| 1 | Providing 300mm dia4.5m long Double under reamed pile foundation with R.C.C. M-20 using 20 mm and down graded c.b. chips including cost of all materials labour etc. complete(but exccluding cost of reinforcement). |
| 2 | R.C.C. work M-20gradeusing 12mm. & down grade hard granite C.B. chipsincluding watering, lowering laying concrete, compacting with vibrators, curing etc complete Pile Cap |
| 3 | Grade Beam |
| 4 | Column |
| 5 | Sill bend |
| 6 | Lintel |
| 7 | Chajja |
| 8 | Shelves |
| 9 | Wall Beam |
| 10 | Roof slab |
| 11 | Supplying Cutting,bending un- coated HYSD bars,forreinforcementtying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills |
| 12 | Fly-ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinthincludingall cost, carriageetc. complete. |
| 13 | Fly-ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in superstructureincludingall cost, carriageetc. complete. |
| 14 | Supplying and filling foundation and plinth with sandwatered and rammed including cost of all materials andlabouretc. complete |
| 15 | Earth Work in hard soil in excavation of foundation renches within 50 meter initial lead and 1.5mt. Intial lift including rough dressing and levelling the bed including all labour, T&P etc. complete as directed by the Engineer in Charge. |
| 16 | Cement concrete (1:4:8) using graded stone aggregate 40mm nominal size including cost of all materials and all labour etc. complete |
| 17 | Cement concrete (1:2:4) using 12 mm nominal size cb chips including cost of all materials and all labour etc. complete |
| 18 | Supplying fitting and fixing W.I. clamps 28cm to 30cm size including cost,labour etc. complete |
| 19 | Dressed seasoned Non-sal wood work indoors & windows frames chaukath including cost of all materilas,labour for fitting & fixing etc complete |
| 20 | 12mm thick Cement plaster(1:6) over out side wall including curing etc. complete |
| 21 | 16mm thick Cement plaster (1:6) over inside wall including curing etc. complete |
| 22 | 12mm thick Cement plaster (1:4) over brickwork with neat Cement punning for skirting including curing etc. complete. |
| 23 | 6mm thick Cement plaster (1:4) to R.C.C.surfacefinished smooth including closed deep chipping and slurry treatment curing etc. complete. |
| 24 | 2.5 cm DPC with Cement concrete (1:2:4) including punning using 12mm size hand broken granite chipps. |
| 25 | 2.5 cm thick grading concrete (1:2:2) on Roof slab with 6 mm size hard broken granite chips on new works |
| 26 | Cost of MS Grills including cost of all materials, labour for fitting& fixing etc complete. |
| 27 | 32mm Non-sal wood panelled shutters moulded panels with all labour,iron fittings and wooden hinged cleats etc fitted and fixed complete in all respect,but excluding the cost of iron fittings. |
| 28 | Fixing of Vetrified tiles in floors on 25mm thick bed of Cement mortar and filling joint with white Cement in slury mixed with pigment to match the shades of the tiles including cost of all materials labour etc complete. |
| 29 | Fixing of ceramic wall tiles in dados, skirting riser of stepps of premium grade on12 mm thick bed of Cement mortar 1:3 jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete |
| 30 | Painting 2-coat to walls with plastic emulsion ofapproved shade on new work to give on even shade over one coat of priming coat. |
| 31 | Finishing wall surface with weather coat painting 2 coat to the out side surfaces of walls over one coat of primer with all cost. |
| 32 | Painting with synthetic enamal paint 2-coats over one coat of priming including cost of all materials labour etc complete. |