resistant adhesive conforming to IS 15477 of 3mm thick bed and filling joints with white cement of approved quality including cost conveyance taxes of all materials and cost conveyance of all labour with T&P etc. complete in all floors in all respects as per direction of Engineer-in-Charge. (for repair works only) |
41 | GROUND FLOOR |
42 | FIRST FLOOR |
43 | Providing fitting, laying and fixing of approved quality Vitrified tile of coloured / printed series (Homogeneous) of approved make conforming to IS : 13755 laid on vertical faces of walls,dados skirting and risers of steps using 12mm thick cement and sand mortar in (1:3) and joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,watering and curing etc including cost conveyance taxes of all materials and cost, conveyance,taxes of all labour with T&P required etc. complete in all respects as per direction of Engineer-in-Charge. |
44 | GROUND FLOOR |
45 | FIRST FLOOR |
46 | Providing for supplying, fitting and fixing of Antiskid Ceramic tile in floors of size 30Cm. X 30cm. / 40cm.x 40cm. Special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755 laid on 20mm thick cement mortar (1:4) (1 cement and 4 coarse sand) and filling joints with white cement of approved quality including cost conveyance taxes of all materials and cost conveyance of all labour with T&P etc. complete in all floors in all respects as per direction of Engineer-in-Charge. (for new work only) |
47 | GROUND FLOOR |
48 | FIRST FLOOR |
49 | Providing fitting, laying and fixing of approved quality Ceramic walltile 20Cm. X 30cm. / 20cm.x 20cm. Special plain/printed series ceramic walltiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 laid on vertical faces of walls,dados skirting and risers of steps using 12mm thick cement and sand mortar in (1:3) and joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing,watering and curing etc including cost conveyance taxes of all materials and cost, conveyance,taxes of all labour with T&P required etc. complete in all respects as per direction of Engineer-in-Charge. |
50 | GROUND FLOOR |
51 | FIRST FLOOR |
52 | Providing for supplying, fitting and fixing Antiskid Ceramic tile in floors of size 30Cm. X 30cm. / 40cm.x 40cm. Special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755with application of polymer modified quick set cement based water resistant adhesive conforming to IS 15477 of 3mm thick bed and filling joints with white cement of approved quality including cost conveyance taxes of all materials and cost conveyance of all labour with T&P etc. complete in all floors in all respects as per direction of Engineer-in-Charge. (for repair works only) |
53 | GROUND FLOOR |
54 | FIRST FLOOR |
55 | Providing, supplying, fitting and fixing of M.S.grill gate, made out of M.S. flat and M.S. angle , M.S. square bar conforming to IS 1977/ 1975 of approved design and drawing (design and drawing to besupplied from the Engineer in charge) including drilling holes in framesetc supplying required size of M.S. screws and cutting grooves or beads where necessary including cost, conveyance, and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per direction of the Engineer in charge. |
56 | GROUND FLOOR |
57 | FIRST FLOOR |
58 | Providing,fitting and fixing up window (sliding type) made up powder coated aluminum section 9778 as window frame, section on 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick plain glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P excluding cost of glass etc complete as per direction of Engineer in charge |
59 | GROUND FLOOR |
60 | FIRST FLOOR |
61 | Providing,fitting and fixing of Al. powder coated Door with 6mm plain glass in top portion with 6mm thick black glass bottom portion with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section no 9221 and tapered clop No. 4660 and the frame to be completed by means of jointing angle No. 1855, etccomplete including cost, conveyance royalties and taxes of all materials and cost,taxes of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge(With door closure) |
62 | GROUND FLOOR |
63 | FIRST FLOOR |
64 | Providing,fitting and fixing of Al. Door with 6mm plain glass in top portion with 12mm thick pre-laminated board in bottom portion with anodized Al. door section (powder coated) of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section no 9221 and tapered clop No. 4660 and the frame to be completed by means of jointing angle No. 1855, etccomplete including cost, conveyance royalties and taxes of all materials and cost,taxes of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge(With door closure) |
65 | FIRST FLOOR |
66 | Supplying fitting fixing of FRP Chowkatha of approved quality and diension including watering, curing etc complete including cost, conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in Chage. |
67 | Supplying fitting fixing of FRP door of approved quality and diension including watering, curing etc complete including cost, conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in Chage. |
68 | Providing,fitting and fixing up partition walling OEL aluminium anodised section no. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as tapered clip for fixing up 12mm thick prelaminated board and jointing angle No. 1855 etc. etccomplete including cost, conveyance royalties and taxes of all materials and cost,taxes of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. |
69 | Providing, fitting & fixing of false ceiling with Arm strong silhouette main runner, cross tee, wall angle with fine fissured RH-99 board on 4 walls to be fixed by means of steel screw, PVC plug & the Arm strong grid 2"0"x2"0" suspended from ceiling etc. completeincluding cost, conveyance royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. |
70 | Supplying fitting fixing testing and commissioning of Rccess mounted luminaries of CROMPTON make LED ceiling light fitting (model no. ORION-1, LCTLR-50-FO-CDL) including wiring including cost taxes of all labour and material with T&P required etc complete in all respect as per direction of the Engineer in charge. |
71 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mmx32mmx2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour T&P etc. required for the complete in all respect |
72 | Priming one coat with of approved quality of primer of Berger make including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & Prequiredetc complete in all respect as per the direction of the Eng.-in-charge |
73 | GROUND FLOOR |
74 | FIRST FLOOR |
75 | Finishing surface of walls with Cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour etc complete as per the direction of the Engineer in charge. |
76 | GROUND FLOOR |
77 | FIRST FLOOR |
78 | Wall paintingtwo coats with a plastic emulsion paint of approved shadeover wall surface finished smooth to give an even shade including watering,curing etc complete including cost,conveyance,taxes of all materials and cost,conveyance,taxes of alllabour with T&P required etc complete in all respects as per the direction of Eng.-in-charge. |
79 | GROUND FLOOR |
80 | FIRST FLOOR |
81 | Wall paintingtwo coats with weather shield coat of approved shadeover wall surface finished smooth to give an even shade including watering,curing etc complete including cost,conveyance,taxes of all materials and cost,conveyance,taxes of alllabour with T&P required etc complete in all respects as per the direction of Eng.-in-charge. |
82 | GROUND FLOOR |
83 | FIRST FLOOR |
84 | Painting one coats with blackpaints to dadooes with a paint of approved shade including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & Prequiredetc complete in all respect as per the direction of the Eng.-in-charge |
85 | Priming one coat with of approved quality of primer to iron works of Berger make including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & Prequiredetc complete in all respect as per the direction of the Eng.-in-charge |
86 | GROUND FLOOR |
87 | FIRST FLOOR |
88 | Painting two coats with synthetic enamel paints to iron / wooden doors and windos with a paint of approved shade including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & Prequiredetc complete in all respect as per the direction of the Eng.-in-charge |
89 | GROUND FLOOR |
90 | FIRST FLOOR |
91 | Supplying all labour with T&P required for fitting and fixing of followingPH items with all required fittings as per P.H. specificationincluding cost, conveyance, taxes of all material & cost,conveyance,taxes of all labour with T&P required etc complete in all respect as per direction of EIC. |
92 | 1 1/2" (40mm) dia UPVC Pipe (laying in trenches) including all fittings |
93 | 1" (25mm) dia UPVC Pipe (open wiring) including all fittings |
94 | 3/4" (20mm) dia UPVC Pipe (Concealed wiring) including all fittings |
95 | 4" PVC Pipe (Open wiring) |
96 | 4" PVC Pipe (Below GL) |
97 | 4" PVC Cowl |
98 | 4" PVC Pipe clip |
99 | 4" PVC Door Tee |
100 | 4" PVC P Trap |
101 | 4" Plain Bend |
102 | 4" PVC Door Bend |
103 | 3/4"pipe open wiring |
104 | Wash hand basin |
105 | Orissa Pan |
106 | PVC Pipe clip |
107 | 32mmx450mm long PVC Waste pipe |
108 | 32mm PVC Flush bend |
109 | 15mmx450mm PVC connection pipe |
110 | 10 Ltr PVC Low Level Cistern |
111 | 1/2" (15mm) CP Pillar cock |
112 | 1/2" (15mm) CP Bib cock |
113 | 1/2" (15mm) CP Concealed stop cock |
114 | 1/2" (15mm) CP Angle stop cock |
115 | CP Towel Ring |
116 | CP Towel Rail 20mm dia 450mm long |
117 | 1 1/2" (40mm) Brass/GM F.W.V |
118 | 1" (25mm) Brass/GM F.W.V |
119 | 125mm CP Grating |
120 | 24"x5" CP Glass Shelf with Glass |
121 | CP Soap Holder |
122 | 24"x18" mirror with hard board and screw |
123 | Shower Rose with arm |
124 | EWC pan with cover |
125 | Squatting urinal |
126 | Pedestal for basin |
127 | Gents urinal |
128 | Supplying all materils, all labour with T&P, all accessories and equipments for providing construction of Manhole Chamber in Sewerage system of size (3"0" x 3"0" x 3"0") including cost,conveyance,taxes of all materials and cost,conveyance,taxes of alllabour with T&P required etc complete in all respect as per PH specification and direction of Engineer in Charge |
129 | Supplying all materils, all labour with T&P, all accessories and equipments for providing construction of Inspection chamber in Sewerage system of size (2"6" x 2"6" x 1"6") including cost,conveyance,taxes of all materials and cost,conveyance,taxes of alllabour with T&P required etc complete in all respect as per PH specification and direction of Engineer in Charge |
130 | Providing,fitting and refixing of window (sliding type) after removing the old window and refixing the same after necessary repair including cost of fitting and fixtures but excluding Al section and Glass i including cost of materials all taxes labour, T&P excluding cost of glass etc complete as per direction of Engineer in charge |
131 | GROUND FLOOR |
132 | FIRST FLOOR |
133 | Supplying all labour with t & P required for removal of excess earth by mechanical means up to a distance of 5 KM including cost taxes of all labour with T & P required etc complete in all respect as per direction of EIC. |
134 | Supplying all labour for removal of cement plaster including racking out joints 12 mm deep and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
135 | GROUND FLOOR |
136 | FIRST FLOOR |
137 | Supplying all labour for providing pressure grouting for strengthening of column and beam by using 12mm drill will be done 300mm C/C to the concrete upto suitable depth or half of the depth of concrete & 12mm nozzle will be fixed with quick set mortar perma recrete. Injection pressure grouting in nozzle will be done in concrete surface with Perma Epoxy 100 EG (Low viscosity Epoxy grouting system). After injection grouting all nozzles will be cut or removaed & filled with Perma polycrete HDincluding cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy