| 1 | a) construction of 04 Nos. Double Storey Prisoners barrack by way of construction of Segregation walls) |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 9 | Foundations, footings, bases of columns etc. for mass concrete. |
| 10 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 11 | Columns, pillars, piers, abutments, posts and struts. |
| 12 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) including Extra for brick work with common burnt clay bricks/cement concrete bricks insuperstructure above plinth level upto floor five level |
| 13 | 15mm Cement plaster on the rough side of single or half brick wall of 1 : 6 ( 1 cement : 6 fine sand) |
| 14 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.1 Mild steel and medium tensile steel barsThermo-Mechanically Treated bars of grade Fe-500D or more |
| 16 | Carraige of material by mechanical means and head load |
| 17 | Sand avg lead 240 Km by Mech and 100 Mt by head load |
| 18 | stone agg avg lead 10 KM by MT and 100 Mt by head load |
| 19 | Bricks avg lead 230 Km by Mechmeans and 100 Mtr by head load |
| 20 | Proving and fixing in position sanitary and plumbing items complete job including costs and carriage of all materials involved of superior and approved make as approved and direct by EIC |
| 21 | 4\" PVC Pipe |
| 22 | 4\" PVC plain Bend |
| 23 | b) Hospital Block Building inside the jail complex ( by way of const of segregation walls) |
| 24 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil |
| 25 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m |
| 26 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size |
| 27 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 28 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 29 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 30 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 31 | Foundations, footings, bases of columns etc. for mass concrete. |
| 32 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 33 | Columns, pillars, piers, abutments, posts and struts |
| 34 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) and Extra for brick work with common burnt clay bricks/cement concrete bricks insuperstructure above plinth level upto floor five level |
| 35 | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 36 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 37 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more |
| 38 | Carraige of material by mechanical means and head load |
| 39 | Sand avg lead 240 Km by Mech and 100 Mt by head load |
| 40 | stone agg avg lead 10 KM by MT and 100 Mt by head load |
| 41 | Bricks avg lead 230 Km by Mechmeans and 100 Mtr by head load |
| 42 | Proving and fixing in position sanitary and plumbing items complete job including costs and carriage of all materials involved of superior and approved make as approved and direct by EIC |
| 43 | 4\" PVC Pipe |
| 44 | 4\" PVC plain Bend |
| 45 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 46 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2 |
| 47 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. |
| 48 | Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution |
| 49 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work inclu lead, lift and carrige of all material involved upto work site |