Work Of Business Plan Under Edsd-Mant- 1 Safe Carriage Of 9 / 11 Mtr. Long Stp Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 50 Km. Including Loading & Unloading At Both Ends. 2 Safe Carriage Of 8.5

Tender Notice

29568609
Work Of Business Plan Under Edsd-Mant- 1 Safe Carriage Of 9 / 11 Mtr. Long Stp Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 50 Km. Including Loading & Unloading At Both Ends. 2 Safe Carriage Of 8.5
Indian
Uttar Pradesh
13-10-2021
20-10-2021
21-10-2021

Tender Details

Work Of Business Plan Under Edsd-Mant- 1 Safe Carriage Of 9 / 11 Mtr. Long Stp Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 50 Km. Including Loading & Unloading At Both Ends. 2 Safe Carriage Of 8.5 / 9 Mtr. Long Pcc Pole From Store Center Mathura / Nearest 33 / 11 Kv S / S To Direct Pit Site In Distance Range 0 To 50 Km. Including Loading & Unloading At Both Ends. 3 Safe Carriage Of Line Material From Store Center Mathura To Pit Site In Distance Range 0 To 50 Km. Including Loading & Unloading At Both Ends. 4 Errection Of 9 / 11 Mtr. Long Stp Poles As Single Support Including Fixing Of All Ht / Lt Accessories Etc, Grouting And Plinth As Per Respo Norms. 5 Errection Of 8.5 / 9 Mtr. Long Pcc Poles As Single Support Including Fixing Of All Ht / Lt Accessories Etc And Other Work Complete As Per Respo Norms. 6 Errection Of 9 / 11 Mtr. Long Stp Poles As D.Pole / Section Pole Including Fixing Of All Ht / Lt Accessories Etc, Grouting And Plinth As Per Respo Norms. 7 Errection Of 8.5 / 9 Mtr. Long Pcc Poles As D.Pole / Section Pole Including Fixing Of All Ht / Lt Accessories Etc And Other Work Complete As Per Respo Norms. 8 Dismantling And Removal Of Existing Acsr Weasel / Dog / Raccon / Rabbit Conductor From The Various Area, Stacking And Placement Their Coils And Their In The Respective J.E.’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage The Cost Of Labour T & P Carrier Etc. Required For Proper Completion Of Work. 9 Dismantling And Removal Of Existing Abc ( 50 / 95 / 120 Sqmm From Various Area, Stacking And Placement Their Coils And Their In The Respective J.E.’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage The Cost Of Labour T & P Carrier Etc. Required For Proper Completion Of Work. 10 "Laying Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Following Conductor On The Newly / Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. ( I ) Acsr Dog / Raccon" 11 "Laying Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Following Conductor On The Newly / Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. ( I ) Acsr Weasel " 12 "Laying Sagging Stringing, Binding, Jumpering & Fixing Of All Accessories Etc Of Following Abc On The Newly / Old Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Required For Proper Completion Of Work. ( I ) Abc 50 / 95 Sqmm" 13 ( Ii ) Abc 120 Sqmm 14 Straighting Of Tilted Pcc / R.S.Joist Poles Of Ht / Lt Line After Opening Of Nozzling, Digging Of Pit Applying Anti Direction Force For Making Of Proper Alignment Of Line. 15 Strainthing Of Tilted D / P After Opening Of Connection Applying Anti Direction Force, Digging Of Dug For Proper Alignment Of Line. 16 Opening Of Ht / Lt Connections & Lowering Of 25 / 63 Kva T / F From D / P And Shifting Up To In Safer Place. 17 "Re-Sagging Of Loose Conductor Of Following Line As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. ( A ) Of Lt Line " 18 ( B ) Of 11 Kv Line 19 "Re-Sagging Of Following Loose Abc As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P Carrier Etc Required For Proper Completion Of Work. ( A ) Of Abc 50 / 95 Sqmm" 20 ( B ) Abc 120 Sqmm 21 Earthling Of Pole With Ms Earth Rod As Per Respo Specification. 22 Retightening Of Stay Rod. Etc. Complete. 23 Providing Fixing Of Stay Rod With Nuzzling Etc. Complete. 24 "Replacement Of Following Broken / Damaged / Missing Accessories By New Accessories Including Opening Of The Same And Refixing. ( I ) 11 Kv Cross Arms ‘V’ Type" 25 ( Ii ) 11 Kv Pin Insulator 26 ( Iii ) 11 Kv Pin With Nut 27 ( Iv ) 11 Kv Disc Insulator 28 ( V ) Cross Arms Holding Clamps 29 ( Vi ) F Clamps 30 ( Vii ) Stays Clamp 31 ( Viii ) Lt Pin Clamp 32 ( Ix ) Shackle Insulator 33 Carriage Of Old Material From Pit Site To Je Store / Store Center Mathura In Distance Range 0 To 50 Km. Including Loading & Unloading And Proper Stacking. 34 Mounting Of 25 / 63 Kv Transformers On Double Pole Including Making Of The Connection Etc Complete. 35 Repairing / Resagging / New Guarding Of Ht Line With Gi Wire As Per Respo Norms. 36 Chopping Of Tree Branches 37 "Replacement Of Distribution Transformers Under Increasing Capacity As Per Following Details :- ( I ) Opening Of Ht / Lt Connnections And Safe Carriage Upto Distance Of 60 Km To Je Store / Store Centre Mathura And Safe Unloading Of 25 / 63 Kva Distribution Transformer." 38 ( Ii ) Safe Loading And Carriage Of Distribution Transformers ( 63 / 100 ) And Proper Installation And Making Ht / Lt Connection''s Of The Same To Energize Them.

Key Value

Document Fees
INR 236 /-
EMD
INR 2000.00 /-
Tender Value
Refer document

BOQ Items

Name of Work : Work of Buissness plan under EDSD-Mant
Sl. No. Item Description
1Safe carriage of 9/11 mtr. Long STP pole from store center Mathura/nearest 33/11 KV S/S to direct pit site in distance range 0 to 50 Km. Including loading & unloading at both ends.
2Safe carriage of 8.5/9 mtr. Long PCC pole from store center Mathura/nearest 33/11 KV S/S to direct pit site in distance range 0 to 50 Km. Including loading & unloading at both ends.
3Safe carriage of line material from store center Mathura to pit site in distance range 0 to 50 km. Including loading & unloading at both ends.
4Errection of 9/11mtr. long STP poles as single support including fixing of all HT/LT accessories etc, grouting and plinth as per RESPO norms.
5Errection of 8.5/9mtr. long PCC poles as single support including fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
6Errection of 9/11 mtr. long STP poles as D.Pole/section poleincluding fixing of all HT/LT accessories etc, grouting and plinth as per RESPO norms.
7Errection of 8.5/9 mtr. long PCC poles as D.Pole/section poleincluding fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
8Dismantling and removal of existing ACSR Weasel/Dog/Raccon/Rabbit conductor from the various area, stacking and placement their coils and their in the respective J.E.’s (Store) as per direction of supervising engineer. It includes the work of cartage the cost of labour T & P carrier etc. required for proper completion of work.
9Dismantling and removal of existing ABC (50/95/120 sqmm from various area, stacking and placement their coils and their in the respective J.E.’s (Store) as per direction of supervising engineer. It includes the work of cartage the cost of labour T & P carrier etc. required for proper completion of work.
10Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. (i)ACSR Dog/Raccon
11Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. (i)ACSR weasel
12Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following ABC on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. (i)ABC 50/95 sqmm
13(ii) ABC 120 sqmm
14Straighting of tilted PCC/R.S.Joist poles of HT/LT line after opening of nozzling, digging of pit applying anti direction force for making of proper alignment of line.
15Strainthing of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line.
16Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P and shifting up to in safer place.
17Re-sagging of loose conductor of following line as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. (a) Of LT Line
18(b) Of 11 KV Line
19Re-sagging of following loose ABC as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. (a) Of ABC 50/95 Sqmm
20(b) ABC 120 Sqmm
21Earthling of Pole with MS Earth Rod as per RESPO Specification.
22Retightening of Stay rod. Etc. complete.
23Providingfixing of stay rod with nuzzling etc. complete.
24Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing. (i)11 KV cross arms ‘V’ type
25(ii) 11 KV pin insulator
26(iii)11 KV pin with nut
27(iv)11 KV disc insulator
28(v) Cross arms holding clamps
29(vi) F clamps
30(vii)Stays Clamp
31(viii) LT pin clamp
32(ix)Shackle insulator
33Carriage of old material from pit site to JE store/store center Mathura in distance range 0 to 50 km. including loading & unloading and proper stacking.
34Mounting of 25/63 KV Transformers on double pole including making of the connection etc complete.
35Repairing/ resagging/ new guardingof HT Line with GI wire as per RESPO Norms.
36Chopping of tree branches
37Replacement of Distribution Transformers under increasing capacity as per following Details :- (i)Opening of HT/LT Connnections and safe carriage upto distance of 60 Km to JE Store/Store Centre Mathura and Safe unloading of 25/63 KVA Distribution Transformer.
38(ii) Safe Loading and carriage of Distribution Transformers (63/100) and Proper Installation and making HT/LT connection"s of the same to energize them.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail