Bidhan Chandra Krishi Viswavidyalaya has published Supply, Installation, Demonstration And Maintenance Of Double Recirculating Aquaponics System ( Draps ) - Twenty Five Thousand Liter ( 25 KL ) Fish Tank : 1 Unita) PPGI corrugated roofing sheets of1 mm thickness : 325 sft.b) GI structural frame tubing,. Submission Date for this Tender is 18-11-2021. Brooms and Mops Tenders in Dharampur West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Twenty Five Thousand Liter ( 25 KL ) Fish Tank : 1 Unit a) PPGI corrugated roofing sheets of1 mm thickness : 325 sft. b) GI structural frame tubing, rectangular profile pipes : 275 ft. c) GI fasteners : M12 – M8 nuts, washers and bolts 120 GSM cold galvanized , self tapping drill screws : Lumpsum d) Geo-textile PP fabric 120 GSM for substrate lining : 675 sft. e) 500 micron UV stabilized HDPE protective liner : 380 sft. f) 650 GSM PVC wrinkle-free aquatic tank tarpaulin : 675 sft. |
2 | Aquaculture tank foundation & build civil works Cement, 20/10 mm stone chips, sand, 4.8-6 mm TMT re-bars,bricks and miscellaneous requirements : Lump sum |
3 | Fish tank supply, drainage and aeration pipelines 3” drain,1½” supply & ½ “ aeration lines and valves : 1 Unit a) 3” drain pipe line : pipes,valves, couplings & sieves : 1 Unit b) 1½” supply pipe line :S-40 pipes, valves & coupling : 1 Unit c) ½” air manifold : pipes, valves, grommets & fittings : 1 Unit |
4 | Aeration supply for fish tank and DWC grow-beds 1 HP Vortex ring blower X 2, 2” one - way valves, UPVC manifold pipes, fittings & valves, aeration tubing, take-offs, regulators, disc bubblers & wiring : 1 Unit |
5 | Aquaponic Filters : Radial Filter and Bio – Filter Radial filter with combined gravel filter for removal of bulk solid, bio-filter with enriched O2 aeration & high surface area bio-media and output line strainer : 1 Unit |
6 | Recirculating Aquaculture System : Filter Setup Integrated four compartment filter with RDSF, bio- filter, media filter & sump with inline UV sterilizer : 1 unit a) Rotating drum screen filter(30u) with auto backwash b) Enriched & atomized O2 fed HSA biological filter c) Foam & gravel based mechanical fine media filter d) Aerated sump with sensor probe holder & injectors e) 55 W ultraviolet light based inline sterilizer/clarifier |
7 | 5kW Automatic recirculating water heating unit 220V tankless water heater with temperature control : 1 Unit |
8 | Grow-bed Chanels(528 sq.ft.) & sump civilwork Six DWC grow channels 22" X 4" on 5" high platform Cement, 20/10 mm stone chips, sand, 6-8 mm TMT re-bars,wires,bricks and miscellaneous requirements : 1 Unit |
9 | Pumping setup : 1 HP Hi-Flow Pumps X 1, 1 HP regenerative pumps X 2, ½ HP utility regenerative pump X 1, valves, fittings, PVC manifolds & wiring : 4 Units |
10 | Grow-bed accessories : Grow media (vermiculite, perlite, hydroton, hydroponic sponges, rock-wool etc ), grow pots : 2” netted pots, and floating rafts : Lump sum |
11 | Oxygen concentrator for advanced Bio-filtration PSA based oxygen concentrator, working pressure 35 PSI , flow rate ~ 30 lpm, 82 % O2 concentration : 1 No. |
12 | Electrical & lighting system: Conduits, wires, fusesMCB"s, junction boxes, relays, voltmeters, switches. SW.boards, LED grow-light system, SMPS, cables, nuts,bolts & fasteners, panels and needed accessories : 1 Unit |
13 | Automation & control systems : Central controller system, PCB boards, IoT modules, sensors (temp , ORP,TDS,TSS,pH,O2,level etc), actuators (servos, solenoids, relays), MCU, IP enclosures, connectors, wires, interfaces and meters, microprocessors, relay & keypads, BT, Wifi & connect modules, TFTGUI: 1 Unit |
14 | Integrated filtration & conditioner unit : Three stage integrated filtration unit with pressurized inline water filter,iron filter & softener unit with backwash : 1 Unit |
15 | Build Costs: Labor, Fabrication and Transports Labor, supervision, fabrication and tooling charges, local and intercity transport and miscellaneous costs |
16 | SAAS (Software-as-a-service) based fullstack Farm Monitoring Application (FMA) with data monitoring modules, data collection modules and OLAP/OLTP database powered farm data fetching capability. |
17 | Wages of one worker at hi-tech polyhouse (15 days/month x 36 months) |
18 | AMC: charges of maintenance and support service (36 months) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail