| 1 | Supply Part |
| 2 | Providing Prefabricated Galvanizedsteel for 132kV multicircuit tower( Stub+Basic Body)for NSZ |
| 3 | Nut Bolts |
| 4 | Tower Accessories |
| 5 | Pipe Type earthing set |
| 6 | Counterpoise Type earthing set |
| 7 | Danger plate complete with nuts& bolts with washers |
| 8 | Number Plates complete with nuts& bolts with washers |
| 9 | Phase Plates complete with nuts& bolts with washers |
| 10 | Circuit Plates complete with nuts& bolts with washers |
| 11 | Anti Climbing Devices (I/C Barberd Wire ) |
| 12 | ACSR panther Conductor |
| 13 | OPGW |
| 14 | Conductor Hard ware fitting |
| 15 | Stock Bridge vibration Dampers |
| 16 | Mid Span Compression Joints |
| 17 | Tension assembly |
| 18 | For jumpers |
| 19 | PolymerInsulators ( 90 KN Silicon Insulator string) |
| 20 | PolymerInsulators ( 70 KN Silicon Insulator string for pilot string) |
| 21 | Erection Part |
| 22 | Erection of multi circuit Tower alongwithdanger plate, number plate., circuit plate, phase plate, bird guard, anti-climbing devices etc. complete in all respect as per direction of Engineer-in-charge. |
| 23 | Stub Setting oftowers, special structures and gantries including form work. |
| 24 | Mounting of insulator string for three Nos. ACSR Panther Conductor including laying, jointing, tensioining, stringing, sagging and clamping of conductor, fixing of vibration dampers, arching horns etc. complete in all respect. |
| 25 | Stringing of OPGW |
| 26 | Pipe type/ counterpoiseEarthingcomplete as per direction of Engineer-in-charge. |
| 27 | Excavation in foundations, trenches etc. in earth work , lift up to 1.5m stacking the excavated soil not more than 3.00 m clear from the edge of the excavation and then returning the stacked soil in 15 cm. layers when required in to the plinth side of the foundation etc. Consolidating each deposited layer by ramming and watering and then disposing of all the surplus excavated earth for all leads /lift and for all kinds of soil. |
| 28 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand:6 graded stone aggregate 40mm nominal size) and curing completeexcluding cost of centering and shuttering in foundation and plinth. |
| 29 | Providing and laying cement concrete 1:1.5:3 (1 cement :1.5: Sand : 3 graded stone aggregate 20 mm nominal size and curing complete excluding cost of form work. Foundation and plinth : |
| 30 | Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level :Tor Steel : |
| 31 | Tack welding of tower. |