}

Tank Farm Area Pumps Tank Farm Area Pumps For Numaligarh Refinery Expansion Project , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Crude Oil Pump With Motor ( 1S, NUMALIGARH-Assam

Numaligarh Refinery Limited has published Tank Farm Area Pumps Tank Farm Area Pumps For Numaligarh Refinery Expansion Project , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Crude Oil Pump With Motor ( 1S. Submission Date for this Tender is 22-11-2021. Lubricating Oils Tenders in NUMALIGARH Assam. Bidders can get complete Tender details and download the document.




Tender Notice

29506850
Corrigendum : Tank Farm Area Pumps Tank Farm Area Pumps For Numaligarh Refinery Expansion Project , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Crude Oil Pump With Motor ( 1S
Open Tender
Indian
Assam
Numaligarh
22-11-2021

Tender Details

Tank Farm Area Pumps Tank Farm Area Pumps For Numaligarh Refinery Expansion Project , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Crude Oil Pump With Motor ( 1S71-Pa-0411 A / B / C ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr, And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables, Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Nht Feed Pump With Motor ( 1S72-Pa / Pm-1211 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr, And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables, Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Sr Vgo Pump With Motor ( 1S72-Pa / Pm-2811 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr, And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Rptu Feed Pump With Motor ( 1S72-Pa / Pm-2211 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr, And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Dcu Feed Pump With Motor ( 1S72-Pa / Pm-2011 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Pfcc Feed Pump With Motor ( 1S72-Pa / Pm-2812 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Partii Of Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Hcgo Pump With Motor ( 1S72-Pa / Pm-0311 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Partof Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Gds Feed Pump With Motor ( 1S72-Pa / Pm-3011 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Partof Sr, And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Dht Feed Pump With Motor ( 1S72-Pa / Pm-0611 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Light Slop Pump With Motor ( 1S72-Pa / Pm-1611 A / B ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables , Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running. , Design, Engineering, Procurement, Manufacturing, Packaging, Inspection, Testing, Transportation, Road Survey ( If Required ) Of Dm Water Distribution Pump With Motor ( 1U59-Pa / Pm-4603 A / B / C ) With Accessories, Commissioning Spares, Special Tools, Drawing And Documents As Per Vendor Data Requirement In Part Ii Of Sr , And First Fill Of All Lubricants ( Oil, Grease ) And Barrier Fluid As Required And Consumables, Required For Pre-Commissioning, Trial Runs And Six Months Continuous Running.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 10-11-2021 CORRIGENDUM_02_COMMERCIAL Date 22-11-2021
2 10-11-2021 ADDENDUM_01_TECHNICAL Other 22-11-2021
3 27-10-2021 TQ_RESPONSE_01 Other 28-10-2021
4 27-10-2021 CORRIGENDUM_01 Date 11-11-2021
5 28-10-2021 TQ_RESPONSE_02 Other 11-11-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail