Department Of Information And Cultural Affairs has published Engagement Of Event Management Agency For Decoration And Designing At Nandan - Rabindra Sadan - Kolkata Information Centre Campus For 8 Days- 1 Venue Branding At Nandan & Rabindra Sadan Campus For 8Days 2 3D Overhead Customized Thematic Gate Of Size (. Submission Date for this Tender is 27-10-2021. Cosmetics Tenders in Nandan West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Oct-2021 | Due Date Extended | Admin Corrigendum Date Extend | 27-10-2021 |
Sl. No. | Item Description |
1 | Venue Branding at Nandan & Rabindra Sadan Campus for 8days |
2 | 3D Overhead Customized Thematic Gate of size (12" x 4" x 4", overhead 16") with branding. Decoration of the gates will be made by flex printing/ painted Ply cut out/ Flex/ Starflex/ backlits (design CD will be supplied by I&CA Deptt and with proper illumination. |
3 | 2-D customized Gate with decoration & lettering of size (12" x 4", overhead 16"with backside masking):Decoration of the gates will be made by flex printing/painted Ply cut out/ Flex/ Starflex/ backlits(design CD will be supplied by I&CA Deptt andwith proper illumination, if required (Bangla Academy, Sisir Mancha Entrance, Ektara Mancha). |
4 | Iron Structure standee of size (8" x 4") using flex and fitting, fixing, transportation & dismantling. Creative design will be provided in due course. |
5 | Wooden Structure standee of size (8" x 4") using flex and fitting, fixing, transportation & dismantling. Creative design will be provided in due course |
6 | Wooden structure hoarding of size (10" x 5") using flex and fitting, fixing, transportation & dismantling. Creative design will be provided in due course |
7 | Wooden structure hoarding with programme schedule of size (8" x 6")using flex and fitting, fixing, transportation & dismantling. Creative design will be provided in due course |
8 | Flex without wooden structure for entire premises including fitting, fixing, transportation & dismantling. Creative design will be provided in due course |
9 | Directional signage inside the entire premises of Nandan, Rabindra Sadan, Sisir Mancha, KIC, Charukala, Gagaendra including fitting, fixing, transportation & dismantling (2 ft X 1.5 ft ) |
10 | Arrangement of channel sound system inside the campus along with announcement facility from two end for 8 days. |
11 | Arrangement of temporary partitioned using octanorm material at KIC, Sisir Mancha, Rabindra Sadan and Nandan including Curtains (size 500 running ft) |
12 | Supply of chairs in different temporary offices inside the Nandan- Rabindra Sadan, KIC campus. |
13 | Supply of tables in different temporary offices inside the Nandan- Rabindra Sadan, KIC campus. |
14 | Supply of almirah in different temporary offices inside the Nandan- Rabindra Sadan, KIC campus. |
15 | Co-ordination of publicity and information on all social media including preparation of AV & audio clips as required. |
16 | Organisation of flash publicity on 3 days inclusive of all in the run-up to the KIFF, such events to cover at least 3 venues on each days |
17 | Organisation of press conferences for announcement of KIFF opening ceremony including sound system, stage decoration, stage run with accesories, flower bouquet,logo inauguration, audio-visual presentation, adequate sound system, manpower support, 2 plasma TV etc |
18 | Programme Chart with wooden structure with flex printing of the Venue for Bangla Academy (8 ft X 4 ft). Flex will be changed daily basis for daily programme. |
19 | Programme Chart with wooden structure with flex printing of the Venue for Ektara Mancha (8 ft X 4 ft). Flex will be changed daily basis for daily programme. |
20 | S&F Generator, 125 KV, sound proof, for power backup for 8 days |
21 | Floral Decoration for 8 days |
22 | Floral decoration (Orchid & other decorative flower) in the campus of Rabindra Sadan & Nandancampus for 8 days & flower must be changed at least 2 times in the total festival period. |
23 | Floral decoration (Orchid & other decorative flower) inside the Nandan for 8 days & flower must be changed for at least 2 times in the total festive period. |
24 | Floral Decoration (Orchid & other decorative flower) inside the meeting room of Nandan for 8 days & flower must be changed at least 3 times in the total festive period. |
25 | Flower Bouquet for receiving VVIPs, honorable guest, during presentation of the films, during press conference |
26 | Every Day decoration at Nandan for 8 days (regular change/ face lifting). Change once during KIFF |
27 | Stalls & Desk in the entire premises of Nandan & Rabindra Sadan for 8 days |
28 | 3X3 mtrs. Octanorm stalls with tarpaulin cover, three side rack, carpet on floor, 2 chairs, 2 counter table, fan, sufficient light, 15Amp. Power board, cloth in ceiling & front facia. |
29 | 3X3 mtrs. Bamboo structure stalls with tarpaulin cover, three side rack, carpet on floor, 2 chairs, 2 counter table, fan, sufficient light, 15Amp. Power board, cloth in ceiling, front facia and collapsible gate |
30 | Enquiry Desk in the Nandan Premises |
31 | Ticket Desk in the Nandan Premises |
32 | Lightin the entire premises of Nandan & Rabindra Sadan for 8 days |
33 | Venue light for entire premises Rabindra Sadan- Nandan – KIC Campus(1000 wt) |
34 | Light engineer for 8 days. |
35 | Decorative light in the entire premises for Rabindra Sadan- Nandan – KIC Campus. |
36 | S&F Generator, 125 KV, sound proof, for electricity supply and power backup for 7days (Fuel cost will be provided separately on the basis of actual comsumption). |
37 | Temporary venue at Bangla Academy Sabhaghar for 8 days |
38 | Temporary sound system for Bangla Academy Sabhagharwith all facilities for workshop/ seminar etc. |
39 | Sufficient Lighting arrangement for Bangla Academy Sabhaghar |
40 | Arrangement of backdrop & Decoration for for Bangla Academy sabhaghar and other items for organising different events like panel discussion, |
41 | Press Media Zone for 8days |
42 | Development of Press media Zone with proper lighting, manpower , branding , sound system etc, at Nandan –IV with all facilities like, sound system, Xerox machine with toner ink. |
43 | Manpower & Securityfor Nandan - Rabindra Sadan entire premises for 8days |
44 | Event Boys for co-ordination with International and national Guests |
45 | Events Girls for co-ordination with International and national Guests |
46 | Presentation support staff with Event Boys for 2 venues around Kolkata |
47 | Hospitality / Reception support staff with Event Boys for 3 Hotels in &around Kolkata |
48 | Guest Management system with supervisor |
49 | Event Supervisor |
50 | Round clock security for the entire premises for 8days (at least 20 nos.) |
51 | Office for Escort at Nandan-II for 8 days |
52 | Escort personnel |
53 | Team leader for escort |
54 | Escort Supervisor |
55 | Escort Manager |
56 | Thematic decoration for 27th KIFF |
57 | Thematic installation of creative Ideas & execution for Rabindra Sadan & Nandan Campus for 8days |
58 | Thematic Wall Branding at Nandan Premises & outside wall of Sisir Mancha and Rabindra Sadan, as per theme of branding ideas for 8 days |
59 | Cut Out at Nandan Rabindra Sadan Complex as per theme of the KIFF |
60 | Thematic installation of lighting Ideas for Rabindra Sadan- Nandan – KIC Campus for 8days, with approved design and creative of KIFF |
61 | Installation on different part of the venue per theme of the KIFF |
62 | Scaffholding with decorative items |
63 | Fire services : Fire-fighting equipments,extinguishers:(Submission of Approval or certification of necessary statutory body is mandatory) |
64 | A B C Type Dry Powder Fire Extinguisher & spray - 4/6 Kg capacity as per statutory requirement (All Panels/ Dist. Boards area must be barricaded with complete installation of fire extinguishers). This is applicable for entire premises and surroundings. Rate should be quoted considering all necessary works in this regard |
65 | CO2 Fire Extinguisher & spray - 4/6 Kg capacity as per statutory requirement (All Panels/ Dist. Boards area must be barricaded with complete installation of fire extinguishers).This is applicable for entire premises and surroundings. Rate should be quoted considering all necessary works in this regard |
66 | Misc. |
67 | Webcasting & internet Connection |
68 | Anchor for Nandan & rabindra Sadan Campus for 8 days |
69 | Sanitisation for 8days |
70 | Hand sanitizer liquid for entire event |
71 | Hand sanitizer spray bottles |
72 | Manpower support for assisting sanitization with proper PPE dress |
73 | Mask with KIFF branding |
74 | Disposable Plastic gloves |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail