}

Earth Work Excavation In All Classes Of Soil / Rubble Stones For Making Raft Foundation, Including Dewatering Using Suitable Capacity Submersible Pump, Making Earthen Pit For Ground Water / -Kerala

Indian Rare Earths Limited has published Earth Work Excavation In All Classes Of Soil / Rubble Stones For Making Raft Foundation, Including Dewatering Using Suitable Capacity Submersible Pump, Making Earthen Pit For Ground Water / . Submission Date for this Tender is 26-10-2021. Bolts Tenders in Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

29480810
Earth Work Excavation In All Classes Of Soil / Rubble Stones For Making Raft Foundation, Including Dewatering Using Suitable Capacity Submersible Pump, Making Earthen Pit For Ground Water /
Tender
Indian
Kerala
26-10-2021

Tender Details

Earth Work Excavation In All Classes Of Soil / Rubble Stones For Making Raft Foundation, Including Dewatering Using Suitable Capacity Submersible Pump, Making Earthen Pit For Ground Water / Rain Water Pumping, Ramming The Bottom Of Excavation To Correct Levels & Lines And Disposing The Excess Earth To Disposal Yard Within Distance Of 750 M. The Rate Shall Include Labour Charges, Hire Charges For Tools & Machineries, Transportation Cost Of Vehicles Required For Completion Of Work., Providing And Laying In Position Plain Cement Concrete Mix 1:3:6 ( 1 Cement, 3 Coarse Sand And 6 Graded Broken Stone Aggregate 40-20Mm Nominal Size ) After Ramming Of Existing Earth, Well Compacted, Side Shuttering, Finishing Smooth To A Fair Face At All Levels, Curing Etc., Complete. The Rate Shall Include Cost Of All Materials Including Cement, Labour Charges, Mixing, Laying, Cleaning, Lead & Lift Of All Materials, Cost Of Tools Etc., To Carry Out The Complete Work. , Providing & Laying Of Reinforced Cement Concrete Rcc ( M30 Grade As Per Is 456 ) For Foundation Of Raft, Tank, Columns, Tie Beams, Sump, Pit, Floor Concrete Etc., With A Minimum Cement Content Of 350 Kg / M3 Of Concrete By Using 20-10 Mm Downgraded Stones, Machine Mixed, Mechanically Vibrated, Consolidated, Curing, Including Usage Of Quality Material As Approved, Cost, Conveyance, Lead, Lift Of All Materials, Labour, Necessary Scaffolding Etc., But Excluding Cost Of Formwork And Reinforcement Work Which Will Be Paid Separately Under Relevant Item. Wherever Possible Ready Mix Concrete May Be Carried Out At Required Places As Directed By Engineer-In-Charge With Prior Approval. The Rate Shall Include Labour Charges & Cost Of All Materials Including Cement, Scaffolding Charges, Staging, Working Platform, Etc. For Carrying Out The Complete Work. , Supply & Laying Reinforcement High Yield Strength Deformed ( Hysd ) Bars Fe 500 Grade, Cutting To Required Size, Bending & Placing In Position, Binding With 18 / 20 Gauge Black Annealed / Gi Tying Wire, Including Lead, Lift Of Reinforcement To Site, Laying As Per Drawing And Directed By Engineer-In-Charge ( Weight Of Steel Bar Shall Be Taken As Per Relevant Is Standard ) . The Rates Shall Include Labour Charges, Cost Of Reinforcement, & Binding Wire, Tools, Etc., For Carrying Out The Complete Work., Providing Shuttering / Formwork For Raft, Equipment, Tank Foundations, Column Footing Etc., Using Plywood With Sufficient Wooden Runners Or Ms Sheets With Enough Strength To Withstand The Load Of Mechanical Vibrator During Compaction Of Concrete. The Rates Shall Include Labour Charges For Fixing And Removal Of Formwork After Use, Rental Charges / Cost Of Materials, Transportation Etc., Required For The Complete Work. , Providing Masonry Work In Cm 1:5, Using Standard Size Concrete Blocks Of Good Quality Including Racking Out Of Joints, Finishing To Proper Lines Levels, Curing, Scaffolding, And Platform Required For The Work Etc., Complete. The Rate Shall Include Labour Charges, Cost Of All Materials Including Cement, Concrete Blocks, M-Sand, Scaffolding / Platform Work For Carrying Out The Complete Work. , Providing Plastering In Cm 1:5, 12 Mm Thick Average In Masonry Structure Wherever Required, Mixing & Application Of Mortar, Finishing Smooth, Proper Line & Level All Required For Completion Of Work Supply & Fixing Ms Bolts & Nut, Washer Plate Of 25Mm Dia ?36 Nos. With 1100Mm Length & About 175Mm Thread At Top In Rcc Foundations , Providing Non Shrinkage Grouting 50 Mm Thick At Top Of Foundation , Shifting, Filling, Laying & Levelling Of Concrete / Brick Debris , Supplying, Filling, Laying & Leveling Gravelly Red Earth , Dismantling Of Rcc Floor Concrete, Drainage Pit Etc., Supply And Supervision Of Skilled / Semiskilled Labour

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail