}

Bids Are Invited For Part-A-Item - 1 - Earth Filling From Brought Out Earth ( Excluding Rock ) In Trenches, Open Pits, Over Pipeline Trenches Etc. In Layers Not Exceeding 20 Cms In Depth, Consolidating Each Deposited Layer By Ramming And Water-Uttar Pradesh

Ministry Of Petroleum And Natural Gas has published Bids Are Invited For Part-A-Item - 1 - Earth Filling From Brought Out Earth ( Excluding Rock ) In Trenches, Open Pits, Over Pipeline Trenches Etc. In Layers Not Exceeding 20 Cms In Depth, Consolidating Each Deposited Layer By Ramming And Water. Submission Date for this Tender is 19-11-2021. Brooms and Mops Tenders in Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

29735841
Bids Are Invited For Part-A-Item - 1 - Earth Filling From Brought Out Earth ( Excluding Rock ) In Trenches, Open Pits, Over Pipeline Trenches Etc. In Layers Not Exceeding 20 Cms In Depth, Consolidating Each Deposited Layer By Ramming And Water
Open Tender
NCB
Uttar Pradesh
19-11-2021

Tender Details

Bids Are Invited For Part-A-Item - 1 - Earth Filling From Brought Out Earth ( Excluding Rock ) In Trenches, Open Pits, Over Pipeline Trenches Etc. In Layers Not Exceeding 20 Cms In Depth, Consolidating Each Deposited Layer By Ramming And Watering To Any Lead And Lift Etc. Complete As Directed By Engineer-In-Charge At Washout Sites Along The Pipeline , Part-A-Item - 2 - Providing And Laying In Position Empty Hdpe Cement Bags Filled With Cement Sand In The Ratio 1:10 ( 1 Cement:10 Coarse Sand ) , After Stitching / Sewing Of Bags With Nylon Thread, Handling, Placing & Watering Etc. Complete As Directed By Engineer-In-Charge At Washout Sites Along The Pipeline ( Approx. 28 Nos. Of Bags Will Be Required To Be Laid For One Cu. Mtr Of Volume ) The Item Shall Be Paid As Per Compacted Volume Measured At Site. Item Include Cost Of The Material, Transportation, All Resource, Royalty Etc. Complete In All Respect , Part-A-Item - 3 - Providing And Laying In Position Empty Hdpe Cement Bags Filled With Earth After Sewing The Bag, Including Placing, Handling, Watering As Directed By Engineer-Incharge At Washout Sites Along The Pipeline ( Approx. 28 Nos. Of Bags Will Be Required To Be Laid For One Cu. Mtr Of Volume ) . The Item Shall Be Paid As Per Compacted Volume Measured At Site. Item Include Cost Of The Material, Transportation, All Resources, Royalty Etc. Complete In All Respect. , Part-A-Item - 4 - Warning Sign Board Refer ( Drg-001 ) :Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 5 - Direction Marker Refer ( Drg No.-002 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 6 - Kilometer Marker Refer ( Drg No.-003 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 7 - Arial Marker Refer ( Drg No.-004 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 8 - Boundary Pillar Refer ( Drg No.-005 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 9 - Navigable Warning Board ( Drg No.-0060 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 10 - Vent & Drain Pipe Refer ( Drg. 007 ) : Repainting ( Minimum 2 Coats ) & Relettering Of Existing Various Types Of Markers With Ready Mixed Synthetic Enamel Paint Of Approved Brand Over A Coat Of Red Oxide / Zinc Chromate Primer Over Steel Surface & Cement Primer Over Concrete Surface After Removing Loose Old Paint, All Rust, Oil Bound Dust Etc By Scrapping, Sand Papering, Using Rust Free Paint Remover & Proper Surface Preparation. The Item Includes Complete Cost Of Paint Removal ( Whenever Required ) Surface Preparation Repainting Including Material ( Paint, Primer Etc. ) , All Resources, Transportation & Re Lettering On The Markers As Per The Drawings Issued And Refitting Of Marker With Proper Grouting To The Satisfaction Of Engineer-In -Charge , Part-A-Item - 11 - Painting Of Under Ground Valves With Epoxy Paint After Cleaning Surface Of Any Loose Flaky Paint Over A Coat Of Primer, Compatible With The High-Build Epoxy, To Produce A Minimum Dry Film Thickness ( Dft ) Of 50 Μm, The External Surface Shall Be Coated With Two Or More Coats Of The High-Build Epoxy Coating To Produce A Minimum Total Dft Of 550 Μm ( Primer+Epoxy ) . The Flange Faces Shall Be Coated To Achieve A Maximum Dft Of 250 Μm, Including Primer. Areas Not To Be Painted, Such As Name Plate, Gi / Ss Parts Should Be Effectively Masked. Item Include Cost Of All Materials Including Paint, Transportation And All Resource. , Part-A-Item - 12 - Installation Of Uprooted Existing Markers At The Existing Or Designated Location / Chainage Including Excavation For Foundation, Pcc Grouting With 1:2:4 Cement Concrete, Laying In Postion By Shuttering, Centering Etc Backfilling, Disposal Of Surplus Soil, Old Pcc Material , Minor Rectification Like Straightening Bent Pipes, Plates Etc. As Applicable. The Item Includes Cost Of Materials, Consumables, All Resource, Tools & Transportation. As Per Drawings Issued & Satisfaction Of Engineerin-Charge , Part-A-Item - 13 - Warning Sign Board Refer Drg-001 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 14 - Direction Marker Refer Drg No.-002 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 15 - Kilometer Marker Refer Drg No.-003 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 16 - Aerial Marker Refer Drg No.-004 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 17 - Navigable Warning Board Drg No.-006 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 18 - Installation Of Vent / Drain Pipe Drg. 007 : Supply & Installation Of Various Types Of Markers As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge. , Part-A-Item - 19 - Precast Rou Boundary Marker: Supply & Installation Of Precast Rou Boundary Marker As Detailed Herein At Designated Location / Chainage, Including Fabrication From Steel As Per Drawing & Specification, Applying A Primer Coat Of Approved Red Oxide Zinc Chromate Primer Transportation Upto The Work Site, Excavation In Foundation, Concreting As Per Drawing / Spec, Backfilling, Painting & Lettering Of Markers By Using Approved Brand Of Paint & Disposal Of Surplus Materials. The Item Includes Supply Cost Of All The Construction Materials, Consumable, Fabrication Work, Transportation, All Resource Charges, Cost Of Primer, Paint Tools Which Are Required For Complete Work As Per The Drawing Notes, Specifications & Satisfaction Of Engineer-In-Charge ( Refer To Drawing No. 005 ) , Part-A-Item - 20 - Mobilisation In Emergency- Pipeline Leak Repair By Leak Repair Clamp 24-36 Nominal Dia Pipe: Attending Of Pipeline Leak Repairs By Fixing Leak Repair Clamps At Different Sites Under Dibiyapur Maintenance Base Jurisdiction Pipelines, ( Leak Clamps Will Be Supplied By Gail ) It Also Includes Supply Of All Resource & Machinery Required For Lifting / Shifting / Handling Of Leak-Repair Clamps, Excavation For Pipeline At Any Depth To Attend The Leak & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 21 - Mobilisation In Emergency- Pipeline Leak Repair By Leak Repair Clamp 12-18 Nominal Dia Pipe : Attending Of Pipeline Leak Repairs By Fixing Leak Repair Clamps At Different Sites Under Dibiyapur Maintenance Base Jurisdiction Pipelines, ( Leak Clamps Will Be Supplied By Gail ) It Also Includes Supply Of All Resource & Machinery Required For Lifting / Shifting / Handling Of Leak-Repair Clamps, Excavation For Pipeline At Any Depth To Attend The Leak & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 22 - Mobilisation In Emergency- Pipeline Leak Repair By Leak Repair Clamp 2-10 Nominal Dia Pipeline : Attending Of Pipeline Leak Repairs By Fixing Leak Repair Clamps At Different Sites Under Dibiyapur Maintenance Base Jurisdiction Pipelines, ( Leak Clamps Will Be Supplied By Gail ) It Also Includes Supply Of All Resource & Machinery Required For Lifting / Shifting / Handling Of Leak-Repair Clamps, Excavation For Pipeline At Any Depth To Attend The Leak & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 23 - Mobilisation In Emergency- By Replacing Pup Piece ( 24-36 Nominal Dia Pipe ) : Attending Pipeline Leak Repairs By Replacing The Pup Piece Of Length Approx. 6 To 12 Mtr And Welding New Pipe Section At Different Locations Under Dibiyapur Maintenance Base Jurisdiction Pipelines. Radiography Of Weld Joints. It Includes Transportation Of Pipe From Gail Designated Store It Includes Supply Of Welding Generator Set And All Resource , All Tools & Tackles Etc. It Also Includes Supply Of Resource & Machinery Required For Excavation For Pipeline At Any Depth To Attend The Leak , Coating & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 24 - Mobilisation In Emergency- By Replacing Pup Piece ( 12-18 Nominal Dia Pipe ) : Attending Pipeline Leak Repairs By Replacing The Pup Piece Of Length Approx. 6 To 12 Mtr And Welding New Pipe Section At Different Locations Under Dibiyapur Maintenance Base Jurisdiction Pipelines. Radiography Of Weld Joints. It Includes Transportation Of Pipe From Gail Designated Store It Includes Supply Of Welding Generator Set And All Resource , All Tools & Tackles Etc. It Also Includes Supply Of Resource & Machinery Required For Excavation For Pipeline At Any Depth To Attend The Leak , Coating & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 25 - Mobilisation In Emergency- By Replacing Pup Piece ( 2-10 Nominal Dia Pipeline ) Attending Pipeline Leak Repairs By Replacing The Pup Piece Of Length Approx. 6 To 12 Mtr And Welding New Pipe Section At Different Locations Under Dibiyapur Maintenance Base Jurisdiction Pipelines. Radiography Of Weld Joints. It Includes Transportation Of Pipe From Gail Designated Store It Includes Supply Of Welding Generator Set And All Resource , All Tools & Tackles Etc. It Also Includes Supply Of Resource & Machinery Required For Excavation For Pipeline At Any Depth To Attend The Leak , Coating & Backfilling To Complete The Work In All Respects As Per Scope Of Work & Directions Of E-I-C , Part-A-Item - 26 - House Keeping & Cleaning Of Terminals / Sv / Rr / Ip Station ( Approx Size 25 M X 25 M ) ( Total No Of Sv / Terminals=04 ) : Providing All Resource Along With Cleaning Materials And Tools Viz Mops And Squeegees, Microfiber Cloth, Abrasives, Dustpan And Brushes, Brooms, Buckets And Bowls Etc For Cleaning Of Installations / Terminals And Weed Cutters, Grass Trimmer, Pruning Shears, Pruning Loppers, Handsaw Or Chainsaw Etc For Cutting Of Grass / Herbs, Trimming & Dressing Of Tress / Branches Includes All Consumables, Removing And Disposal Of The Garbage Outside Of The Installations / Terminals At Least 50 Meter Away From The Boundary Of The Premises / Or Designated Area As Per Scope Of Work To The Satisfaction Of Eic , Part-A-Item - 27 - House Keeping & Cleaning Of Terminals / Sv / Rr / Ip Station ( Approx Size 50 M X 50 M ) ( Total No Of Sv / Rr= 05 ) : Providing All Resource Along With Cleaning Materials And Tools Viz Mops And Squeegees, Microfiber Cloth, Abrasives, Dustpan And Brushes, Brooms, Buckets And Bowls Etc For Cleaning Of Installations / Terminals And Weed Cutters, Grass Trimmer, Pruning Shears, Pruning Loppers, Handsaw Or Chainsaw Etc For Cutting Of Grass / Herbs, Trimming & Dressing Of Tress / Branches Includes All Consumables, Removing And Disposal Of The Garbage Outside Of The Installations / Terminals At Least 50 Meter Away From The Boundary Of The Premises / Or Designated Area As Per Scope Of Work To The Satisfaction Of Eic , Part-A-Item - 28 - House Keeping & Cleaning Of Terminals / Sv / Rr / Ip Station ( Approx Size 100 M X 100 M ) ( Total No Of Ip Stn =04 ) : Providing All Resource Along With Cleaning Materials And Tools Viz Mops And Squeegees, Microfiber Cloth, Abrasives, Dustpan And Brushes, Brooms, Buckets And Bowls Etc For Cleaning Of Installations / Terminals And Weed Cutters, Grass Trimmer, Pruning Shears, Pruning Loppers, Handsaw Or Chainsaw Etc For Cutting Of Grass / Herbs, Trimming & Dressing Of Tress / Branches Includes All Consumables, Removing And Disposal Of The Garbage Outside Of The Installations / Terminals At Least 50 Meter Away From The Boundary Of The Premises / Or Designated Area As Per Scope Of Work To The Satisfaction Of Eic , Part-A-Item - 29 - Maintenance Of Hand / Submersible Pumps - Minor Maintenaces: Repairing Of Existing Hand / Submersible Pump By Dismantling The Old Existing Pump I.E. Pulling Out The Gi Pipe And Lowering Again After Checking / Repairing To The Original Position. Nrv, Washers Etc If Found Defective, Shall Be Replaced With New. Defective Gi Pipe Shall Be Replaced With Good Quality Gi / Pvc Pipe With Necessary Hardware. All Resource, Material Along With Associated Transportation Shall Be In The Scope Of Contractor. , Part-A-Item - 30 - Maintenance Of Hand / Submersible Pumps - Major Maintenaces: Repairing Of Existing Hand / Submersible Pump By Dismantling The Old Existing Pump I.E. Pulling Out The Gi Pipe And Lowering Again After Checking / Repairing To The Original Position. Nrv, Washers Etc If Found Defective, Shall Be Replaced With New. Defective Gi Pipe Shall Be Replaced With Good Quality Gi / Pvc Pipe With Necessary Hardware. If Required Additional Boring Depth Upto 300 Ft. Shall Also Be Increased Along With Putting New Gi Pipes Hardware To Make The Hand Pump In Good Working Condition. All Resource, Material Consumables Etc Along With Associated Transportation Shall Be In The Scope Of Contractor. , Part-A-Item - 31 - Modification Work At Gas Terminals - Modification Works With Shutdown: Modification Works Within 6-8 Hrs Of Shutdown At Various Terminals And Pl Installations In Dibiyapur Region Maintenance Base Jurisdiction With Shutdown Including Fabrication Of Spools , Cutting Of Piping, Valves, Flanges, Joints, Fittings, Grinding, Bevelling, Welding As Per Api / Asme Standards, Ndt, Hydrotesting, Dewatering, Drying, Charging With Gas & Commissioning Of The Modified Sections As Per Scope Of Work & Directions Of Eic Upto 14 Inch Dia Work. ( The Rate Shall Be Per Inch Nominal Dia Of Pipeline ) , Part-A-Item - 32 - Modification Work At Gas Terminals - Modification Works Without Shutdown: Modification Works At Various Terminals And Pl Installations Without Shut Down In Dibiyapur Region Maintenance Base Jurisdiction Including Fabrication Of Spools, Cutting Of Piping, Valves, Flanges, Joints, Fittings, Grinding, Bevelling, Welding As Per Api / Asme Standards, Ndt, Hydrotesting, Dewatering, Drying, Charging With Gas & Commissioning Of The Modified Sections As Per Scope Of Work & Directions Of Eic. ( The Rate Shall Be Per Inch Nominal Dia Of Pipeline ) , Part-A-Item - 33 - Supply Of Nitrogen Gas In Cylinders , Part-A-Item - 34 - Rou Encroachments Handling & Front Clearing - Providing Assistance For The Removing Encroachment Of Rou As Per Direction Of Gail Which Includes Coordination With Encroachers For The Removal At Initial Level, Coordination With The Concerned Authority For The Removal Of Encroachment, Charges For The Transportation, Boarding & Lodging Etc Also If Required As Per Situation. , Part-A-Item - 35 - Fabrication, Supply & Erection / Dismantling Of Steel Structures - Work At Site In Built Up Section In Rs Joists I.E. Angles, Channels, Tee, Pipes, Flats, I Beams, Chequered Plats, Sheets Etc. For Cross Overs, Platforms, Stands, Pipe Supports & Similar Structures, Gi Cable Trays, Nuts Bolts, Washers Etc. Including Cutting, Welding & Fixing In Position At Site As Per Scope Of Works & Direction Of E-I-C , Part-A-Item - 36 - Dismantling Of Structure Steel: Dismantling Of Steel Structure, As Per Instructions Of Engineer In-Charge, Including Isolation , Evacuation, Nitrogen Purging Water Flushing If Required , Gas Cutting, Removal From Site, Unbolting , Shifting The Same To The Gails Designated Store / Yard Or Pipeline Installations As Per The Instruction Of Engineer-In-Charge. , Part-A-Item - 37 - Coating Repair Of Underground Pipelines Of Various Sizes 2 -36 In Including Necessary Excavation / Backfilling, All Resource, Tools, Tackles, Consumables Etc As Per Scope Of Work & Directions Of Eic. Excavation In All Kind Of Soils Up To The Depth Required, As Directed By Eic And Backfilling As Per The Original Condition And Up To The Satisfaction Of Respective Land Owner And Eic. , Part-A-Item - 38 - Coating Repair Of Underground Pipelines Of Various Sizes 2 -36 In Including Necessary Excavation / Backfilling, All Resource, Tools, Tackles, Consumables Etc As Per Scope Of Work & Directions Of Eic. Coating Repair Using Cold Applied Tapes ( Inner Wrap, Outer Wrap And Primer ) / Perp-Patch Application System Supplied By Gail ( Primer, Inner Wrap And Outer Wrap ) ( Area Shall Be Final Surface Area Of Pipeline Including Primer, Inner Wrap And Outer Wrap ) , Part-A-Item - 39 - Providing Equipments On Hire - Excavator Cum Loader - Jcb ( 1400 Kg Bucket / 1.1 Cum Loader Capacity ) : Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Time Considered For Payment Purpose Shall Be Equipment Availability Time At Site Excluding Transportation / Breakdown Time If Any ) , Part-A-Item - 40 - Providing Equipments On Hire - Excavator Cum Loader - Jcb ( 1400 Kg Bucket / 1.1 Cum Loader Capacity ) : Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs , Part-A-Item - 41 - Providing Equipments On Hire - Pick And Carry Crane - Hydra ( 12 Ton Capacity ) : Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Time Considered For Payment Purpose Shall Be Equipment Availability Time At Site Excluding Transportation / Breakdown Time If Any ) , Part-A-Item - 42 - Providing Equipments On Hire - Pick And Carry Crane - Hydra ( 12 Ton Capacity ) : Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Tim , Part-A-Item - 43 - Providing Equipments On Hire - Portable Engine Driven Dewatering Pump Set: Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Time Considered For Payment Purpose Shall Be Equipment Availability Time At Site Excluding Transportation / Breakdown Time If Any ) , Part-A-Item - 44 - Providing Equipments On Hire - Portable Generator 3 Kva With Lighting Facilities ( 04 Nos Of 400 W Hpsv ) Along With Necessary Fittings: Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Time Considered For Payment Purpose Shall Be Equipment Availability Time At Site Excluding Transportation / Breakdown Time If Any ) , Part-A-Item - 45 - Providing Equipments On Hire - Portable Dg Set Of 15Kva To 40 Kva Along With Necessary Fittings: Providing Equipments On Rental Including Operator And Consumables Including Fuel, Transportation, Boarding, Lodging, Fooding Etc. Complete On Day ( 8 Hrs ) Or Hourly Basis ( Time Considered For Payment Purpose Shall Be Equipment Availability Time At Site Excluding Transportation / Breakdown Time If Any ) , Part-A-Item - 46 - Providing Equipments On Hire - Providing Tractor Trolley Of Standard Capacity Or More Including Supplying Of 3 All Resources For Loading Unloading The Articles, Necessary Operators, All Resourceers And Fuel Etc. For Carriage / Disposal Of Material Or Other Purposes By Tractor Trolley Within / Around Premises Of Plant Or Rou Of Any Lead As Directed By Eic. Payment On Pro Rata Rate Basis In Multiple Of Half Day , Part-A-Item - 47 - Providing Services On Hire - Iti Passed Technician ( Mechanical / Electrical / Instrumentation ) As Directed By Eic : Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 48 - Providing Services On Hire - Pipe Fitter: Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 49 - Providing Services On Hire - Rigger: Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 50 - Providing Services On Hire - Qualified ( Cs ) Pipe Welder / Cutter: Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 51 - Providing Services On Hire -Mason / Carpenter : Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 52 - Providing Services On Hire - Plumber / Painter: Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 53 - Providing Services On Hire - Helper / Labour: Providing Services On Hire In The Following Categories Complete On Day ( 8 Hrs ) Or Hourly Basis With Necessary Tools-Tackles, Consumable, Accessories Etc. ( Other Than Special ( Non Sparking ) Tools , Part-A-Item - 54 - Providing & Laying Pcc 1:2:4 : Providing And Laying Plain Cement Concrete Of Nominal Mix 1:2:4 By Mass ( 1 Cement: 2 Coarse Sand: 4 Graded Stone Aggregates / Gravels ) With 20 Mm And Down Nominal Size Graded Crushed Stoneaggaregates / Gravels For All Various Location Above And Below The Plinth Level In Foundation, Substructure & Superstructure Etc. Or Any Other Works Etc. Including Cenering & Shuttering, Tamping, Ramming, Vibrating, Curing Etc. All As Specified In Any Shape, Position, Thickness And Finishing The Top Surface Rough Or Smooth As Specified And Directed All Complete For Concrete. As Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic. All Complete With Including Required Material, All Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) . All Materials Including Cement Supplied By Thecontractor. , Part-A-Item - 55 - Providing & Laying Rcc 1:1.5:3 : Providing And Laying Reinforced Cement Concrete Of Design / Nominal Mix 1:1.5:3 By Mass ( 1 Cement: 1.5 Coarse Sand: 3 Graded Stone Aggregates / Gravels ) With 20 Mm And Down Nominal Size Graded Crushed Stone Aggaregates / Gravels For All Various Location Above And Below The Plinth Level In Foundation, Substructure & Superstructure Etc.Or Any Other Works Etc. Including Centering & Shuttering, Tamping, Ramming, Vibrating, Curing Etc. All As Specified In Any Shape, Position, Thickness And Finishing The Top Surface Rough Or Smooth As Specified And Directed All Complete For Concrete. As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic. All Complete With Including Required Material, All Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) . All Materials Including Cement Supplied By The Contractor. , Part-A-Item - 56 - Brick Work In Cement Mortar ( 1 Cement : Brick Work With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 Below & Above Plinth Level In Foundation, Substructure & Superstructure Etc. In All Shapes And Sizes In Cement Mortar 1:4 ( 1 Cement : 4 Coarse Sand ) As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .All Materials Including Brick, Cement Supplied By The Contractor. , Part-A-Item - 57 - Demolishing Brick Work : Demolishing Brick Work In Cement Mortar Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material With In 50 Metres Lead. , Part-A-Item - 58 - 15Mm Thick Cement Plaster: 15 Mm Cement Plaster On Rough Side Of Single Or Half Brick Wall Of Mix 1:4 ( 1 Cement: 4 Coarse Sand ) . All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic. Item Also Include The Removal Of Existing Plaster If Required. All Materials Including Cement Supplied By The Contractor. , Part-A-Item - 59 - Providing & Laying Cc Paver Block: Providing And Laying Factory Made Chamfered Edge Cosmic Cement Concrete Paver Blocks Of Required Strength, Thickness & Size / Shape, Made By Table Vibratory Method, To Attain Superior Smooth Finish Using Pu Or Equivalent Moulds, Laid In Required Grey Colour & Pattern Over 50Mm Thick Compacted Bed Of Coarse Sand, Compacting And Proper Embedding / Laying Of Inter Locking Paver Blocks Into The Sand Bedding Layer Through Vibratory Compaction By Using Plate Vibrator, Filling The Joints With Jamuna Sand And Cutting Of Paver Blocks As Per Required Size And Pattern, Finishing And Sweeping Extra Sand In Footpath, Parks, Lawns, Drive Ways Or Light Traffic Parking Etc. All Complete As Per Manufacturer#S Specifications & Direction Of Engineer -In-Charge: 60 Mm Thick C.C. Paver Block Of M-30 Grade With Approved Color Design And Pattern Inclusive Cost Of Separation Membrane Of Impermeable Plastic Sheeting 125 Micron Thick Shall Also Be Provided Under The Sand Bedding Layer To Aviod Vegetation Growth. , Part-A-Item - 60 - Taking Out Existing Paverblocks & Refixing The Same :- Taking Out Existing Cc Interlocking Paver Blocks From Footpath / Central Verge, Including Removal Of Rubbish Etc., Disposal Of Unserviceable Material To The Dumping Ground, For Which Payment Shall Be Made Separately And Stacking Of Serviceable Material Within 50 Metre Lead As Per Direction Of Engineer-In-Charge. Laying Old Cement Cocrete Interlocking Paver Blocks Of Any Design / Shape Laid In Required Line, Level, Curvature, Colour And Pattern Over And Including 50 Mm Thick Compacted Bed Of Coarse Sand ( Jamuna Sand ) , Filling The Joints With Fine Sand Etc. Inclusive Cost Of Separation Membrane Of Impermeable Plastic Sheeting 125 Micron Thick Shall Also Be Provided Under The Sand Bedding Layer To Aviod Vegetation Growth All Complete As Per The Direction Of Engineer In-Charge. ( Old Cc Paver Blocks Shall Be Carefully Taken Out And Relaid ) . Including All Material. With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) As Per Drawings, Specifications & Direction By Eic & Upto Satisfaction Of Eic. Supply Of All Material In Contractors Scope. , Part-A-Item - 61 - Supply & Fixing Of Glass Panes 3 To 4 Mm :Renewing Glass Panes, With Putty And Nails Wherever Necessary With Glass Panes. Supply And Fixing Of The Window Glass Panes 3 To 4 Mm Thick As Per Requirement With Good Quality Glass Putty, Nails / Clips. Glass, Glass-Putty, Nails / Clips And Any Other Required Consumable, Resource, Transportation Of Material Are In The Scope Of Contractor. All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic , Part-A-Item - 62 - Supplying & Fixing Pvc Flooring : Supply & Fixing 3 Mm ( ± 10% ) Thick Pvc Flooring Of Specified Shade Colour On Any Surfaces With Good Quality Adhesive ( Including Cleaning The Surface Of All Dirt, Seals, Oil, Grease And Foreign Material Etc. ) .All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic.The Pvc Flooring Should Be Of Standard Quality Having Weather Resistant For A Period Of At Least 5 Year. , Part-A-Item - 63 - Providing & Fixing Acid Tile:Providing And Fixing 10 Mm Thick Acid And / Or Alkali Resistant Tiles Of Approved Make And Colour Using Acid And / Or Alkali Resisting Mortar Bedding, And Joints Filled With Acid And / Or Alkali Resisting Cement As Per Is :4457, Complete As Per The Direction Of Engineer-In- Charge. In Flooring. Dado / Skirting Etc Places On A Bed Of 10 Mm Thick Mortar 1:4 ( 1 Acid Proof Cement : 4 Coarse Sand ) . All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic.All Materials Including Acid & Alkali Resistant Tile Supplied By The Contractor. , Part-A-Item - 64 - Cleaning Of Rou: Clearing Of Wide Rou Strip Jungle Including Cutting & Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of All Girth & Height Above Ground Level And Removal Of Rubbish Upto A Distance Of 50 M Outsidethe Periphery Of The Rou Limit Area Cleared As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) . , Part-A-Item - 65 - Rcc Hume Pipe -150Mm Dia : Providing And Laying Non-Pressure Np2 Class ( Light Duty ) R.C.C. Pipes Of 150 Mm Nominal Diameter, With Collars Jointed With Stiff Mixture Of Cement Mortar In The Proportion Of 1:2 ( 1 Cement : 2 Fine Sand ) Including Testing Of Joints Etc. Complete, At Specified Pipe Line Rou Site. Normal Length Required Of Each Pipe Is 2.5 Metres.Etc. All Complete.With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) As Per Drawings, Specifications & Direction By Eic & Upto Satisfaction Of Eic. Supply Of All Material In Contractors Scope. , Part-A-Item - 66 - Rcc Hume Pipe -300Mm Dia : Providing And Laying Non-Pressure Np2 Class ( Light Duty ) R.C.C. Pipes Of 300 Mm Nominal Diameter, With Collars Jointed With Stiff Mixture Of Cement Mortar In The Proportion Of 1:2 ( 1 Cement : 2 Fine Sand ) Including Testing Of Joints Etc. Complete, At Specified Pipe Line Rou Site. Normal Length Required Of Each Pipe Is 2.5 Metres.Etc. All Complete.With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) As Per Drawings, Specifications & Direction By Eic & Upto Satisfaction Of Eic. Supply Of All Material In Contractors Scope. , Part-A-Item - 67 - Rcc Hume Pipe -450Mm Dia : Providing And Laying Non-Pressure Np2 Class ( Light Duty ) R.C.C. Pipes Of 450 Mm Nominal Diameter, With Collars Jointed With Stiff Mixture Of Cement Mortar In The Proportion Of 1:2 ( 1 Cement : 2 Fine Sand ) Including Testing Of Joints Etc. Complete, At Specified Pipe Line Rou Site. Normal Length Required Of Each Pipe Is 2.5 Metres.Etc. All Complete.With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) As Per Drawings, Specifications & Direction By Eic & Upto Satisfaction Of Eic. Supply Of All Material In Contractors Scope. , Part-A-Item - 68 - Pvc Pipe- 110 / 75 Mm Dia: Providing Of Pvc Pipes ( Dia 110 / 75 Mm ) Approved Make ( Isi Mark ) As Per Direction Of Eic Including Required Solution For Fixing Etc. Complete. , Part-A-Item - 69 - White Washing With Lime On Old Work: White Washing With Lime To Give An Even Shade At Old Work With Minimum Two Or More Coats. Item Include Removing White Or Colour Wash By Scrapping And Sand Papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Complete. All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic. , Part-A-Item - 70 - Synthetic Enamel Painting : Painting On G.S. Sheet / Structure With Synthetic Enamel Paint Of Approved Brand And Manufacture ( Asian / Berger / Nerolac ) Of Required Colour To Give An Even Shade. New Work ( Two Or More Coats ) Including Acoat Of Approved Steel Primer.All Complete With Including All Required Resource, Tools & Tackles To Complete The Work In All Respect ( Without Any Extra Cost ) .As Per Drawings, Specification & Direction By Eic & Upto Satisfaction Of Eic / Sic. , Part-A-Item - 71 - Lettering - 1 To 4: Lettering With Synthetic Enamel Paint Of Approved Brand ( Asian / Berger / Nerolac ) / Make / Colour Of Letter Sizes Between 1 To 4 At Sv / Ip / Rr & Terminal Piping, Equipment And Structure As Per The Direction Of Eic . The Item Includes Cost Of Material And All Resource Etc Required For Complete The Lettering Work In All Respect. , Part-A-Item - 72 - Lettering - Above 4 And Up To 8 : Lettering With Synthetic Enamel Paint Of Approved Brand ( Asian / Berger / Nerolac ) / Make / Colour Of Letter Sizes Between 4 To 8 At Sv / Ip / Rr & Terminal Piping, Equipment And Structure As Per The Direction Of Eic . The Item Includes Cost Of Material And All Resource Etc Required For Complete The Lettering Work In All Respect. , Part-A-Item - 73 - Lettering - Above 8 And Up To 12: Lettering With Synthetic Enamel Paint Of Approved Brand ( Asian / Berger / Nerolac ) / Make / Colour Of Letter Sizes Between 8 To 12 At Sv / Ip / Rr & Terminal Piping, Equipment And Structure As Per The Direction Of Eic . The Item Includes Cost Of Material And All Resource Etc Required For Complete The Lettering Work In All Respect. , Part-A-Item - 74 - Lettering - Above 12 : Lettering With Synthetic Enamel Paint Of Approved Brand ( Asian / Berger / Nerolac ) / Make / Colour Of Letter Sizes Between 12 To 24 At Sv / Ip / Rr & Terminal Piping, Equipment And Structure As Per The Direction Of Eic . The Item Includes Cost Of Material And All Resource Required For Lettering Complete ) , Part-A-Item - 75 - Supplying Melathion ( Hil ) For Lizard Control As Per Direction Of Eic , Part-A-Item - 76 - Supplying Carbolic Acid For Reptiles / Snakes / Scorpion Control As Per Direction Of Eic , Part-A-Item - 77 - Supplying Chloropyriphos Termite Control As Per Direction Of Eic , Part-A-Item - 78 - Supplying Cypermethin & Other Required Chemicals For Mosquito Control As Per Direction Of Eic , Part-A-Item - 79 - Supplying Glue Plate Rodent Control As Per Direction Of Eic , Part-A-Item - 80 - Supplying Red Cake / Zinc Phosphate ( Big Size ) @ 100Gm For Rodent Controlas Per Direction Of Eic Total Quantity : 1

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail