}

Supply Of Installation And Commissi Oning Of Test Bench With Speedinstallation And Commissi Oning Of Test Bench With Speed,Installation And Commissi Oning Of Test Bench With Speed Simulator For Testing Of Speed Recorder &Indicatar System And Pulse Genera-Uttar Pradesh

North Eastern Railways has published Supply Of Installation And Commissi Oning Of Test Bench With Speedinstallation And Commissi Oning Of Test Bench With Speed,Installation And Commissi Oning Of Test Bench With Speed Simulator For Testing Of Speed Recorder &Indicatar System And Pulse Genera. Submission Date for this Tender is 23-11-2021. Miscellaneous Fasteners Tenders in Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

29753748
Supply Of Installation And Commissi Oning Of Test Bench With Speedinstallation And Commissi Oning Of Test Bench With Speed,Installation And Commissi Oning Of Test Bench With Speed Simulator For Testing Of Speed Recorder &Indicatar System And Pulse Genera
Open Tender
Indian
Uttar Pradesh
23-11-2021

Tender Details

Supply Of Installation And Commissi Oning Of Test Bench With Speedinstallation And Commissi Oning Of Test Bench With Speed,Installation And Commissi Oning Of Test Bench With Speed Simulator For Testing Of Speed Recorder &Indicatar System And Pulse Generater (As Per Rd So Spee No.M. P. O. 3700.07 Rev06 Oct 2015 Or Lastast) ForInspeetion Carriage/Memu Moter Car. Features And Speeification Of Test Bench. Auxiliary Supply Single Phase230V Ac, 50Hz Ac Supply. Roto Axle Simulation Inverter Based Variable Frequency Drive And Induction Motor WithSuitable Arrangement To Mount All Type Of Pgs Like Medha, Laxven, Aal, Telpro Etc. To Monitor And Control TheRelevant Parametwr Related To The Motor Described Above An Rpm Meter And A Knob To Varies The Speed AreProvided. Speed Simulator Micro Controller Based Signal Generator To Test The All Type Of Speedometer Like Medha,Laxven, Aal, Telpro Etc. ,With The Following Test Parameter Setting. Ppr 1-200 Max Speed 1-200.0Km/Hr.Diameter 100-1500Mm Step Delay 1-60Sec. Acceleation 1 To 50 Km/Sec. Testing Can Be PerformedFor Hours And Days Without Any Degradation In Test Date Variable Power Supply A Dc Within A Range From 20 To120 V Dc Will Be Fe To The Speedometer And Voltage And Current Of Sdfthe Thereof Can Be Monitored Using A VoltMeter And Ampere Meter Respectively. Energy Simulation While Testing All Signaling Inputs (Aka Signals) Shall BeEstablished With The Help Of Inverter- Baded Technology To Ensure Their Stadbility And Accuracy. We Offer The Third-Party Energy Meter Ot Monitor The Krelevant Parameter Corrdesponding To The Energy Consumption. These SignalCan Be Varied Manually With Showing Up To 25 Kv Ac And Up To 300 Amp. Only Signal Conversion Unit (Scu) To BeInstalled With The Unit Under The Test . Date Storage Mechanism And Ease Of Operablilty During The Testing OfSpeedometer Testing Type And Testing Parameters Can Be Control Through Pc And Data Can Be Record And A ReportCan Ne Genegated In Such A Manner To Ma

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail