| 1 | 1. Earthwork excavation upto 1.50m depth in ordinary soil, sand, clay mixed with roots, boulders, debris, rubbish etc. an existing at site of work for fixing the vertical pipes and other works including dressing of sides ramming of bottom as specified under relevant schedules and drawing depositing the excavated surplus earth as directed with in a lead of 50m including storing, strutting labour, tools, equipments etc. complete |
| 2 | 2. Dismantling and chipping the existing rich mix plain cement concrete from the existing road surface for providing speed breaker and wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m all as directed including all labour, tools, equipment, machineries etc., complete |
| 3 | 3. Providing and laying plain cement concrete of mix 1:4:8 involumetric proportions (1 cement : 4 c.s. sand : 8 stone aggregate (hard granite) 40mm size graded down to 20mm size) for leveling course in foundations, etc. including mixing, transporting, placing, ramming, consolidating, etc. including cement , all labour, materials, equipment, tools, etc. complete |
| 4 | 4. Providing and laying plain cement concrete of mix 1:1.5:3 involumetric proportions (1 cement : 1.5 c.s.sand : 3 stone aggregate (hard granite)20mm nominal size) for speed breaker in the existing road surface including mixing, transporting, placing, shuttering, ramming, vibrating,fuel etc. including cement, all labour, materials, equipment, tools, etc. complete. |
| 5 | 5. Providing fabricating and supply of Retro reflective cautionary warning and sign boards are embedded in necessary concrete with lamination of 600mm equilateral triangle shape in 2mm thickness of aluminium sheet with required colour of retreo reflective high intensity lens grade with both side symbols with the support of L angle frame made out of 25mmx25mmx3mm welded with suitable clamps of 35mmx35mmx5mm as board fixed with frame by SS bolts&nuts and supply required size and quantity of bolts and nuts with vertical post 3150mm height made out 75mmx75mmx5mm angle painted black and white colours each 300mm alternate bands as per the manufacturers specification of approved quality all as directed at site of work including all materials, scaffolding, labour, tools, transport, equipment, transportation, fuel , etc., complete 5a) Retro reflective speed breaker warning boards with vertical post painted black and white colours |
| 6 | 5b) Retro reflective speed indicator boards with vertical posts painted black & white colours. |
| 7 | 5c) Revised pavement markers (RPM) suitable to fix on the concrete surface |
| 8 | 6.Painting the reflective paint for speed breakers by applying two coats of reflective paint of make (Asian/Nerolac/Berger) of approved colour and good quality and even shade all as directed at site includingall labour, materials, transportation, brushes, tools, scaffolding, equipments, etc., complete. |
| 9 | 7.Applying concrete bonding agent over the dismantled concrete road portion for laying speed breakers with Roff bond repair by kwick fix solutions, epoxy based, latex based, polyster based polyurethane foams or equilent all as directed at site includingall labour, materials, transportation, brushes, tools, equipments, etc., complete |
| 10 | 8.Loading, transporting, dumping and leveling the earthwithin a lead of 2 Kms inside the port premises all as directed at site of work including all labour, tools, transport, fuel etc., complete8a) Earth |
| 11 | 8b)Debris |
| 12 | 1. Earthwork excavation upto 1.50m depth in ordinary soil, sand, clay mixed with roots, boulders, debris, rubbish etc. an existing at site of work for fixing the vertical pipes and other works including dressing of sides ramming of bottom as specified under relevant schedules and drawing depositing the excavated surplus earth as directed with in a lead of 50m including storing, strutting labour, tools, equipments etc. complete |
| 13 | 2. Dismantling and chipping the existing rich mix plain cement concrete from the existing road surface for providing speed breaker and wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m all as directed including all labour, tools, equipment, machineries etc., complete |
| 14 | 3. Providing and laying plain cement concrete of mix 1:4:8 involumetric proportions (1 cement : 4 c.s. sand : 8 stone aggregate (hard granite) 40mm size graded down to 20mm size) for leveling course in foundations, etc. including mixing, transporting, placing, ramming, consolidating, etc. including cement , all labour, materials, equipment, tools, etc. complete |
| 15 | 4. Providing and laying plain cement concrete of mix 1:1.5:3 involumetric proportions (1 cement : 1.5 c.s.sand : 3 stone aggregate (hard granite)20mm nominal size) for speed breaker in the existing road surface including mixing, transporting, placing, shuttering, ramming, vibrating,fuel etc. including cement, all labour, materials, equipment, tools, etc. complete. |
| 16 | 5. Providing fabricating and supply of Retro reflective cautionary warning and sign boards are embedded in necessary concrete with lamination of 600mm equilateral triangle shape in 2mm thickness of aluminium sheet with required colour of retreo reflective high intensity lens grade with both side symbols with the support of L angle frame made out of 25mmx25mmx3mm welded with suitable clamps of 35mmx35mmx5mm as board fixed with frame by SS bolts&nuts and supply required size and quantity of bolts and nuts with vertical post 3150mm height made out 75mmx75mmx5mm angle painted black and white colours each 300mm alternate bands as per the manufacturers specification of approved quality all as directed at site of work including all materials, scaffolding, labour, tools, transport, equipment, transportation, fuel , etc., complete 5a) Retro reflective speed breaker warning boards with vertical post painted black and white colours |
| 17 | 5b) Retro reflective speed indicator boards with vertical posts painted black & white colours. |
| 18 | 5c) Revised pavement markers (RPM) suitable to fix on the concrete surface |
| 19 | 6.Painting the reflective paint for speed breakers by applying two coats of reflective paint of make (Asian/Nerolac/Berger) of approved colour and good quality and even shade all as directed at site includingall labour, materials, transportation, brushes, tools, scaffolding, equipments, etc., complete. |
| 20 | 7.Applying concrete bonding agent over the dismantled concrete road portion for laying speed breakers with Roff bond repair by kwick fix solutions, epoxy based, latex based, polyster based polyurethane foams or equilent all as directed at site includingall labour, materials, transportation, brushes, tools, equipments, etc., complete |
| 21 | 8.Loading, transporting, dumping and leveling the earthwithin a lead of 2 Kms inside the port premises all as directed at site of work including all labour, tools, transport, fuel etc., complete8a) Earth |
| 22 | 8b)Debris |
| 23 | 1. Earthwork excavation upto 1.50m depth in ordinary soil, sand, clay mixed with roots, boulders, debris, rubbish etc. an existing at site of work for fixing the vertical pipes and other works including dressing of sides ramming of bottom as specified under relevant schedules and drawing depositing the excavated surplus earth as directed with in a lead of 50m including storing, strutting labour, tools, equipments etc. complete |
| 24 | 2. Dismantling and chipping the existing rich mix plain cement concrete from the existing road surface for providing speed breaker and wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m all as directed including all labour, tools, equipment, machineries etc., complete |
| 25 | 3. Providing and laying plain cement concrete of mix 1:4:8 involumetric proportions (1 cement : 4 c.s. sand : 8 stone aggregate (hard granite) 40mm size graded down to 20mm size) for leveling course in foundations, etc. including mixing, transporting, placing, ramming, consolidating, etc. including cement , all labour, materials, equipment, tools, etc. complete |
| 26 | 4. Providing and laying plain cement concrete of mix 1:1.5:3 involumetric proportions (1 cement : 1.5 c.s.sand : 3 stone aggregate (hard granite)20mm nominal size) for speed breaker in the existing road surface including mixing, transporting, placing, shuttering, ramming, vibrating,fuel etc. including cement, all labour, materials, equipment, tools, etc. complete. |
| 27 | 5. Providing fabricating and supply of Retro reflective cautionary warning and sign boards are embedded in necessary concrete with lamination of 600mm equilateral triangle shape in 2mm thickness of aluminium sheet with required colour of retreo reflective high intensity lens grade with both side symbols with the support of L angle frame made out of 25mmx25mmx3mm welded with suitable clamps of 35mmx35mmx5mm as board fixed with frame by SS bolts&nuts and supply required size and quantity of bolts and nuts with vertical post 3150mm height made out 75mmx75mmx5mm angle painted black and white colours each 300mm alternate bands as per the manufacturers specification of approved quality all as directed at site of work including all materials, scaffolding, labour, tools, transport, equipment, transportation, fuel , etc., complete 5a) Retro reflective speed breaker warning boards with vertical post painted black and white colours |
| 28 | 5b) Retro reflective speed indicator boards with vertical posts painted black & white colours. |
| 29 | 5c) Revised pavement markers (RPM) suitable to fix on the concrete surface |
| 30 | 6.Painting the reflective paint for speed breakers by applying two coats of reflective paint of make (Asian/Nerolac/Berger) of approved colour and good quality and even shade all as directed at site includingall labour, materials, transportation, brushes, tools, scaffolding, equipments, etc., complete. |
| 31 | 7.Applying concrete bonding agent over the dismantled concrete road portion for laying speed breakers with Roff bond repair by kwick fix solutions, epoxy based, latex based, polyster based polyurethane foams or equilent all as directed at site includingall labour, materials, transportation, brushes, tools, equipments, etc., complete |
| 32 | 8.Loading, transporting, dumping and leveling the earthwithin a lead of 2 Kms inside the port premises all as directed at site of work including all labour, tools, transport, fuel etc., complete8a) Earth |
| 33 | 8b)Debris |