| 1 | Demolishing lime concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as perdirection of the Engineer- in-charge:- In cement mortar. |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area beyond 3 sqm. |
| 3 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge |
| 4 | Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:- |
| 5 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re- plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-charge. |
| 6 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : |
| 7 | Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc.complete as perdirection of the Engineer- in-charge. |
| 8 | Supplying and filling in plinth, under floor, foundations etc.with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) |
| 10 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 12 | 15 mm cement plaster on the rough side of single or half brick wall of mix: |
| 13 | 15 mm cement plaster on the rough side of single or half brick wall of mix: Neat cement punning. |
| 14 | 12 mm cement plaster of mix |
| 15 | 12 mm cement plaster of mix including neat cement puming. |
| 16 | Providing and fixing G.I. pipes of medim class as per IS : 1239 with latest amendment complete with G.I. fittings and clamps, including cutting and making good the walls etc. complete as per CPWD specification and direction of the Engineer - in - charge. Internal work - Exposed on wall. (i) 40mm dia |
| 17 | (ii) 20 mm dia |
| 18 | In grating, frames, guard bar, railing, brackets, gates and similar works, all complete. |
| 19 | Providing and fixing ball valve (brass) of approved quality High or low pressure, with plastic floats complete : |
| 20 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete as per CPWD specification and direction of the Engineer - in - charge.(New work) (i) 20 mm |
| 21 | (ii) 40 mm |
| 22 | Painting with synthetic enamel paint ( one or more coats ) of required colour of approved brand and manufacture on old work to give an even shade including preparation of surface as required complete as per direction of the Engineer in charge. Hard drawn |
| 23 | Painting on G.S. sheet with synthetic enamel paint ( one or more coats ) of approved brand and manufacture of required colour to give an even shade on old work including preparation of surface as required complete as per direction of the Engineer in charge:- |
| 24 | Finishing walls with water proofing cement paint of required shade of approved brand and manufacture on old work ( one or more coats ) including preparation of surface as required complete as per direction of the Engineer in charge. |
| 25 | Hiring charge of Maruti Omni (Haltage and mileage) will be recorded and signed by both the Engineer-in-charge and the agency. |
| 26 | Transportation charge of work supervision by Maruti Omni (as needed time by the Engineer-in-charge) the agency will arrange vehicle as mentioned above at his own cost and risk. |